Revised Monthly Operating Repts for Jan 1989 for Vogtle Units 1 & 2
ML20246J798
Person / Time
Site: Vogtle  
Issue date: 01/31/1989
From: Moye R
GEORGIA POWER CO.
To:
References
NUDOCS 8903210423
Download: ML20246J798 (5)


Text

-

I GEORGIA POWER

~

COMPANY MONTHLY OPERATING DATA REPORTS PLANT V0GTLE UNITS 1 AND 2

'IdY-M [$ @

=

ei- "

I l

h

~u

-T

\\

y. -'

  • 3

~.

A j

'ff

' f[M

% -:r-4 1 I D

4 A'l s'

r, a

3

r-Ji.

l 1

ENCLOSURE 1 PLANT V0GTLE.- UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 REVISED MONTHLY OPERATING REPORT FOR JANUARY,1989 TABLE OF CONTENTS NARRATIVE REPORT Page El-1 OPERATING DATA REPORT-Page El-2.

AVERAGE DAILY POWER LEVEL Page El-3 UNIT SHUTDOWNS AND POWER LEVELS.

Page El-4 i

i i

l 1

i E

6

~

.s' NARRATIVE REPORT DOCKET NO.

50-424 i

UNIT l' DATE:

FEB 10, 1989

.l' COMPLETED BY:,R. A. H0YE i

TELEPHONE:

(404) 724-8114 x3212 JANUARY 1 0:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

l JANUARY 19 13:50 PREPARING FOR PLANT SHUTDOWN DUE TO PRESSURE BOUNDARY LEAK l

~ JANUARY 19 14:30 DECREASING LOAD.

JANUARY 19 17:35 UNIT 1 REACTOR Mt.NUALLY TRIPPED TO REPAIR PRESSURE B0UNDARY LEAK.

JANUARY 20 08:20 UNIT 1 ENTERED MODE 5.

JANUARY 25 12:07 UNIT'1 ENTERED MODE 4.

JANUARY 25 21:52 UNIT 1 ENTERED MODE 3.

JANUARY 27' 12:42 UNIT 1 ENTERED MODE 2.

JANUARY 27 13:12 REACTOR BECAME CRITICAL.

JANUARY.27 19:34-UNIT 1 ENTERED MODE 1.

JANUARY 28 05:00 UNIT 1 TIED T0-GRID.

JANUARY 29 05:38 -UNIT 1 AT 100% POWER.

I JANUARY 31 23:59. UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

l 1

El-1 1

l l

lL_

2__ ____ _ _ - - _

i a

OPERATING DATA REPORT

' DOCKET NO. 50-424 i

1989 I

i DATE:

FEB-10,R.A. M0YE COMPLETED BY:

l TELEPHONE:-(404)?724-8114 x3212 OPERATING STATUS

1. UNIT NAME:

A. W. V0GTLE UNIT 1 2.. REPORT' PERIOD:

JAN 89 MWt :

3411 l

e

3. LICENSED THERMAU POWER (MWe :
4. NAMEPLATE RATING (GROSS 1148 I
5. DESIGN ELECTRICAL RATING,(N T MWe):

1101

6. MAXIMUM DEPENDABLE CAPACITY I' GROSS MWe):

1137

  • 7.MAXIMUMDEPENDABLECAPACITY[NETMWe):

1083 *,

8. IF CHANGES OCCUR IN CAPACITY RATINGS

.(ITEMS 3 THROUGH 7) COOLING TOWER IMPROVEMENTS.SINCE LAST REPORT, GIVE REASO l

4 MEGAWATTS DUE TO

-9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:

" N/A THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744 744-l 11431.5 l 14665

12. NUMBER OF HOURS REAGTOR WAS CRITICAL:

556.4 I 556.4

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

540.6 l 540.6-l 11033.3 I

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 -

1771903

36203058.6 0.0 0.0 l

16. G'ROSS THERMAL ENERGY GENERATED MWH 1771903
17. GROSS ELEC. ENERGY GENERATED (M H):):

l 587920 587920 11977090

18. NET ELEC. ENERGY GENERATED (MWH :

552000 552000 11264130

19. REACTOR SERVICE FACTOR 74.8%

74.8%

78.0%

20. REACTOR AVAILABILITY FACTOR 74.8%

74.8%

78.0%

21. UNIT SERVICE FACTOR:

72.7%

72.7%

75;2%

22. UNIT AVAILABILITY FACTOR:

72.7%

72.7%

-75.2%

23. UNIT CAPACITY FACTOR ~ USING MDC NET):

68.5%

68.5%

71.2%

24. UNIT CAPACITY FACTOR USING DER NET):

67.4%.

67.4%

69.8%

25. UNIT FORCED OUTAGE RA E:

27.3% l 27.3% 1 15.7%l

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

28. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION):

N/A l

a l

l El-2 I

I 6...

1 UNIT 1 AVERAGE DAILY DOCKET NO.

50-424-l FEB 10, 1989 l l POWER LEVEL DATE:

R. A. MOYE COMPLETED BY:

TELEPHONE:

(404) 724-8114 x3212 DAY Net MW 1.........

1099

  • 2.........

1111

  • 3.........

1107

  • 1 m

4.........

1112

  • l 5.........

1112

  • l 6.........

1105

  • l 7.........

1099 *

'l 8..........

1098

  • 9.........

1062 10.........

-1038 11.........

1004 12.........

982 13.........

,966'-

14.........

-982 15.........

970 16.........

965 i

17.........

978-4 l

l 18.........

1040 i

N 19.........

741 i

i 20.........

0 l

21.........

0 22.........

0 23.........

0 24.........

0-25.........

0 26.........

0 27.........

0 28.........

416 29.........

1089

  • 30.........

1062 l

l-31.........

1099

  • l MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS

.i 1

l i

El-3

+

L UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-424 DATE:

FEB 10, 1989 l

UNIT NAME:

V0GTLE UNIT 1 COMPLETED BY: R. A. M0YE TELEPHONE:

(404) 724-8114 x3212 REPORT MONTH JAN 89 R

M 5

E E

Y T

A T

LICENSEE SC Y

S H

EVENT T0 COMP 0NENT CAUSE & CORRECTIVE P

DURATION 0

0 REPORT ED CODE ACTION TO N0.

DATE E

(HOURS)

N D

NUMBER HE (SUBCODE)

PREVENT RECURRENCE 89-1 TFIT T 203.42 A T 89-004 T

PLR 5th BELOW F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 2 - MANUAL SCRAM 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.

E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE.

9 - OTHER (EXPLAIN)

G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN) 89-1 CAUSE: HIGH VIBRATION DUE TO INADEQUATE PIPING SUPPORT ON A DRAIN'LINE MANIFOLD CAUSING A CRACK TO DEVELOP IN A WELDED COUPLING.

89-1 CORRECTIVE' ACTION:

CRACK WAS REPAIRED AND NEW PIPE SUPPORTS ADDED TO REDUCE VIBRATION.

El-4

.m.

1 ENCLOSURE 2 PLANT V0GTLE'- UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 i

MONTHLY OPERATING REPORT FOR FEBRUARYi 1989 TABLE OF CONTENTS NARRATIVE REPORT-

' Page E2-1:

9 OPERATING DATA REPORT Page E2-2 AVERAGE 3AILY POWER LEVEL Page E2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page E2 -

e l

1

.,1 O

f~90'3~2 V 0 2 f /7 yN.

. =: -

, ~.

I

\\

NARRATIVE REPORT DOCKET NO.

50-424 UNIT 1 DATE:

MAR 5, 1989 COMPLETED BY.: R.A. MOYE TELEPHONE:

(404) 724-8114 x3212 0

FEBRUARY 1.

00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

FEBRUARY 10. 00:53 REACTOR MANUALLY TRIPPED, ENTER MODE 3.

FEBRUARY 11 02:22 UNIT 1 ENTERS MODE 2.

'I FEBRUARY 11 05:10 REACTOR BECAME CRITICAL.

FEBRUARY 12 01:44 UNIT 1 ENTERS MODE 1.

FEBRUARY 12 11:36 UNIT 1 TIED TO GRID.

FEBRUARY 20 18:00 UNIT l'AT 100% POWER.

FEBRUARY 28 11:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

l l

?

i-I e

E2-1

.m l '.-

OPERATING DATA REPORT DOCKET NO. 50-424'

'DATE: MAR 5, 1989 COMPLETED BY: R.A. M0YE TELEPHONE:;(404) 724-8114'x3212 1

OPERATING STATUS

'l

1. UNIT NAME: 1 A. W.'V0GTLE UNIT 1
2. REPORT PERIOD:

MAR 89

3. LICENSED THERMAL POWER 3411

'4.. NAMEPLATE RATING (GROSS (MWt :

MWe :

1148

5. DESIGN ELECTRICAL RATING (N T MWe):

1101

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1137

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1083

8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE.LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF.ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:'

N/A-THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

672 1416 15337

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

643.7 1200.1 12075.2

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

613.3 1153.8 11646.6 15.. UNIT RESERVE ~ SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED MWH 1905573
3677476 38108631.9
17. GROSS ELEC. ENERGY GENERATED'(M H):):

635870 1223790 12613860

18. NET ELEC. ENERGY GENERATED (MWH :

600480

19. REACTOR SERVICE FACTOR 95.8%.

' 1152480 11864610 84.8%

78.7%

20. REACTOR AVAILABILITY FACTOR 95'8%

84.8%

78.7%

21. UNIT SERVICE FACTOR:

91.3%.

81.5%

75.9%

22. UNIT AVAILA8ILITY FACTOR:

91.3%

81.5%

75.9%

23; UNIT CAPACITY FACTOR USING MDC NET):

82.5%

75.2%

71.7%

24. UNIT CAPACITY FACTOR USING DER NET):

81.2%

-73.9%

70.3%

25. UNIT FORCED OUTAGE RA E:

8.7%

17.5%.

15.2%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

28. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION):

N/A i

t E2-2

_.5_

- L .'

=

1 i

UNIT 1 AVERAGE DAILY DOCKET NO.

50-424 1989 MAR 5,M0YE POWER LEVEL DATE:

COMPLETED BY: R. A.

TELEPHONE:

(404) 724-8114 x3870 DAY Net MW j

1.........

1097

  • 2.........

1094

  • 3.........

1089 *

'4.........

1098

  • 5.........

1102

  • 6.........

1096

  • 7.........

1099

  • i 8.........

1107

  • 9:.........

1110

  • 10.........

O 11.........

0 1

i I

12.........

189 13.........

680 i

14.........

684 15.........

796 16.........

765 17.........

786 18.........

785 19.........

759 l

20.........

948 21.........

1090

  • 22.........

1101

  • 23.........

1105

  • 24.........

1082

  • 25.........

1125

  • 26.........

1098

  • 27.........

1093

  • 28.........

1098

  • i MDC CAN BE EXCEEDED VNDER OPTIMAL CONDITIONS l

l l

i l

l E2-3 l

L

..., 2 ~

n. f -,

i 2.

ff ni

, s

UNIT. SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-424 DATE:

MAR 5, 1989 i

UNIT NAME:

V0GTLE UNIT 1 COMPLETED BY: R. A. M0YE TELEPHONE:

(404) 724-8114 x3212 REPORT MONTH MAR 89' R

M 5

E E

Y T

A T

LICENSEE SC Y

S H

EVENT T0 COMPONENT CAUSE & CORRECTIVE P

DURATION 0

0 REPORT ED CODE ACTION TO NO.

DATE.

E (HOURS)

N D

NUMBER HE (SUBCODE)

PREVENT RECURRENCE j

89-z U2 TU-F 58.72 A

~7-89-005 P stt Bttow 89-3 02-12 P

198.4 A

5 89-006 SJ P

SEE BELOW F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE-S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FCR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.

E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION I

F-ADMINISTRATIVE 9 - OTHER (EXPLAIN) 4 G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN) 89-2 CAUSE: HIGH VIBRATION TRIP OF MAIN FEEDWATER PUMP,"A", CAUSED A LOW LEVEL CONDITION IN STEAM GENERATOR #4.

CORRECTIVE ACTION: MAIN FEEDWATER PUMP HAS BEEN DISASSEMBLED AND INSPECTED TO DETERMINE CAUSE OF HIGH VIBRATION. PUMP HAS BEEN REASSEMBLED AND TESTING HAS BEEN COMPLETED.

4 89-3 CAUSE: POWER REDUCTION DUE TO MAIN FEEDWATER PUMP "A" TAKEN OUT OF SERVICE FOR INSPECTION AND TESTING.

CORRECTIVE ACTION:

POWER INCREASE AFTER MAIN FEEDWATER PUMP "A" INSPECTED AND TESTED.

E2-4

i r

ENCLOSURE 3 PLANT V0GTLE - UNIT 2 NRC DOCKET 50-425 OPERATING LICENSE NPF-79 MONTHLY OPERATING REPORT FOR FEBRUARY, 1989

' TABLE OF CONTENTS 1

i l

NARRATIVE. REPORT Page E3-1 OPERATING DATA REPORT' Page E3-2 AVERAGE DAILY POWER LEVEL Page E3-3 l

- UNIT SHUTDOWNS AND POWER REDUCTIONS Page E3-4 1

i l

l

NARRATIVE REPORT DOCKET N0.

50-425 UNIT 2 DATE:

MAR 5, 1989 COMPLETED BY: R.A. M0YE TELEPHONE:

(404) 724-8114 x3212 FEBRUARY 1 00:00 UNIT 2 PREPARING TO RECEIVE LOW POWER LICENSE.

FEBRUARY 9 UNIT 2 RECEIVED LOW POWER TESTING LICENSE NRC DOCKET # 50-425.

FEBRUARY 10 19:45 UNIT 2 COMMENCED FUEL LOAD.

FEBRUARY 10 20:13 UNIT 2 ENTERED MODE 6.

FEBRUARY 16 03:47 UNIT 2 COMPLETED FUEL LOAD.

FEBRUARY 19 10:00 UNIT 2 ENTERED MODE 5.

FEBRUARY 28 23:59 UNIT 2 AT MODE 5 PREPARING FOR LOW POWER TESTING.

k E3-1

l l

OPERATING DATA REPORT DOCKET N0. 50-425 DATE: MAR 5, 1989 COMPLETED BY: R.A. M0YE TELEPHONE: (404) 724-8114 x3212 OPERATING STATUS

1. UNIT NAME:

A. W. V0GTLE UNIT 2

2. REPORT PERIOD:

FEB 89

3. LICENSED THERMAL POWER (MWt):

3411

4. NAMEPLATE RATING (GROSS MWe):

1148

5. DESIGN ELECTRICAL RATING (NET MWe):

1101

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1137

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1083

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

5%

10. REASONS FOR RESTRICTION, IF ANY:

LOW POWER TESTING THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

672 672 672

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

0.0

0. 0 0.0
13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

0.0 0.0 0.0

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

0 0

0

17. GROSS ELEC. ENERGY GENERATED (MWH):

0 0

0

18. NET ELEC. ENERGY GENERATED (MWH):

0 0

0

19. REACTOR SERVICE FACTOR 0

0 0

20. REACTOR AVAILABILITY FACTOR 0

0 0

21. UNIT SERVICE FACTOR:

0.0%

0.0%

0.0%

22. UNIT AVAILABILITY FACTOR:

0.0%

0.0%

0.0%

23. UNIT CAPACITY FACTOR (USING MDC NET):

0.0%

0.0%

0.0%

24. UNIT CAPACITY FACTOR (USING DER NET):

0.0%

0.0%

0.0%

25. UNIT FORCED OUTAGE RATE:

0.0%

0.0%

0.0%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

JUNE 1989

28. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION):

1 E3-2

w

.. UNIT 2 AVERAGE' DAILY.

DOCKET-NO.

50-425

' POWER LEVEL DATE:

MAR 5, 1989 COMPLETED BY:;R. A. Moye TELEPHONE:

(404)'724-8114 x3212 DAY.

Net MW 1.........

0-1 2.........

'O i

'3.........

0 4.........

.0 5.........

0 6.........

O 7.........

0 t

8.........

0 9.........

0 10.........

0-11.........

0 12..........

0 13.........

0 14.........

O.

15.........

0 l

16.........

O.

17.........

0 18.........

0 19.........

0 20.........

0 21.........

0 22.........

0 23.........

0-j 24.........

0 25.........

0 26.........

0 2

27.........

O' 28.........

0 E3-3 t

w

~

.e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-425 DATE:

MAR 5, 1989 UNIT NAME:

V0GTLE' UNIT 2 COMPLETED BY: R. A. M0YE

. TELEPHONE:

(404) 724-8114 x3212 REPORT MONTH MAR 89 l

R M

S E

E Y

l T-A T

LICENSEE SC Y

S H

EVENT T0 COMPONENT CAUSE &' CORRECTIVE P

DURATION 0

0 REPORT ED CODE

-ACTION TO I

i I

N0.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE j

NONE j

F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%-

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS-THE PRECEEDING-24 HOURS.

1 E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION l

F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)-

G-OPERATIONAL ERROR (EXPLAIN)

H-CTHER (EXPLAIN) l c

l i

+

l E3-4 I'

_l.

,a____-_.

mm ELV-00340 i

March 15, 1989 Ol99e I

1 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.

20555 PLANT V0GTLE - UNITS 1, 2 l

NRC DOCKETS 50-424, 50-425 l

OPERATING LICENSES NPF-68, NPF-79 4

MONTHLY OPERATING REPORTS l

Gentlemen:

Enclosed is a copy of the January, 1989 monthly operating report for Vogtle I

Unit 1 which has been updated to reflect revised plant operating information, i

Also enclosed are the February, 1989 monthly operating reports for Vogtle Units 1 and 2.

These reports are., submitted in accordance with Technical

{

Specification 6.8.1.5.

Sincerely, (A)... hs+~l-- ^w-W. G. Hairston, III JH/gm

Enclosures:

1.

Revised Unit 1 Monthly Operating Report for January, 1989 2.

Unit 1 Monthly Operating Report for February,1589 3.

Unit 2 Monthly Operating Report for February, 1989 c(w): Georgia Power Company Mr. P. D. Ri.e Mr. C. K. McCoy Mr. J. P. Kane Mr. G. Bockhold, Jr.

NORMS U. S. Nuclear Regulatory Commission Mr. S. Epneter, Regional Administrator Mr.J.F(.Rogge,SeniorResidentInspector,VogtleHopkins, Licensing Projec Mr. J.