ML20246J492
| ML20246J492 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 08/24/1989 |
| From: | Leitch G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-89-12, NUDOCS 8909050168 | |
| Download: ML20246J492 (3) | |
Text
,_
r ll h
PHILADELPHIA ELECTRIC' COMPANY w
I,lMERICK GENER ATING STATION
-(.
P. O. BOX A SAN ATOGA, PENNSYLV ANI A 19464 (215) 027-1200.' EXT 3000 "0".U.7.$.",*"
u................."
August 24,.1989 i
Docket Nos. 50-352 50-353-U,%. Nuclear Regulatory Commission
-Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Response to Generic Letter 89-12, " Operator Licensing Examinations," for Limerick Generating Sta'; ion
~ Units 1 and 2 f
Dear Sir:
This letter is in response to Generic Letter 89-12, which requested operator.' licensing examination information'.
For Limerick Generating-Station Unit 1 & 2, the enclosed forms provide our best-estimate of'l) the anticipated number of candidates to be examined during upcoming NRC site visits, 2) scheduled dates for requalification examinations,'and 3) the anticipated date on-which we plan to certify our simulation facility.
If you have any questions or require additional information, please-do not hesitate to contact us.
Very ruly)yours, i nr FDL:lc Enclosures cc W. T. Russell, Administrator, Region I, USNRC T. J. Kenny, USNRC Senior Resident Inspector, LGS K. E. Perkins, Jr., USNRC Operator Licensing Branch Chief poo3 I
8909050168 890824 R
ADOCK 05000352 1 i PDC I
_--_._n.--
I i
PROPOSEDOPERATORLICENSIN5EXAMIthATI0fiSCHEDULEFORitAT Facility Limerick Generating station NRC Region _
1 FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90) (10/1/90-9/30/91) (10/1/91-9/30/92) (10/1/92-9 1.
Assigned i
Date
[
(GL89-03) 7/16 /90 7/15/91 7/20/92 7/19/93
- R0 11 4
4 4
- SR0 Instant 1
2 2
2
- SRU Upgrade 3
2 2
2
- SRO Limited o
0 0
0 2.
Assigned Date (GL 89-03)
- RO iSRO Instant
- SR0 Upgrade SSR0 Limited Please indicate initial cold license examinations by placing an asterisk (*) by the date.
Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**).
(For example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units I and 2, and five R0 candidates licensed on Unit I are to be examined to extena their licenses to Unit 2, then indicate "R0 3,5**.")
- ~
i PROPOSED R. QUALIFICATION EXAMINATION SCHEDULE FOPJ1AT l.
Facility Limerick Generating station NRC Region 1
Planned Simulation Facility Certification / Approval Date March 26, 1991-('.
FY 1990 FY 1991 FY.1992 FY 1993 l
(10/1/89-9/30/90)
(10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/92-9/30/93) ii i
1.
Date 1/s/90 Date_1/21/91 Date 1/6/92 Date 1/25/93
. t :.
- 2.
Date 1/15/90 Date 1/28/91 Date 1/13/92 Date 1/18/93 3.
Date 1/22/90 Date 1/7/91 Date 1/20/92 Date 1/11/93 4
.Date 1/29/90-DSte 1/14/91 Date 1/27/92 Date 1/4/93 5.
Date 2/5/90 Date 2/4/91 Date 2/3/92 Date 2/2/93 6.
Date 2/12/90 Date 2/11/91 Date 2/10/92 Date 2/9/93 r
f f
t-t 6
.