v
~
h3(
3890028780 T.S.6 9.1.6-4 PHILADELPHIA ELECTRIC COMPANY 1,lMERICK GENER ATING STATION P. O. BOX A SAN ATOG A, PENNSYLVANIA A 19464 (215).3271200, EXT. 3000 GRAH AM M LEITCH vees PRasspamv bleeB ABCM RENER ATING ST ATION July 11, 1989 Docket No. 50-352 License No. NPF-39 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station Monthly Operating Report l
l l'
Gentlemen:
Enclosed is the monthly operating report for Limerick Unit l' for the month of June 1989 forwarded pursuant to Technical Specification 6.9.1.6.
Please note this is the first submittal of a report for Limerick Unit 2.
A Fuel Load License for Unit 2 was received from the NRC on June 22, 1989.
Very truly yours, Y
///
'c 1
JJM/kk l,
Enclosure cc:
William T. Russell, Administrator, Region I, USNRC T. J. Kenney, USNRC Senior Resident Inspector David E. Ney, PA Dept. of Environmental Resources INPO Records Center
$[WC ih2
- rfa, a-_
nn
i i
i:
3890028780
=-
L AVERAGE OAILY UNIT POWER LEVEL l
00CKET NO, 50 - 352 UNIT LIMERICK UNIT 1 DATE JULY 10 1989 COMPANY PHILADELPHIA ELECTRIC COMPANY l
J.
J. MURPHY REPORTS SUPERVISOR i
PROJECTS DIVISION LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3752 3,...__.
MONTH JUNE 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE OAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 787 17 813 2
744 18 818 3
743 19 810 4
805 20 810 5
822 21 805 6
790 22 808 7
811 23 809 8
810 24 808 9
805 25 808 10 808 26 808 11 817 27 853 12 815 28 861 l'
13 856 29 952 14 775 30 921 t
i 15 815 16 807 I
i
_______m____..a-___
m
3890028780 u
4 OPERATING DATA REPORT DOCKET NO. 50 - 352
............a.........
DATE JULY 10, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY J. J. MURPHY REPORTS SUPERVISOR PROJECTS DIVISION LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3752 OPERATING STATUS 1 UNIT NAME: LIMERICK UNIT 1 NOTES: ON JUNE 3, 1989 THERE
- 3. REPORTING PERIOD:
JUNE, 1989 WAS A 27% SPIKE POWER
- 3. LICENSED THERMAL POWER (MWT):
3293 REDUCTION TO SUPPORT 4 NAMEPLATE RATING (GROSS MWE):
1138 A ROD PATTERN ADJUSTbENT
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1055
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1092 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
5055 8.
IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
952
- 10. REASONS FOR RESTRICTIONS. IF ANY: POWER LIMITED WITHIN REACTIVITV LEVELS THIS MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 4.343 29.903
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 1.307.5 22.711.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
't.
HOURS GENERATOR ON-LINE 720.0 1.221.9 22,254.6
- 15. UNIT RESERVE SHUTDOWN HOURS lib b$b bib
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,914.590 2.842,790 63.640,547
- 17. GROSS ELECTRICAL ENERGV GENERATED (MWH) 616,310 889,940 20.57),610
- 18. NET ELECTRICAL ENERGV GENERATED (MWH) 587,806 793.724 19.636,212 PAGE 1 0F 2
3890028780 L
OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 352 DATE JULY 10. 1989 Th!S MONTH VR-TO-DATE CUMULATIVE
-19. UNIT SERVICE FACTOR 100.0 28.1 74.4 1
- 20. UNIT AVAILABILITY FACTOR 100.0
.28.1 74.4 21 UNIT CAPACITY FACTOR (USING MDC NET) 77.4 17.3 62.2 j_
[
- 22. UNIT CAPACITY FACTOR (USING DER NET) 77.4 17.3 62.2
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 3.5
.24 SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE. DATE, AND DURATION OF EACM):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST S1ATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84
.4..........
INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL OPERATION
'1ST OTR 86 2/01/86 l
1 l
l 1
l l
l' l
PAGE 2 0F 2 i
4 l
l l
l i
C_______
l s
I e
3890028780 e.
1 i
l i
4 8
i i
i 1
4 I
i 1
4 I
t 8
I 1
6 > a f4 1 1 4
i.
I i 7 6 on 4 5 I
r i-t 4
8 4 1 2b t i i
5 a
e ti 4 O t') I i I
i 4
6 1 1 W
e 1 4
1-t i Gl F2 1 6 4
84 1 6
4U 1 4Oa i I
d8 las 1
4 I
I 9-e**
I 0 4
7 as 44 ha i
e iU i th M i 4 1
'O F 7 0
4 4
i e4 t Z l e i
M 48 tal er t *" l
. I a4 d tal 6 I e
FQU
'2 7
I e i
U M
r*
i 6
i t-1 x s e i
DuAe -
O O I e-t-I ta 1 l U l-m i e.e $
1 B&J B th O t-ud a e t
&O aw i 7 a I
.J B mHq t
- 8 F
n us.-
ei, 4 D$
L ui 1
>MO 6.J 4 1 I
M7OJO Si I
i (L i 4
& H h3 O 4 i I
ZOuw I e
i ED 6 4 4 > uJ > Z f4 4 I I
MM d
m a'
1 02 1 o* I 7u ul e a a t
6 M 6-ha 4
6 e-1I $n3"O6 O
e e us 1
4 a l-ta a e
i I ' 4h 6 &M 8% l 4 >
a e
& let O D -
e 1 J B 3 to a f4 4 teo hf 6 4
0 4 ul G 2 d's 8 g j in es
.th 6 U iO4 ul 8 & to F U t') 4 6 t-4.1 I w
F ha IA E F
h 3 ul w w
49 4 ** a e toe FUM 4 4 U Zt 9 (a t i et 6 n tu a ^ l 4 tak 463 3 HE ha
,e I i 44 3 4 > l
.J 4
") O 7 t d in 4 4 (r tr i E) h & F.J In 63t J l H 4 hO&*6 4 E E I H
fr Z en u
C) iH t D1 Tt e ul O' e4 tN i I C. Li D I T & t* til to
- j if) ( J l 7 I h 6 '*3 EJ fa Jw l i UFUt xOZ>
X e
ua I ut h us us ni A41 tal un 4 O 2 Ar i O
k t-a) 2.
arO t
3 4
4 O
I 4HF 4 3
O O I
e FYt 8-ui h
I ul U uJ B
- uJ
>+
>=
464 8 M4> I K
H DJ
.a tD un 5
- sn La Z
J W'
I d E 1 eZ
]
O 3 h
6-tU Q. 4
- EM 2
0 5
e i
NUd Q
t..
~~ t a LA.J U
B >-
t W
h i Z t
UUK i u) ha e I e
M ce kJ I Z O in a t')
Fw t OOw I w
J84 i OU S
4 el 3 8 i Si 6
33Out iO I
Z Zt-2 I U i
O as 4 D F l.---.
t-------
O 2 2 at O 4 2 8
1 e uJ ut *s 6
p-1 4 8 i 4FO4i h3 M
4 e4 O v 4 he E4 M 4 7
1>U t
C, i.40 - -.
t oi 3 I.
1-.
F ED 4 0
1 7
s U
Di 4 a
t O
- J e-4 s las sa i m
O 1
i up i
F-i i to 6 I-I d
ut e
E tha l I / 2 11 I Z
F 1 i un ul O A M
M Di i U>b 4 h
6sl
") t i e e tal ul i et I
e
.J tr i X
O 4
e a
es) h a
4 t
1 5
....3---
a ga e
Q R
I E
4 Z
m 2
7 0
31; a I w
7 m
4 I
I la O t') e e
us 4
F 1 O t.6 - 1 J
U J
44 Z
l i
1 7*1 h
7 O
1 Oda 4 X
Q.J X
W h
I O7OI RAA
- =e ut O
4 1 o-e F i we 6-4 C
F 1 F F L) I th U
F E
I hl F el e ul ul Md as D
C 6 3 3 iu a e-az O
T.
n i
IR I D
6-H to isl 1
M 4
g 3----
I~
~~
J. IX M.Z.. ud ta
- e. O la
> us y P-I Z
l 4
K4**
e i
it F..i d
)
H I
O ** t u uJ z
i M cJ B U
>0
.i
~)
I 45 m i F-2 (*) D D / Le a
us i
N Z 4 Z O it 9-O A I
w lat Z M p-Ch m a e ut a.---B----.
3 u) 3 og F a 6 -
t 2a 6 (4 l-411.4 et 7 el a i
OM i H Z D D it' H 18 IB8 i ** Er t i
~) H &a d 841 > tal 3 j
i F-D 8 9
Z O 4 ul 4sf (4 O Lt F i
e 4OI I
O us 2 su tr O at O O t
Er 1 4 i e M
1 Dw I a
e i i 1 e i e i e t
O I
ul 6 ---.I
~~
11 410 V O isl u. d 1 8
uJ e 0 la e a
B
>w I
I b-1 4
l t-.~
l O
1 4
kl i
e i
a 9
ha i OD i
e-i un O i
1 ei e
u us
&1 i
t 0$
e OU i
i w
I i
uM l-__
l____..--_
I e 1 i i 1
e O4
__ _ _ ___i
- i um
.l.
Dockat No.L50-352 3890028780 ateochm2nt to nonthly.
Op2 rating Report for June 1989 Limerick Generating Station Unit 1 June 1 through June 30, 1989 I.
Narrative Summary of Operating Experiences Limerick Unit I began the month of June in operational condition 1 at a nominal 80.0% of rated thermal power.
On June 3, power was reduced using recirculating pump flow to-53.0% forra' rod pattern adjustment.
Power was then restored to 80.0%.
On June 27, power was increased to 90%.
The unit remained at 90% through the remainder of the month.
Reactor power continues to be limited due to feedwater copper concentrations remaining above the administrative limit of~
0.2 ppb for fuel cladding integrity.
There were no operational events of significance that occurred during the month of June.
II. Challenges to Main Steam Safety Relief Valves
-There were no challenges to the Main Steam Relief Valves during the month of June.
l l
l' i
w? 3
=
3890028780>.
e
,I
. AVERAGE-DAILY UNIT POWER LEVEL 3 ?.
DOCKET.NO. 50 - 353 t
j UNIT LIMERICK' UNIT 2 g
DATE JULY 10 1989
'OMPANY PHILADELPHIA ELECTRIC-COMPANY C
- t.,
r J.
J.
MURPHY-REPORTS SUPERVISOR PROJECTS DIVISION LIMERICK GENERATING STATION-
- TELEPHONE-(215) 327-1200 EXTENSION 3752-
_.;b MONTH:
JUNE-1989 -
DAY AVERAGE DAILY-POWER LEVEL-DAY.
AVERAGE DAILY. POWER LEVEL (MWE-NET)
(MWE-NET) 1 0
17-0 2
0 18 0
'3 0
19 0
f' 4
0 20 0
5 0
21 C
.6 0.-
'22 O
'7 0
23 0
8 0
24 0
9 0-25 0
10 0
26 '
O 11 0
27 0
12 0
26 0
13 0
29 0
14 0
30 0 0 16' O
l'1 s
L__-__
4!
1 3890028780 OPERATING DATA REPORT DOCKET NO. 50 - 353 DATE JULY 10 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY J. J.
MURPHY l
REPORTS SUPERVISOR PROJECTS DIVISION LIMERICN GENERATING STATION TELEPHONE (215) 327 1200 EXTENSION 3752 j.
OPERATING STATUS 1 UNIT NAME: LIMERICK UNIT 2 l NOTES:
- ITIAL FUEL LOAD
- 2. REPORTING PERIOD:
JUNE. 1989 BEGAN ON J ';* 2 3 1989 3.
LICENSED THERMAL POWER (MWT):
0 AND WILL COMPLETE ON 4 NAMEPLATE RATING (GROSS MwE):
1138 JULY 4 1989.
5.
DESIGN ELECTRICAL RATING (NET MWE):
1055
- 6. MAXIMUM DEPENDABLJ CAPACITY (GROSS MwE):
7 MAXIMUM DEPENDABLE CAPACITY (NET MWE):
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MwE):
0
- 10. REASONS FOR RESTRICTIONS.
I* At i INITIAL CORE LOAD INCOMPLETE THIS MONTH VR.TO.DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 0
0 0
12, NUMEER 0* HOURS REACTOR WAS CRITICAL 0
0
.0
'13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 j
1 A.. HOURS GENERATOP ON-LINE 0.0 C.0 0.0
- 15. UN]* RESERVE SHUTDOWN HOUR; C.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0
0
)
- 17. GROSS ELECTRICAL ENEROV GENERATED (MWH) 0 0
0 l
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
O C
0 1
I PAGE 1 0F 2
+ _ _ _ _. - _ _ _ _. _ _ _ _ _
3890028780 OPERATING DATA REPORT (CONTINUED)
DUCKET NO. 50 - 353 DATE JULY 10. 1989 THIS MONTH VR-TO.0 ATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 0.0 0.0 0.0
- 30. UNIT AVAILABIL'ITY FACTOR 0.0 0.0 0.0
- 31. UNI' CAPACITY FACTOR (USING MDC NET) 0.0 0.0 0.0
- 32. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 0.0
- 33. UNIT #0RCEO OUTAGE RATE 0.0 0.0 0.0 34 SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
LIMERICK UNIT a2 IS ENTERING TEST STATUS
- 35. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: 080f89
- 36. UNITS IN TSST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION NOT APDLICABLE PRIOR TO COMMERCIAL OPERATION 1
PAGE 2 0F 2 i
4 l
l
l i
il I
iI 1I b
4 -
5 0-8-
7 8
2 0
0 9
8-3
_ V -
2. _
_ N -
5 _ _
N7 _ _
A _
P O3. _
~'
_ M I
~
_ O TN _ _
E
_ ~ _ C AO_ _
S E
TI -.
NAS E
_ C SS _ _
OTN C
_ I GE_
N__ _
I AE R
_ R _
2 __
TDC U
_ T _
R NT C
I
)
O
_ T _
. C_
ONIv _.
UF L)T S
_ I _
. E SOTE..
RO RS N_~
L_
IIA T
ret E
. U_9
_ E VSR0 SNOLO Y
DI E 0._
NOF( -
A
_ 8 _ A. V EVN2 II G
S
_ 9.I
_ HDIE1 _ _
TSTE H _PUDG-.. E ATRR 1
_ P _ RS 7 _ _ V
)
REOU
)
3 _ K _,_
L__ U SK2 _. I E -
4 GAEPN 5
I 5 _ C _ 0
_E MSTC3 _. T C _
(
PwE(
(
3 _ I
.D _
TCI
_ _ C N.
TESR
_1 T
_ R
_ A _. DER) _ _ E E.
IR E
I
_Y L_ J O J E 5 __
- _ E
_ R R _
BPYTL B
M_U.I L _
DOY1
_ R R _
I RNI 0 _
I H _
OOU.
.ER!2 _.
HRTEF u
5 _ L _J.D
_J#D w( _.
CTC_
XONV x
E E
Y E
_ 'D N RE.
EFEE E
O U
T B
N
_ NO N
R A
O
_ AIT T
- D D M
TN _
N E
D
_ ECE _
E T
T E
_ SAV_
K I
E L
_ U E
M)
C N
L E
_ A R _
AN O
U D
D T
_ C P _
.RI M
O ll1 lI MCA ASL C
_ T R
P
_ N CCX
_ EE) _
)
SIE ND5_
3 T(
OO(
(
LLA
_ PC AAMR
. M UUOE
. O NNTH
_ C DAAUT
_ }i OMMAO
_ M H
_ EE) _
T - - - -
_ TD4 _
E S
_ SO( _
M1 234 N
_ YC O
_ S 9_
IIl
_ }I I
T 9
N C
9 _
O U
1 _
_ E I
D
_ E T
E
_ 5TT _
A R
E
_ NNR _
N N _
_ EEO _
I D
U_
_ CVP _
M E
J
_ I EE _
A w
_ L R _
X C
E D
1N' l
lI
)
E
)
D N
S N
N W'
I N
I A
H
_ r O3 _
A E
A T
_ ODf _
L C
L 5
N D
NI P
N
~
_ DGR _
x OL X
W R
. ONO _
E I
E O
. HIT _
D T
_ TTC -
( T T+
(
S C
T R
_ ETA _
EE IG D
U O
_ MUE _
MT RN O
H D
HR _
U TI R
S E
S LC S N E R
).
R l!i II IO EI VEN T
N A
RAI I
I O) _
C E RTLA N
S2 _
C Y TA AL U
A( _
)
TNGR RNP E
2 NANOLTOX R._
(
N)
_11 ENITOSIE
!\\!
MELATIT(
DTELANAR O5 _
INUURIRE IR _ -
UI* GEMEH TJ _ -
NQAEEDDDT 4
AO.
OEMRROACO RN S
U(. -
A - - - - - - - -
O
_ i i: _.
lt RA9CDEFGH E
E) _
D*
V ' _
T i(
il D
E L
E.
DU T.
ED A
CE C
)
DH 1
(
OC FS
_ fIi.il
- if!
l, 1.l'
.f O.
~
- 3
~
Docket No. 50-353 L -*'.w.
3890028780 attachm2ne to Monthly-L Operating Report for
' June'1989-Limerick Generating Station Unit 2 i
June 1 through June 30, 1989 I.
Narrative Summary of Operating Experiences Limerick Unit 2 began the month'of June in no operational condition awaiting for issuance of its fuel load license.
The fuel. load license was received on June 22.
Unit 2 ent'ered-operational condition 5 and'* on June 23 as' fuel load commenced.' As of June 30, the.2 were 383 of 764 bundles loaded into.the core.
Unit 2 ended the month with fuel load continuing.
There were no operational items of significance during the month of June.
r II. Challenges to Main Steam Safety Relief-Valves There were no. challenges to the Main Steam Relief Valves during the. month of June.