ML20246H073

From kanterella
Jump to navigation Jump to search
Requests Expedited Review & Issuance of 890310 Tech Spec Change Request 89-02 Re Rev to Calibr Frequencies for Source Range Monitor & Detector Not in Startup Position Instrument Channels for Control Rod Block Actuation
ML20246H073
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/10/1989
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8903200009
Download: ML20246H073 (2)


Text

V

"~

10 CFR 50.90

~

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 121518414000 March 10, 1989 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission AfTH: Document Control Desk Washington, D. C. 20555

SUBJECT:

Peach Bottom Atomic Power Station Request for Expedited Review and Issuance cf Technical Specification Change Request dated March 10, 1989

REFERENCE:

1)

Letter from G. A. Hunger, Jr. (PECo) to USNRC dated March 10, 1989 2)

Licensee Event Report No. 2-89-01 dated February 22, 1989 for Peach Bottom Atomic Power Station Units 2 and 3

Dear Sir:

This letter is to request that the NRC expeditiously review and issue Technical Specification Change Request 89-02, "SRM/IRM Calibration-Detector Not in Startup Position," for Peach Bottom Units 2 and 3.

The purpose of the change request is to revise the calibration frequencies for the SRM and IRM Detector Not in Startup Position instrument channels for control rod block actuation.

The existing surveillance requirements in Section 4.2.C of the Technical Specifications require calibration of these instrument channels prior to Startup or Control Shutdown.

Calibration of the subject instrumentation channels requires personnel entry into the drywell. This action is prohibited by the environment inside containment during operation: high temperature, inerted atmosphere, and high radiation levels.

The proposed technical specification change request is to remove the requirement for calibration of those instrument channels.

This request is consistent with the Standard Technical Specifications for General Electric Boiling Water Reactors NUREG-0123, vendor recommendations, past surveillance history and preventive maintenance.

The technical specification change request has evolved from a condition of non-compliance discovered on January 20, 1989 for the IRM channels, January 23, 1989 for the SRM channels and reported in Licensee Event Report No. 2-89-01, dated February 22, 1989.

Prior to the discovery, functional tests of the subject I

instrument channels were performed in place of the required calibration.

The LER indicated that we would pursue the option of seeking a revision to the technical specifications. We contacted a number of other nuclear utilities to determine if they had a similar provision in their technical specifications, and, if so, how they provided the calibration prior to controlled shutdown.

Based on these contacts, we p00}

8903200009 890310 I

1 PDR ADOCK 05000277

(

P PNV

Document Control Desk March 10, 1989 Page 2

.have concluded a change to our technical specifications is necessary.

Except for the time taken to arrive at this con sion, the proposed technical specification change has been prepared in an expediti manner and thoroughly reviewed by the Plant Operations Review Committee and h_.. lear Review Board prior to submittal on March 10, 1989.

An expedited review and issuance of the technical specification change by the NRC is required to support the Peach Bottom Unit 2 power ascension activities, tentatively scheduled to begin mid April 1989.

The instrument channel calibration i

can be performed prior to the initial startup; however, once in power ascension, operations would be unable to comply with the existing surveillance requirements if plant conditions require a controlled shutdown.

If you have any questions or require additional information, please contact us.

1 Very truly yours, f

.h o

G. A. Hunger, Jr.

Director Licensing Section l

Huclear Support Division l

l ec:

W. T. Russell, Administrator, Region I, USNRC T. P. Johnson, USNRC Senior Resident Inspector R. E. Martin, PBAPS Project Manager T. E. Magette, State of Maryland J. Urban, Delmarva Power i

J. T. Boettger, Public Service Electric & Gas H. C. Schwemm, Atlantic. Electric

- -_-__ -____ ______-_.