Text
R, -
l'.'
gD j
l p
L j
March 17, 1998 1l
. Mr. John F. Franz, Jr.
' Vice President, Nuclear L
lES Utilities, Inc.
l 200 First Street SE ~
,4 l
P. O. Box 351 Cedar Rapids, IA 52406-0351
Dear Mr. Franz:
L in a telephone conversation on March 11,1398, between Mr. Terry Evans, Operations Training i
Supervisor and Mr. Mike Bielby, NRC, arrangements were made for the administration of licensing examinations at the Duane Amoid Energy Center the week of July 6,1998. In
~ addition, the NRC will make an examination validation visit to your facility the week of June 15,.
j 1998.
R l'
As agreed during the telephone conversation, your staff will prepare the examinations based on l
the guidelines in Interim Revision 8, of NUREG-1021, " Operator Licensing Examination
]
Standards for Power Reactors." The NRC regional office will discuss with your staff any j
j-changes that might be necessary before the examinations are administered.
i
' To meet the above schedule, it will be necessary for your staff to fumish the examination outlines by April 29,1998. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by May 29,1998. Any -
delay in receiving the required examination ard reference materials, or the submittal of j
inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
- for your staff to provide adequate space and accommodatbns in accordance with ES-402, and l
to make the simulation facility avaliable on the dates noted above, in accordance with ES-302, L
- your staff should retain the original simulator performance data (e.g., system pressures, j
temperatures, and levels) generated during the dynamic operating tests until the examination L:
results are final,
[?
Appendix E of NUREG.1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your stal[should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first [
examination date, if the applications are not received at least 30 days before the examination b
date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first_ examination date.
[4 L-9803250287 990317 L
gixt AoocnOs00gagt g
j
. J. Franz 2
March 17, 1998 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of.
Management and Budget, approval number 3150-0101, which expires on April 30,2000.
The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response,
- including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSi@NRC. GOV; and to the Desk Officer, Office of information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Evans has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact H. Peterson at 630-829-9707, or me at 630-829-9705.
Sincerely,
. Original Signed by Melvyn Leach Melvyn N. Leach, Chief i
Operator Licensing Branch Docket No. 50-331 cc:
L. Root, President and Chief Operating Officer G. Van Middlesworth, i
Plant Manager K. E. Peveler, Manager, Regulatory Performance Chairperson, Iowa Utilities Board K. D. Young, Training Department DOCUMENT NAME:G:\\DRS\\DUA03118.DRS
- v. e.w..m or w. ooeu,n.nunme= u. wec em e on.m.no r cw en.w.no v % cm OFFICE Rill:DRS lp Rlll:DRS W
NAME MBielby @,d, MLeach @8v4 DATE 03/(7/98 03//7/98 OFFICIAL RECORD COPY
[-
i
?
i i.
. ranz -.
3 March 17, 1998 Distnbidon:
Docket File DRS PUBLIC IE RlllPRR SRI, Duane Amold R. M. Gallo, NRR/HOLB
~ R. D. Lanksbury, DRP.
G. B. Kelly, LPM, NRR M. A. Bies, DRS -
l I