Notice of Denial of Amend to License NPF-12 & Opportunity for Hearing to Modify Tech Spec 4.6.1.6.1.a to Utilize 21 Tendons Rather than 15 Tendons for 10-yr Surveillance & Subsequent 5-yr Intervals
ML20246H054
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/28/1989
From: Hayes J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20246H044 List:
References
NUDOCS 8905150334
Download: ML20246H054 (3)


Text

_

i i

7590-01 i

UNITED STATES NUCLEAR REGULATORY COMISSION 1

SOUTH CAROLINA ELECTRIC & GAS COMPANY S0,U,TH CAROLINA PUBLIC SERVICE AUTHORITY DOCKET NO. 50-395 l

NOTICE OF DENIAL OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR HEARING The United States Nuclear Regulatory Commission (the Commission) has denied a request by the licensee for an amendment to Facility Operating License No. NPF-12 issued to the South Carolina Electric & Gas Company and South Carolina Public Service Authority (the licensee) for operation of the V.C. Summer Nuclear Station, Unit 1 (the facility) located in Fairfield County, South Carolina.

The denied portion of the amendment, as proposed by the licensee, would modify the Technical Specification (TS) 4.6.1.6.1.a to utilize 21 tendons rather than 15 tendons for the 10 year surveillance and subsequent five year intervals. Currently TS 4.6.1.6.1.a contains a requirement to utilize 15 tendons for the 10 surveillance and subsequent five year intervals. The amendment was requested September 16, 1986 and supplemented August 18, 1987 and July 22 and September 29, 1988.

The Notice of Consideration of Amendment to Facility Operating License and Proposed No Significant Hazards Consideration Determination and Opportunity 1

i for Hearing of the licensee's application for the amendments was published in the FEDERAL REGISTER on November 5, 1986 (51 FR 40282).

]

8905150334 890428 PDR ADOCK 05000395 P

PDC

..a

)

TS 4.6.1.6.1.a presently requires that 15 tendons be sampled at the 10 year surveillance intervals and at subsequent five year intervals. The licensee had requested approval to change the requirements to 21 tendons. The staff had denied the request because the proposed change is unnecessary. There is nothing in TS 4.6.1.6.1.a which would prohibit 21 sample tendons. Such a sample size would still be in conformance with the existing TS.

Therefore, the proposed TS change was denied. The licensee was notified of the Commission's denial of this request by letter dated April 28, 1989.

By June 5, 1989, the licensee may demand a hearing with respect to the denial described above and any person whose interest may be affected by the proceeding may file a written petition for leave to intervene.

A request for a hearing or a petition for leave to intervene must by filed with the Secretary of the Commission, United States Nuclear Regulatory Commission, Washington, D.C. 20555, Attention: Docketing and Service Branch, or may be delivered to the Comission's Public Document Room, 2120 L Street, N.W. Washington, D.C.

by the above date.

A copy of any petitions should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Comission, Washington, D.C. 20555, and to J. B. Knotts, Jr., Esquire, Bishop. Cook, Purcell, and Reynolds, 1400 L.

Street, N.W., Washington, D.C. 20005-3502, attorney for the licensee.

For further details with respect to this action, see (1) the application for amendment dated September 16, 1986, as supplemented August 18, 1987 and i

July 22 and September 29,1988, and (2) the Comission's letter to South Carolina Electric & Gas Company, dated April 28, 1989, which are available for public inspection at the Comission's Public Document Room, 2120 L Street, N.W.,

i

. L Washington D.C. 20555, and at the Fairfield County Library, Garden and Washington Streets, Winnsboro S.C.

29180.. A copy of item (2) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555,, Attention: Director,. Division of Reactor Projects I/II.

Dated at Rockville, Maryland, this 28 day of April 1989.

FOR THE NUCLEAR REGULATORY COMMISSION John J. Hayes, Jr., Project Manager Project Directorate 11 1 Division of Peactor Projects I/II Office of Nuclear Reactor Regulation L

l [ ENCLOSURE /SC E&GC/VC SUMMER?

0FC :LA:

^

PR:PM:PD21:DRPR:0GC g g....::D:

RPR :

NAME : pan

.J

.....:.__ d.......:..

....... : d.d.Lt_.PJJ f:.E t

a ti i sam DATE:4/g/89
4/%f89
4/20/89
4//)@89 l

0FFICIAL RECORD COPY

- - _ _ - _ _ _