ML20246G112

From kanterella
Jump to navigation Jump to search
Advises That Regulatory Licensing Responsibility for Facilities Transferred from NRR to Nmss.Plants in Safstor & Decommissioning Plans Approved
ML20246G112
Person / Time
Site: Humboldt Bay, Vallecitos Nuclear Center
Issue date: 05/03/1989
From: Chris Miller
Office of Nuclear Reactor Regulation
To: Bell M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 8905150189
Download: ML20246G112 (3)


Text

_ _ _ _ _ _ - _ _ _ _ _ _ _ _

,L May 3, 1989 Docket No. 50-133 DISTRIBUTION:o GYuhaus Docket No. 50-18 l Docket Filead EJordan

'NRC & Lo'al PDRs ACRS(10) c MEMORANDUM FOR: Michael J. Bell, Chief PDSNP R/F Region V Regulatory Branch Doc. Control Desk TJohnson Division of Low Level Waste PErickson Management and Decommissioning EHylton Office of Nuclear Material DMartin Safety and Safeguards MBell GHolahan FROM:-

Charles L. Miller, Director LRubenstein Standardization and Non-Power JGreeves Reactor Project Directorate OGC Division of Reactor Projects - III, IV, BGrimes V and Special Projects JFouchard, PA Office of Nuclear Reactor Regulation JMartin RScarano l

SUBJECT:

TRANSFER OF HUMBOLDT BAY UNIT 3 AND VALLECITOS B0ILING WATER REACTOR FROM NRR TO NMSS (DOCKET NOS. 50-133 and 50-18)

Effective immediately, the regulatory licensing responsibility for Humboldt Bay Unit 3 and Vallecitos Boiling Water Reactor (VBWR) are transferred from PDSNP of NRR to the Regulatory Branch of the Division of Low Level Waste Management and Decommissioning,(Memorandum, Thomas E. Murley and Hugh L.

NMSS. This transfer is consistent with the agreement between NRR and NMSS Thompson,'Jr. to Victor Stello dated March 21,1988).

Both of these plants as you know are permanently shutdown and in a SAFSTOR statu s.

Decommissioning plans and SAFSTOR Technical Specifications have been approved-for both plants and neither plant has any outstanding licensing actions.

Pete Erickson of my staff will assist in the orderly transfer of project I

manager files to Dan Martin. The licensees will continue to send their correspondence to the NRC Document Control Desk for distribution to HMSS.

By copy of this memo, NMSS, Region V, 0GC, PA, Records and Reports Management Branch and the Document Control Desk are being notified of the following changes for Humboldt Bay Unit 3 and VBWR:

1 Position From NRR To NMSS Project Manager Peter B. Erickson Dan E. Martin Directorate / Branch Chief Charles L. Miller Michael J. Bell Division Assistant Director Lester S. Rubenstein NA Division Director Gary M. Holahan Richard L. Bangart original signed Dino C. Scaletti for Charles L. Miller, Director Standardization and Non-Power M

Reactor Project Directorate 8905150169 890503 PDR ADOCK 0500007g Division of Reactor Projects - III, IV, P

PDC V and Special Projects Office of Nuclear Reactor Regulation

  • See Previous Concurrence NMSS:LLRB* k CMi11e PM:PDSNP*

LA:PDSNP*

NMSS:LLRB*

NMSS:LLRB*

MBell

~

PErickson:cw EHylton DMartin TJohnson 05/02/89 05/02/89 05/02/89 05/02/89 05/02/89 05/ /89

l

'May 3, 1989 Docket No. 50-133 DISTRIBUTION:

GYuhaus Docket No. 50-18 Docket File EJordan NRC & Local PDRs ACRS(10)

MEMORANDUM FOR: Michael J. Bell', Chief.

PDSNP R/F Region V Regulatory Branch Doc. Control Desk TJohnson Division of Low Level Waste PErickson Management and Decommissioning

. EHylton Office of Nuclear Material DMartin Safety and Safeguards MBell GHolahan FROM:

Charles L. Miller, Director LRubenstein Standardization and Non-Power JGreeves Reactor Project Directorate OGC Division of Reactor Projects - III, IV, BGrimes V and Special Projects JFouchard, PA Office of Nuclear Reactor Regulation JMartin RScarano

SUBJECT:

TRANSFER OF HUMBOLDT BAY UNIT 3 AND VALLECITOS BOILING WATER REACTORFROMNRRTONMSS(DOCKETNOS.50-133and50-18)

Effective immediately, the regulatory licensing responsibility for Humboldt Bay Unit 3 and Vallecitos Boiling Water Reactor (VBWR) are transferred from PDSNP of NRR to the Regulatory Branch of the Division of Low Level Waste Management and Decommissioning, NMSS. This transfer is consistent with the agreement between NRR and NMSS (Memorandum, Thomas E. Murley and Hugh L.

Thompson, Jr. to Victor Stello dated March 21,1988).

Both of these plants as you know are permanently shutdown and in a SAFSTOR status.

Decounissioning plans and SAFSTOR Technical Specifications have been approved for both plants and neither plant has any outstanding licensing actions.

Pete Erickson of my staff will assist in the orderly transfer of project manager files'to Dan Martin. The licensees will continue to send their correspondence to the NRC Document Control Desk for distribution to NMSS.

By copy of this memo, NMSS, Region V, OGC, PA, Records and Reports Management Branch and the Document Control Desk are being notified of the following changes

- for Humboldt Bay Unit 3 and VBWR:

Position From NRR To NMSS Project Manager Peter B. Erickson Dan E. Martin Directorate / Branch Chief Charles L. Miller Michael J. Bell l

Division Assistant Director Lester S. Rubenstein NA Division Director Gary M. Holahan JohnT.Greeves(Acting) l Charles L. Miller, Director i

Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation b

LRB NMS :L R D:PDSNP PM:PDSNP h L MP' LLRB PErickson:cw E

n DMartin TJohnson MBell CMiller I

0[/A/89 Oj/fL/89 Og/2,/89 Of/2 /89 05/2/89 Of/ /89

)

1

  • [ paso

^

UNITED STATES NUCLEAR REGULATORY COMMISSION y

g#(/ g s

WASHINGTON, D. C. 20555

(*w+,/

May 3, 1989 Docket No. 50-133 1

Docket No. 50-18 l

1 MEMORANDUM FOR: Michael J. Bell, Chief Pegulatory Branch Divisiori of Low Level Waste Management and Decommissioning Office of Nuclear Material Safety and Safeguards FROM:

Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, V and Speciel Projects Office of Nuclear Reactor Regulation

SUBJECT:

TRANSFER OF HUl/BOLDT BAY UNIT 3 AND VALLECITOS BOILING WATER REACTOR FROM NRR TO NMSS (DOCKET NOS. 50-133 and 50-18)

Effective innediately, the regulatory licensing responsibility for Humboldt Bay Unit 3 and Vallecitos Boiling Water Reactor (VBWR) are transferred from PDSNP of NRR to the Regulatory Branch of the Division of Low Level Waste NMSS. This transfer is consistent with the Management and Decommissioning,(Memorandum, Thomas E. tiurley and Hugh L.

agreement between NRR and NMSS Thompson, Jr. to Victor Stello dated March 21,1988).

Both of these plants as you know are permanently shutdown and in a SAFSTOR status. Decommissioning plans and SAFSTOR Technical Specifications have been approved for both plants and neither plant has any outstanding licensing actions.

Pete Erickson of my staff will assist in the orderly transfer of project manager files to Dan Martin. The licensees will continue to send their correspondence to the NRC Document Control Desk for distribution to NMSS.

4 By copy of this memo, NMSS, Region V, OGC, PA, Records and Reports Management Branch and the Document Control Desk are beino notified of the following changes for Humboldt Bay Unit 3 and VBWR:

Position From NRR To NMSS Project Manager Peter B. Erickson Dan E. Martin Directorate / Branch Chief Charles L. Miller Michael J. Bell Division Assistant Director Lester S. Rubenstein NA Division Director Gary M. Holahan Richard L. Bangart N a)rle N.C. O k

~

M l

Miller, Director Standardization ano Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _