ML20246F884

From kanterella
Jump to navigation Jump to search
Summarizes ACRS 347th Meeting on 890309-11 Re ACRS Repts & Memos & Other Actions,Agreements,Assignments & Requests
ML20246F884
Person / Time
Issue date: 03/28/1989
From: Remick F
Advisory Committee on Reactor Safeguards
To: Zech L
NRC COMMISSION (OCM)
References
REF-GTECI-101, REF-GTECI-103, REF-GTECI-115, REF-GTECI-NI, RTR-NUREG-1150, RTR-NUREG-CR-5320, TASK-101, TASK-103, TASK-115, TASK-OR ACRS-SL-0356, ACRS-SL-356, NUDOCS 8905150129
Download: ML20246F884 (3)


Text

_

64-6856 1

ppg

+

[

UNITED STATES

/

((

o,,

NUCLEAR REGULATORY COMMISSION c.

'[

ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, D. C. 20555 0,

%,*****/a March 28, 1989 1

The Honorable Lando W. Zech, Jr.

Chairman U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Chairman Zech:

SUBJECT:

THREE HUNDRED FORTY-SEVENTH MEETING 0F THE ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, MARCH 9-11, 1989 ACRS REPORTS AND MEMORANDA The Committee prepared its rep (ort on the Review of the Peach Bottom l

Atomic Power Station Restart.

Report to Chairman Zech dated March 14, l

1989)

The Committee prepared its report on Additional Applications of Leak-Before-Break Technology.

(Report to Chairman Zech dated March 14,

{

1989) j The Committee prepared its report on the Proposed Severe Accident Research Program Plan.

(Report to Chairman Zech dated March 15, 1989)

The Committee prepared its report on the Containment Design Criteria.

(Memorandum dated March 15, 1989, to Chairman Zech from F. J. Remick)

The Committee prepared its report on the Appointment of ACRS Members.

(Memorandum dated March 13, 1989 to Chairman Zech from F. J. Remick)

Copies of these reports have been sent to you.

OTHER ACTIONS, AGREEMENTS, ASSIGNMENTS, AND REQUESTS The Committee discussed a draft report proposed by Dr. Lewis on the use of the NRC's Safety Goal Policy as a standard to measure the effective-ness of NRC rules and regulations in protecting the public health and safety. The Committee decided not to send a letter of this type at this time.

Dr. Lewis subsequently transmitted a personal memorandum to the Commission with recommendations on this type of use of the NRC's Safety Goal Policy. A copy of Dr. Lewis's memorandum has been sent to you.

The Comittee met with Mr. Stello and discussed the possible uses of the revised NUREG-1150 report.

The revised report is expected to be avail-able by April 17, 1989.

The Comittee agreed to have subcommittee and i

full Committee discussions after the revised NUREG-1150 report is p oi available, and to issue comments on possible uses of this report, i

MSM M ORM M

{\\

I s905150129 s90328 03 C' " *8 B7 i

.e

.The Honorable Lando W. Zech, Jr. March 28, 1989 The members took note of the Commissioners' interest in a meeting on I

May 3,1989 regarding several topics of interest. Members were urged to attend to the extent practicable.

Since the last. report of ACRS activities, the following subcommittee meetings have been held:

Mechanical Components, February 28, 1989 The Subcommittee continued its discussions on the NRC staff's proposed generic letter on MOVs.

Occupational and Environmental Protection Systems, March 1-2, 1989 The Subcommittee discussed the general status of emergency prepar-edness for nuclear power plants.

Severe Accidents, March 7, 1989 The Subcommittee reviewed the NRC staff's proposed Severe Accident Research Plan.

Themal Hydraulic Phenomena, March 7,1989 The Subcommittee reviewed the NRC staff's proposed final Policy Statement on additional applications of leak-before-break technol-ogy.

General Electric Reactor Plants, March 8, 1989 The Subcommittee reviewed the proposed restart plan for the Peach Bottom Atomic Power Station.

FUTURE AGENDA l

l The Committee agreed to a tentative schedule for the April 6-8, 1989 ACRS meeting:

Maintenance of Nuclear Power Plants - Review and comment on proposed rule and Regulatory Guide regarding maintenance programs at nuclear power plants.

Pressurized Thermal Shock - Review and comment on the proposed amendment to the pressurized thermal shock rule (10 CFR Part 50.61).

4 Generic Issue 101 - Review and comment on proposed resolution of Generic l

Issue 101, "BWR Water Level Redundancy."

Embrittlement of Reactor Pressure Vessel Supports - Review and comment on proposed resolution of problems associated with embrittlement of reactor pressure vessel supports (NUREG/CR-5320).

L___1____.____

l-c The Honorable Lando W. Zech, Jr. March 28, 1989 Meeting with Director, NRR - Discuss items of mutual interest, including NRR activities regarding containment performance requirements.

Future ACRS Activities - Discuss anticipated subcommittee and full Committee activities as well as the division of work responsibility between the ACNW and ACRS.

Ap3 ointment of ACRS Members - Discuss the status of the appointment of AC15 members and the qualifications of nominees proposed as candidates for appointment to the Committee.

Generic Issue 115 - Review and comment on the proposed resolution of Generic Issue 115, " Enhancement of the Reliability of the W Solid State Protection System."

Generic Issue 103 - Review and comment on the proposed resolution of Generic Issue 103, " Design for Probable Maximum Precipitation."

Sincerely, 7 -_

orrest J. Remick Chairman i

i l