ML20246F645
| ML20246F645 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/03/1989 |
| From: | Yandell L Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20246F650 | List: |
| References | |
| NUDOCS 8907130336 | |
| Download: ML20246F645 (4) | |
Text
_________ - ____
7590-01 Ut'ITED STATES NUCLEAR REGULATORY COMMISSION DETROIT EDISON COMPANY WOLVERINE POWER SUPPLY COOPERATIVE, INCORPORATED DOCKET NO. 50-341 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY-FOR HEARING The United States Nuclear Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License No. NPF-43, issued to the Detroit Edison Company and Wolverine Power Supply Cooperative, Inc. (the licensees), for operation of Fermi-2 located in Monroe County, Michigan.
In accordance with the licensees' application for amendment dated May 31, 1989, the amendment would revise the Technical Specifications to modify the Average Power Range Monitor flow biased rod block and scram limits to allow up to 100%
power operation of Fermi-2 with core flow reduction of rated final feedwater temperature. Appropriate changes to the Bases are also proposed.
Prior to issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations.
ByAugust 10,198pe censees may me a request for a hearing wm respect to issuance of the amendment to the subject facility operating license and any person whose interest may be effected by this proceeding and who wishes to participate'as a party in the proceeding must file a written request for hearing and a petition for leave to intervene.
Requests for a hearing and l
8907130336 890703 DR ADOCK 0500 1g
i I
- \\
petitions for leave to intervene shall be filed in accordance with the i
Commission's " Rules of Practice for Domestic Licensing Proceedings" in 10 CFR i
part 2.
If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or an Atomic Safety and Licensing Board,
~
designated by the Commission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition, and the Secretary or the designated Atomic Safety and Licensing Board will issue a i
notice of hearing or an appropriate order.
As required by 10 ~7R 2.714, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors:
(1) the nature of the petitioner's right.under the Act to be made a party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which may be entered in the proceeding on the petitioner's interet,t. The petition should also identify the specific aspect (s) of the subject matter of the proceeding as to which petitioner wishes to intervene. Any per:on who has filed a petition for leave to intervene or who has been admitted as a party may amend the petition without requesting l
1 eave of the Board up to fifteen (15) days prior to the first pre-hearing conference scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above.
Not later than fifteen (15) days prior to the first prehearing conference scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene, which must include a list of the contentions f. hat are sought to be
litigated in the matter, and the bases for each contention set forth with reason-able specificity.
Contentions shall be limited to matters within the scope of the amendment under consideration. A petitioner who fails to file such a sepple-ment which satisfies these requirements with respect to at least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to present evidence and cross-examine witnesses.
A request for a hearing or a petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Comissior,.
Washington, DC 20555, Attention: Docketing and Service Branch, or may be delivered to the Commission's Public Document Room, 2120 L Street, NW.,
Washington, DC, by the above date. Where petitions are filed during the last ten (10) days of the notice period, it is requested that the petitioner promptly so inform the Commission by a toll-free telephone call to Western Union at 1-800-325-6000 (in Missouri 1-800-342-6700). The Western Union operator should be given Datagram Identification Number 3737 and the following message addressed to Lawrence A. Yandell: petitioner's name and telephone number; date petition was mailed; plant nane; and publication date and page number of this FEDERAL REGISTER notice. A copy of the petition should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and to John Flynn, Esq., Detroit Edison Company, 2000 Second Avenue, Detroit, Michigan 48226, attorney for the licensee.
Nantimely filings of petitions for leave to intervene, amended petitions, supplemenul petitions and/or requests for hearing will not be entertained i
I
..4 I
absent a determination by the Commission, the presiding officer or the l
presiding. Atomic Safety and Licensing Board that the petition and/or request-should be granted based upon a balancing of the factors specified in 10 CFR 2.714(a)(1)(1)-(v) and 2.714(d).
i If a request for hearing is received, the Commission's staff may issue the amendment after it completes its technical review and prior to the completion of any required hearing if it publishes a further notice for public coment of its proposed finding of no significant hazards consideration in accordance with 10 CFR 50.91 and 50.92.
For further details with respect to this action, see the application for amendment dated May 31, 1989, which is available for public inspection at the Commission's Public Document Room, 2120 L Street, NW., Washington, DC 20555, and at the Monroe County Library System, 3700 South Custer Road, Monroe, Michigan 48161.
Dated at Rockville, Maryland, this 3rd day of July.
FOR THE NUCLEAR REGULATORY COMMISSION
$U%4 TEN OAA Lawrence A. Yandell, Acting Director Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation a