May 5, 1989 MEMORANDUM FOR: Those on Attached List FROM:
Dino Scaletti, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects, NRR
SUBJECT:
UPCOMING ACRS MEETING RELATED TO THE ABWR Enclosed is the agenda for the ACRS's ABWR Subcommittee meetings-to be held on May 10 & 11, 1989. Please make sure that appropriate coverage is provided by your staff at the times indicated on the agenda. The only staff presentation is currently scheduleJW:20 AM on May 11 to discuss the overall approach for dealing with the severe accident issues and the design features of the ABWR.
Sincerely,
/s/
Dino Scaletti, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, V and Special Projects, NRR
Enclosure:
As stated CONTACT:
D. Scaletti, NRR/PDSNP 492-1104 l
t DISTRIBUTION:
PDSNP R/F
' Centre L File NRC PDR G. Holahan E. Che111ah L. Shao B. Hardin L. Rubenstein R. Pedersen A. Thadani J. Spraul L
J. Richardson T. Kenyon C. Miller J. Wilson n$
F. Witt R. Serbu 8f G. Thomas B.'Mendelsohn om C. Tinkler J. Martin i
Enz J. Stewart J. Lee J. Tsao J. Lazevnick k
C. Tan H. Branner g
)M om M. Rubin T. Chandrasekaran I
l CJD J. Rajan W. Long hll 0x e
s
!" h i d
, ROOM 016 2M M EMM Mg EU.S
_. _m
,[f 4
UNITED STATES
,j NUCLEAR REGULATORY COMMISSION g
WASHINGTON, D. C. 20555 5
'j
/
May 5, 1989 i
MEMORANDUM FOR:.Those on Attached List FROM:
Dino Scaletti, Project Manager Standardization and Non-Power Reactor Project Directorate i
Division of Reactor Projects - III, IV, Y ano Special Projects, NRR l
SUBJECT:
UPCOMING ACRS MEETING RELATED TO THE ABWR l
Enclosed is the agenda for the ACRS's ABWR Subcommittee meetings to be held on May 10 & 11, 1989.
Please make sure that appropriate coverage is provided by your staff at the times indicated on the agenda. The only staff presentation is currently scheduled 11:20 AM on May 11 to discuss the overall approach for dealing with the severe accident issues and the design features of the ABWR.
Sincerely, l
Dino Scalett, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects, NRR j
Enclosure:
As stated 1
I CONTACT:
D. Scaletti, NRR/PDSNP l
497-1104 I
1
p
' Addresses - Memorandum dated 5/5/89-
'i
[
M. W..Hodges, Chief.
Reactor Systems Branch Division of Engineering and System Technology, NRR j
John W. Craig,. Chief Plant System Branch Division of Engineering and System Technology, NRR 1 Faust Rosa, Chief Electrical Systems Branch -
. Division of Engineering and System Technology, NRR Scott Newberry, Chief '
Instrumentation and Control Systems Branch Division of. Engineering and System Technology, NRR Conrad licCracken, Chief Chemical Engineering Branch Division of Engineering and System Technology, NRR Goutam Bagchi, Chief Structural and Geosciences Branch Division of Engineering and System Techr. ology, NRR Ledyard Marsh, Chief Mechanical Engineering Branch Division of Engineering and. System Technology, NRR Ching-Yao Cheng, Chief Materials Engineering Branch Division of Engineering and System Technology, NRR LeMoine Cunningham, Chief Radiation Protection Branch Division of Radiation Protection and Emergency Preparedness, NRR-Anthony T.- Gody, Chief Performance ana Quality Evalu6 tion Branch
-Division of Licensee Performance and Quality Evaluation, NRR William D. Travers, Chief Emergency Preparedness Branch Division of Radiation Protection and Emergency Preparedness, NRR Mark A. Cunningham, Chief Probabilistic Risk Analysis Branch Division of Systems Research, RES
=
Enclosure TENTATIVE AGENDA GE ABWR SUB00MMI'ITEE MEETING 7420 NORFOLK AVE. BETHESDA, MD.
ROOM P110' MAY 10. 1989 8:30 INTRODUCTORY REMARKS MICHELSON 15 MIN 8:45' CHAPTER 7 INSTRUMENTATION AND CONTROL FENNERN 1 HR (HEAT EFFECI'S ON SOLID STATE ELECTRONICS) 9:45 CHAPI'ER 17 QUALITY ASSURANCE NOVAK 40 MIN 10:25 BREAK 10:40 CHAPTER 9 AUXILIARY SYSTEMS
-MILLER 80 MIN (OPERATION TEMPERATURE OF SRVs) 12 NOON LUNCH 1:00 CHAPI'ER 11 RADIOACTIVE WASTE STICKLER 1 HR (FREQUENCY OF SGTS USE) 2:00 CHAPTER 14 INITIAL TEST OPERATIONS MILLER 40 MIN 2:40 BREAK 2:55 CHAPITR 13 CONDUCT OF OPERATIONS TOWNSEND 40 MIN (EFFECI' OF GROUNDWATER ON SOIL STIFFNESS) 3:35 CHAPTER 12 RADIATION PROTEC1' ION SAWYER 40 MIN 4:15 ADJOURN i
1 1
C___
l 4
TENTATIVE AGENDA
'l GE ABWR SUBCWMITTEE MEETING l
.c 7420 NORFOLK AVE. BETHESDA, MD.
ROOM P110 J
l MAY 11. 1989 i
8:30 INTRODUCTORY REMARKS' MICHELSON 5 MIN 8:35 VARIABLE SPEED REACTOR COOLANT PUMPS FENNERN 1 HR (POWER & CONTROL) 9:35 GE POSITION ON CONTAINMENT PROTECTION SAWYER 30 MIN 10:05 BREAK 10:20 SEVERE ACCIDENT DESIGN FEATURES OF THE SAWYER 1 HR EVOLUTIONARY ADVANCED BOILING WATER RUBENSTEIN 30 MIN REACTOR 11:50 LUNCH 1:00 CARRY OVER QUESTION SAWYER 45 MIN REACTOR VESSEL OVERFILL 1:45 FAILURE MODES OF CRDs OSE 30 MIN
.2:15 SUBCOMMITTEE DISCUSSION 3:00
' ADJOURN POSTPONE DISCUSSIONS ON 1.
WIND AND 'IORtMD0 LOADINGS 2.
MISSILES 3.
CATEGORY I STRUOTURES 4.
SABOTAGE 5.
CHAPTER 8 ELECTRIC POWER 6.
FIRE PROTECTION i
i
. - _ =
'7420 NORFOLK AVE. BETHESDA, MD.
~
ROOM P110-
-TOPIC HIGHLIGHTS MAY 10. 1982 i
8:45 CHAPTER 7 INSTRUMENTATION AND C0tfTROL FENNERN' ADVANCED SAFETY SYSTEM DESIGNS ADVANCED PROCESS CONTROL
-IMPROVED HUMAN FACTORS
-DESIGN VERIFICATION / VALIDATION i
9:45 CHAPTER 17 QUALITY ASSURANCE NOVAK:
DESIGN QUALITY ASSURANCE PROCESS QUALITY ASSURANCE ABWR QUALITY ASSURANCES PROCESS l-10:40 CHAPTER 9 AUXILIARY SYSTEMS MILLER REFUELING -
SERVICE WATER / INTERMEDIATE COOLING SYSTEMS CHILLED WATER SYSTEMS COMPRESSED AIR SYSTEMS POST ACCIDENT SAMPLING STANDBY LIQUID CONTROL SYSTEM
i GE ABWR SUBCOMMITTEE MEETING 7420 NORFOLK AVE. BETHESDA, MD, ROOM P110' TOPIC HIGHLIGHTS (Continued)
MAY 10. 1989 1:00 CHAPTER 11 RADIOACTIVE WASTE STICKLER BWR RADWASTE OVERVIEW TURBINE OFFGAS SYSTEM LIQUID AND SOLID RADWASTE SYSTEM CARRY OVER QUESTION: FREQUENCY OF SGTS USE 2:00 CHAPTER 14 INITIAL TEST OPERATIONS MILLER PHASES OF TEST PROGRAM ORGANIZATION AND STAFFING PRE-OPERATIONAL TEST PHASE STARTUP TEST PHASE CARRY OVER QUESTION: umJrS OF OPERATIONAL TEMPERATURE ON SRVs 2:55 CHAPTER 13 CONDUCT.0F OPERATIONS TOWNSEND ABWR SCOPE PHYSICAL SECURITY INTEPEACES CARRY OVER QUESTION: EFFECT OF GROUNDWATER ON SOIL STIFFNESS 3:35 CHAPTER 12 RADIATION PRCTECTION SAWYER ALARA CONSIDERATIONS DOSE ASSESSMENT
GE AWR SUBCOMMITTEE MEETING 7420 NORFOLK AVE. BETHESDA, MD.
ROOM P110 TOPIC HIGHLIGHTS (Continued)
MAY 11. 1989 8:35 VARIABLE SPEED REACTOR CCOLANT PUMPS FENNERN SYSTEM CONFIGURATION PUMP AND MMOR l
ADJUSTABLE SPEED DRIVES ISOLATION TRANSFORMERS M M OR GENERATOR SETS 9:35 GE' POSITION ON 00NTAINMENT PRCfrECTION SAWYER 10:20 SEVERE ACCIDENT DESIGN FEATURES OF THE EVOLUTIONARY SAWYER ADVANCED BOILING WATER REACTOR NRC GAS. TURBINE CONTAINMENT OVERPRESSURE PRUTECTION SYSTEM AC INDEPENDENT WATER ADDITION LOWER DRYWELL FLOODER 1:00 CARRY OVER QUESTION SAWYER REACTOR VESSEL OVERFILL 1:45 F/dLURE MCOES OF CRDs OSE
{