ML20246E690

From kanterella
Jump to navigation Jump to search
Comments on Project Interface Documents 10-S-03,Rev 3 & 10-S-06,per DOE 890503 Submittal.Doe Should Modify Final RAP to Reflect Changes as Discussed in Document 10-S-06
ML20246E690
Person / Time
Issue date: 06/30/1989
From: Lohaus P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Matthews M
ENERGY, DEPT. OF
References
REF-WM-68 NUDOCS 8907120350
Download: ML20246E690 (2)


Text

,

SW/MR. MARK MATTHEWS/06/28 JUN 3 01993 Mr. Mark Matthews Acting Project Manager Department of Energy Albuquerque Operation Office P. O. Box 5400 Albuquerque, NM 87115

Dear Mr. Matthews:

Documents (PID's) y 3,1989, DOE transmitted a copy of two Project Interface By letter dstad'Ha Nos. 10-S-03, Rev.3, and 10-5 06 for NRC review and concurrence. The NRC staff has subsequently completed its review of PID 10-S-06 which deals with a change in the bedding source for the Green River site. The NRC staff has concluded the proposed change to be acceptable arni the bedding material source adequate. Therefore, DOE should modify the final RAP to reflect the changes as discussed in PID 10-S-06.

In addition, based on the PID and our visual inspection of the bedding material sources during a routine inspection of the Green River site on June 13, 1989, the NRC staff would recommend that DOE give consideration to using the Hastings bedding material on the pile to further reduce the amount of rock to be hauled from Fremont Junction.

If you have any questions concerning the above information please call me or Mr. Fliegel, of my staff at FTS 492-0554.

Sincerely, (SIGNED) PAULH.LOHAUS Paul H. Lohaus, Chief Operations Branch Division of Low-Level Waste Management and Deconsnissioning, NMSS cc:

C. Watson, DOE /Al S. Mann, DOE /HQ L. Anderson, Utah Distribution ECenirdl File ("WM.681 2

a C JGreeves, LLWMFV MBell, LLWM JAustin, LLRB JSurmeier, LLTB j

PLohaus, LLOB MFliegel, LLOB DGillen, LLOB SWastler, LLOB BJagannath, LLTB RHall,-URF0 JJones, LLOB rf HMSS rf PDR YES /T /

1 l

PDR NO O Category: Proprietary / /

or CF Only / /

ACNW YES T7 NO/_/

SUSJECT AB

' CT:

DOERAP-Green River Site, Green River, UT

  • See previous concurrence g

Ji W NM

. I............I

......I

...I.

I.......I

.....I 10 NAME:SWastler/jj

TJohnson :MFliegel :PLohaus bg';{~jhg9 ;~~~~jhg~;~~~j~hg~~;~j"j~hg"

~

~

. fh{;~j~j~g~~~~~;~~j~jhg";~j~

j j

9 8907550350 890630 hi-68 0FFICIAL RECORD COPY Nnldch PDC

/JLik-

.SW/HR+ MARK MATTHEWS/06/28 Mr. Mark Matthews Acting Project Manager Department of Energy Albuquerque Operation Office P. 0. Box 5400 Albuquerque, NM 87115

Dear Mr. Matthews:

By letter dated May 3,1989, DOE transmitted a copy of two Project Interf ace Documentsx(PID's)Nos.10-S-03,Rev.3,and10-S-06forNRCreviewand concurrence. The NRC staff has subsequently completed its review of PID 10-S 06 which deals with a change in the bedding source for the Green River site. The kRC staff has concluded the proposed change to be acceptable and the bedding material source adequate. Therefore, the NRC concurs in PID 10-5-06.

In addition, based on the PID and our visual inspection of the s

bedding material sources during a routine inspection of the Green River site on June 13, 1989, the NRC staff would recomend that DOE give consideration to using the Hastings bedding material on the pile to further reduce the amount of rock to be hauled from Fremont Junction.

If you have any questions.concerning the above information please call me or Mr. Fliegel, of my staff at FTS 492-0554.

'N Sincerely,

\\

sPaul H. Lohaus, Chief Operations Branch Division of Low-Level Waste Management and Decommissioning, KMSS

\\

cc:

C. Watson, DOE /A1 S. Mann, DOE /HQ L. Anderson, Utah s

Distribution: Central File # WM-68 JGreeves, LLWM MBell, LLWM JAustin, LLRB JSurmeier, LLTB PLohaus, LLOB MFliegel, LLOB DGillen, LLOB SWastler, LLOB BJagannath, LLTB RHall, URF0 JJones, LLOB rf HMSS rf PDR YES /D PDR NO

/ / Category: Proprietary / /

or CF Only / /

ACNW YES /D NO /-~7 SUBJECT ABSTRACT:

DOERAP-Green River Site, Green River, UT r/ s OFC :LLOB

LLOB P:LLOB
LLWM
NM55 1
NM55 U

DATE:(0/8/89

6 /30/89 :

/ /89 : / /89 :

/ /89 :

/ /89 : / /89 0FFICIAL RECORD COPY

_ _ _ _ _ _ _