n t
_i AP_PENDIX A:
NOTICE OF VIOLATION Nebraska Public Power District Docket:
50-298 Cooper Nuclear Station Operatirg License:' DPR-46 During an NRC inspection conducted during the period oIJuly 31 through August '4, 1989, a violation of NRC requirements was identified. The violation involved inadequate design control.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1989),
the violation is. listed below:
Criterion V of Appendix B to 10 CFR Part 50, requires that activities ~
affecting quality, such as design changes, be controlled by. procedure.
Contrary-to the above, from June -1988, until August 1989, the procedures
.for.the control of design changes were inadequate in that they allowed an on-the-spot-change to alternate rod insertion system which substantially changed reset time without an evaluation.
This is a Severity Level IV violation.
(Supplements)(298/8928-01)
Pursuant to the provisions of 10.CFR 2.201, Nebraska Public Power District is
~
'hereby required-to submit to this office, within 30 days of'the date of the letter transmitting this notice, a written statement or explanation in. reply, including:
(1) the reason for the violation if admitted,- (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps
-which will be taken to avoid further violations,~and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be
.given to extending the response time.
Dated at Arlington, Texas, this s2/.aC cay of 1989 8908290019 890821 FDR ADOCK 05000298 O