Text
- _ _ _ _ _ - _ _ - - - -
-. Mpag'o, 4
I UNITED STATES 8'
NUCLEAR REGULATORY COMMISSION n
15 3,$
4 WASHINGTON, D. C. 20555
'49.....,o THE CLEVELAND ELECTRIC ILLUMINATING COMPANY, ET AL.
DOCKET NO.- 50-440 PERRY NUCLEAR POWER PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 23 License No. NPF-58 1.
The Nuclear Regulatory Conmission (the Commission) has found that:
A.
The application for amendment by The Cleveland Electric Illuminating Company, Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company, and Toledo Edison Company (the licen';ees) dated i
February 10, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commis-sion's rules and regulations set forth in 10 CFR. Chapter I; B.
The f acility will operate in conformity with the application, the provisions of_the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment-can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all app'licable requirements have been satisfied.
2.
Accordingly, Facility Operating License No. NPF-58 is amended by changing to the license as indicated in the Attachment to this license amendment.
$[$$ck bb
$0 P
'~
..i.
2
- 3..
This license amendment is effective'as of its date.of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION W==r-John N.'Hannon, Director Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reacter Regulation
Attachment:
Revised Attachment 1 to NPF-58 Date'of Issuance: July 6,1989 I
ATTACHMENT 1 TO NPF-58 DETAILED CONTROL ROOM DESIGN REVIEW Before start of the 100-hour warranty run, CEI shall implement corrections to human engineering discrepancies per comitments in Supplement 2 to the Detailed Control Room Design Review Sumary Report, dated May 28, 1986, and in a letter from M. R. Edelman to W. R. Butler, dated August 26, 1986.
Before startup following the first refueling outage, CEI shall implement corrections to human engineering discrepancies per comitments in (a) the Detailed Control Room Design Review Sumary Report, dated January 10, 1985.
(b) Supplement I to the Detailed Control Room Design Review Sumary Report, dated October 14, 1985.
(c) Revision 1 to Supplement 1 to the Detailed Control Room Design Review Sumary Report, dated October 21, 1985.
(d) Supplement 2 to the Detailed Control Room Design Review Sumary Report, dated May 28, 1986.
(e) The Control Room Validetion Summary Report, dated July 11, 1986.
(f) Errata sheets to Supplement 2 to the Detailed Control Room Review Summary Report, attached to Letter PY-CEI/NRR-0510 L, dated July 29, 1986.
(g) Detailed Control Room Design Review - First Refuel HED Revisions Report, attached to letter PY-CEI/NRR-0946L, dated February 10, 1989.
Before startup following the first refueling outage, CEI shall also provide results of the final sound surveys in the control room and at the remote shut-down facilities for NRC review per the commitment in Supplement 1 to the Detailed Control Room Design Review Sumary Report, dated October 14, 1985.
Before startup following the second refueling outage, CEI shall complete the augmented verification of human engineering discrepancy corrections imple-mented after full-power licensing per the comitment in Supplement 2 to the Detailed Control Room Design Review Sumary Report, dated May 28, 1986.
CEI shall also correct any problems identified by the augmented verification before startup following the second refueling outage per the commitment in a letter from M. R. Edelman to W. R. Butler, dated August 26, 1986.
Amendment No. 23