Requests Registration as User of BMI-1 Shipping Cask
ML20246D146
Person / Time
Site: 07100680
Issue date: 08/07/1989
From: Redmond R
OHIO STATE UNIV., COLUMBUS, OH
To: Gordan L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 8908250270
Download: ML20246D146 (7)


Text

w:

~

S LCe U \\Y Un i M Uw w."vww

'i' g

T-E Engineering Experiment Station

.142 Hitchcock Hall O,,H,7O

~

2070Neil Avenue 9

/

Columbus, OH 432101275 Phone (14-292-2411 UNIVERSTP1 N

AUGI M O August 7, 19

  • \\

M l' QEUCLIAR R

/p p

D0cMTED 9

gg

$wn t,

AUG37;ggg Q

4 Mr. Len Gordon 37]Nuss s

ECUon Transportation DiDision g

mag g

Nuclear Reactor Commission 11555 Rockville Pike q,

g Mail Stop 4E4 Rockville MD 20852

SUBJECT:

Q.A. Program Used in the Transport of Radioactive Materials for The Ohio State University Research Reactor Docket #71-0680

Dear Mr. Gordon:

Based on conversations between you and Richard Myser of the OSURR, we have revised our Q.A. Plan based on Regulatory Guide 7.10.

It is our understanding from your conversation of June 13, 1989 that the applicable sections of Annex 2 of the above Guide for the OSURR QA Program are as follows:

2.1 Organization

~

2.2 Q.A. Program (Scope) 2.4 Procurement Document Control 2.5 Instructions, Procedures, Drawings 2.10 Inspection Control 2.13 Handling, Storage, and Shipping 2.17 Q.A. Records n

2.18 Audits WearesubmittingitnowwithofficialapprovalfromtheUniversit[

Reactor Operations Committee. After your review and subsequent NRC approval we request that we be registered for a one year period to ship fuel to a DOE Facility using the BMI-1 shipping cask.

If you have questions on this matter please contact Mri Richard Myser at 614/292-6755.

Sincerely, fW hN" Robert F. Redmond Director c.. I. -[. ;,,,:,,,,,, 3 RF s 4

c:

R. Myser

/70 //(og 8908250270 890807

[

College of Engineering

7 -- -~ -

n.

PLM i

g_3 m

.?

Y

- b

.i

]

~

c 4

l

-y

[

QUALITY.AbSURANCE PROGRAM-o I

FOR THE OHIO STATE < UNIVERSITY.

F P

NUCLEAR REACTOR LABORATORY p;

Applicable to Procurement, Use, Maintenance and Repair E

c

' of Packaging Used in Transport of Rad"f onctive Materials -

j p,

jl 1

Introduction

.Therc'are two, reasons that a Quality Assurance (Q.A.) program be l

i b

established.

First'. The 0hio State University Research' Reactor Safety y,

. Analysis Report (9.7 Quality Assurance) requires the establishment and maintenance-of a Q.A. program based on ANS-15.8 (Quality Assurance Program 1

L Requirements lfor Research Reactors).

It is to provide adequate confidence that safety-related items will perform satisfactorily in service.

Second,.

g L

10CFR71.12(B) requires a program approved by'the NRC that meets"the i

l

.. requirements of Subpart H, Quality Assurance, for the Packaging and-Transportation of Radioactive Materials.

It is the second of these that this program" addresses.

It is based on Regulatory' Guide 7.10 Annex 2.

.Certain sections are not: applicable at this time and are so marked.

. Quality. Assurance is maintained by'following good-procedures.

These procedures-are based on NRC Requirements The OSURR Safety-Analysis Report and. Technical Specifications, and the OSU Office of. Radiation Safety Standards. These procedures are reviewed'and approved by the Reactor.

Operations Committee (ROC).

1.

Organization The responsibility for the Q.A. program is' delegated to the Director

of the NRL as shown in. Figure 1, " Administrative. Organization".

His/her designee, normally the Associate Director,'shall be The responsible for the daily implementation of the program.

Reactor Operations Committee has responsibility for independent I

review and audit functions associated with the program.

j The requirements for the allocation of Q.A. responsibilities are given in 10CFR71.103. The responsibilities for the execution of the Q.A. Program are as follows:

A. NRL Director

-1. Establishes Facility's Q.A. policies, goals and

. objectives.

2. Assures implementation of the recommendations contained in the ROC audits of the Q.A. Program.

l 1

s.

i 3

I l

2:..., /.

3f,'I

/ j l Fre:! cent

+

.y p.

'Vice President f'

Frevoc:

(-

Realth Ser': ices Denn.

=,

C.311ege of Engineering Resc::: Oper:tions C.::mittee Director. Engineering E:periment Station

.t Director, Nuclear Reactor

--~~--

E

Director, lOfficeRadiationSafety

. Laboratory-Reactor Users A:sociate Director, including -

Nuclear lleactor Laboratory NRL Staff Senior Reactor Operator Reac:Or Operations Staff Psths of Direct Bespcasibilit7 Salia Lines ___

F:ths of Information Dashed Lines l.

'Ad:inis:rstive organi:1tica' Figure

.1 s -

4,

s l

q777mym -- - nm=m s

.: 1 1

s <c.

sJ*,

i y_3,

h>' '

9J

?

, ts:

y 4

i m

(.

i I

l

'^

t t

B~. NRLl Associate Director l

. l 1.Phovides.forQ.A.*jndoctrinationandtrainingof-reactor

' staff.

"Independentlyyreviews staff modification request:

packages to be: submitted ' to -Reactor ~ Di, rector for review -

if necessary.

2. Has overa' authority and responsibility'for'the 1-

. implementation of1the.Q.A. program. '3."Ma'intains the.Q.A. files, 4 7 Reviews' designs, pro'edures, methods and checklists. c in ' Refers these to'the ROC for further study and approval when necessary.' ,j .1 C.'Reacter. Operations Committee

1. Reviews. Reactor? Facility's Q.A. goals, objectives and.

policies; JApproves~Q.A. Program and changes thereto. Reviews.mo,dification packages consisting of, for - j example:! experiment designs;1 safety analyses; construction ; installation!and ' test plans; operating . procedures and checklists. .j L2LAudits!the Q A. Program on an annual basis to assess its l ' implementation, effectiveness and: scope. 1This is to- . assure: compliance with the 10CFR71.337 requirement.of. j R: . management independent periodic licensee review. i! i - l s2/Louality Assurance Program (Scope) -1 .This Ohio' State University. Nuclear Reactor Laboratory Q.A. Program . applies to the following: . Quality-affecting activities relatedsto packaging shipments of radioactive materials..This may include but is not limited to j 'the packaging required for'the shipment of reactor fuel elements. 3. Design Control - Not Applicable 4. Procurement' Document Contro,1 k ' Procedures are' established to ensure the following: A. The Q.A'.' program for the packaging is in hand and NRC . approved. s B. The' verification activities required during use are in hand. T C. All pertinent' documentation is furnished with the packaging. y 2 1 e i l ___ _ u _ _ = _-_ _ _ _ _ _ _ _ _ _ _________________________}

?h

  • ?*

s; (.f 5. Instructions. Procedures. Drawings Procedures are established to ensure the fo]Iowing: k. A. Loading and unloading of radioactive material in and out of the packaging.is controlled.. B. Surveys 20r contamination, radiation, pressure, rigging and others as necessary shall be completed. *

  • 1 6 :.

Document Control;- Not Applicable- ~ 7. Control of Purchased Material, Eculpment. and Services - Not applicable 8. Identification and Control of Materials. Parts, and Components - Not applicable 9, Control-of Special Processes - Not Applicable

10. Inspection control Procedures are established for both receipt inspection of the packaging and final inspection before shipment. These may be accomplished by the use of check lists.

II. Test Control - Not Applicable

12. Control of Measuring and Test Equfpment - Not Applicable
13. Handling. Storage. and Shipping Procedures are established that ensure the proper handling, lifting, and storage of the packaging.

In addition, procedures shall ensure pre-shipment testing and NRC and DOT requirements including shipping papers are completed prior to shipment.

14. Inspection. Test, and Operating Status - Not Applicable
15. Control of Nonconforming Materials. Parts.

or Components - Not ?nplicable

16. Corrective Action - Not Applicable i
17. Quality Assurance Records Radioactive Material shipping documents shall be maintained for a minimum period of two years after the date of shipment.

i l 3 i . ] _m._____.______.__ m______

\\.. ,s's. l- {l

18. Audits 1

The Reactor Operatio}is Committee conducts audits of the'Q.A. Program on'an annual frequency to determine its effectiveness, status, and adequacy. The, audit report is reviewed by the NRL Director who is responsible for the implementation of ROC recommendations. An audit of.the' fuel shipment shall be done by audit procedure and/or audit checklist. s (.'- see. 4

  1. $ g '.

~. ,,j,; i '. J l., ,gr '.'f I f -. ~. e ) r I i 4 ( 4 . _. _. _ _ _ _ _ _ _ _ _ _ _ _ _}}