Submits Info in Response to 890620 Commitments Re Molded Case Circuit Breaker,Per Insp Repts 50-282/88-201 & 50-306/88-201.Replacement of Feedwater Isolation Valve Motor Breakers No Longer Necessary as Stated
ML20246C831
Person / Time
Site: Prairie Island  
Issue date: 06/30/1989
From: Larson C
NORTHERN STATES POWER CO.
To: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8907110157
Download: ML20246C831 (2)


Text

,-

~-

NIORITY A0(iflg hw is m n

/. D ~ I E

p{j r

Northem States Power Cws;

"'N arc W'

\\ LEA Y$

.M 414 Nicollet Mall pr<s s, g

Minneapolis, Minnesota 5540119; Dhan gg,

Telephone (612) 330-5500

/.,

m s,

f!LG June 30, 1989 I

H J Miller Division Director of Reactor Safety U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 PRAIRIE ISIAND NUCLEAR GENERATING PIANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Molded Case Circuit Breaker Replacement NRC Insnection 50-282/88-201 and 50-306/88-201 Reference 1: Letter from C E Larson (NSP) to H J Miller (NRC) dated June 20, 1989, titled: Molded Case Circuit Breakers and Other Information Related to the Vendor Inspection Branch

. Audit, NRC Inspection 50-282/88-201 and 50-306/88-201 In Reference 1 we committed to several actions related to the testing and replacement of used molded case circuit breakers (MCCB) provided by the Bud Ferguson Coapany. The following information is provided in response to those commitments.

We committed to provide a replacement schedule for two feedwater isolation valve motor MCCBs. This is no longer necessary since all used Bud Ferguson Company MCCBs utilized in safety-related applications have been replaced. The breakers were replaced with equivalent THEF style MCCBs previously used in non-safety related functions in the plant.

We also committed to a testing schedule for the replacement MCCBs. All of the replacement breakers have been successfully tested per the test procedure specified in Prairie Island's Commercial Grade Procurement Dedication Evaluation for MCCRa, This testing ensured that these original plant MCCBs I

were suitable for safety related purposes, k

l It has been discovered that the cable connectors supplied with the Bud l

Ferguson Company MCCBs were reused in the installation of some of the replacement MCCBs.

Since these cable connectors may not have been supplied by the MCCB manufacturer, they will be replaced. These replacements are I

scheduled to be completed by July 7, 1989.

i l

l 0 9907110157 890630 m

DR ADOCK 0300 2

M, 3g L __- _

l

I H J Millor June 30, 1989 Northern States Power Company i:

Page 2 Please. contact us if you have any questions related to our resolution of this

issue, s

C E Larson Vice President Nuclear Generation c: Regional Administrator III, NRC Senior Resident Inspector, NRC NRR Project Manager, NRC G Charnoff

_ _ _ _ _ _ - _ _ _ __.