ML20245L218
| ML20245L218 | |
| Person / Time | |
|---|---|
| Issue date: | 08/16/1989 |
| From: | Berlinger C Office of Nuclear Reactor Regulation |
| To: | Green W INSTITUTE OF NUCLEAR POWER OPERATIONS |
| References | |
| NUDOCS 8908220039 | |
| Download: ML20245L218 (5) | |
Text
- _ _ _ _ _ _ - _
t b
August 16, 1989
- p..
1 l
Mr. Wade Green Institute of Nuclear Power Operations l
Suite 1500, 1100 Circle 75 Parkway l
Atlanta, Georgia 30339-3064
Dear Mr. Green:
Enclosed for ycur information is our biweekly listing of generic communi-c. ions being considered or under development by the NRC staff. These include Bulletins (type coded BL on the list), Information Notices (IN) and Generic Letters (GL). Temporary Instructions, that cover the special NRC inspection effort resulting from certain generic communications, are listeo with the type code TI. This listing includes all proposed generic communications that had been reported to us by August 15, 1989.
Sincerely, Carl H. Berlinger, Chief Generic Communications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation
Enclosure:
As stated DISTRIBUTION w/ enclosure:
Xll NRC Division Directors All NRC Branch Chiefs CERossi, NRR CHBerlinger, NRR OGCB Members J0Thoma, NRR RFraley, ACRS JLieberman, OE PDR Central Files DCB DOEA R/F OGCB R/F DKirkpatrick P./F pfo3
)(
SRichardson, DOE g~
RBarber, DOE q)h OGCB:00EA:NRR C/0GC OE :NRR DCKirkpatAi,ck CHBerlinger
- fj i 08//f/894AC 08/t#89
'), f 8908220039 890816 g g e, M E Pi N T E R M P I bS$c PDC
August 16, 1989
,z
.Mr. Wade Green
" ~
Institute of. Nuclear' Power Operations.
~ Suite 1500, 1100_ Circle 75 Parkway Atlanta, Georgia 30339-3064
Dear Mr. Green:
Enclosed for your information is our biweekly listing of generic communi-cations being considered.or under development by the NRC staff. 'These include Bulletins (type coded BL on the list), Information Notices (IN) and Generic Letters (GL). Temporary Instructions, that' cover the special NRC inspection effort resulting from certain generic communications, are listed with the type
. code TI. This listing includes all proposed generic communications that had been reported to us by August 15, 1989.
Sincerely, I
J,&y ci
,y Carl H. Berlinge Chief Generic Comunicat;ons Branch Divisior, of Operatice l Events. Assessment Office of Nuclear Reactor Regulation L
Enclosure:
As stated DISTRIBUTION w/e,nclosure:
All NRC Division 1 rectors 1
'All NRC Branch Ct.sefs CERossi, NRR CHBerlinger, NRR OGCB Menbers J0Thoma, NRR RFraley, ACRS.
JLieberman, OE PDR Cer, tral Files DCB DOEA R/F OGCB R/F~
DKirkpatrick R/F SRichardson, DOE RBarber, DOE OGCB:DOEAiNRR_
C/0GC EA:NRR i
CHBerlinger DCKirkpatA,c(k 08/I(/89 08//6789U
O.
.P[gn No.
,1 M
~
08/15/89 PROPOSED GENERIC COMMUNICATIONS IN' PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT-CONTACT PHONE
~ ISSUE OFFICE DATE IN NRR/DRIS ENVIRONMENTAL QUALIFICATION OF Steve (301) 09/05/89 RVIB LIMITORQUE MOV ACTUATOR Alexander 492-0995 TERMINAL BLOCKS & MARATHON 1600' TERMINAL BLOCKS IN NRR/ DEST ERRORS IN CALIBRATION OF Joe Joyce (301) 10/31/89 SICB LEAD / LAG AND RATE CIRCUITS IN' 492-3265 REACTOR PROTECTION SYSTEMS.
GL NRR/DOEA CHANGE IN FORMAT sOR NRC Vernon' (301) 10/01/89.
OGCB GENERIC COMMUNICATIONS Hodge 492-1169 GL NRR/ DEST SUPPLEMENT TO GENERIC LETTER Shou-Nien (301)
-09/15/89 EMEB B7-11 DEALING WITH ARBITRARY Hou 492-0904 INTERMEDIATE PIPE RUPTURE REQUIREMENTS GL'AEOD.
LICENSEE COMMITMENTS FOR John (301) 08/18/89 EMERGENCY RESPONSE. DATA SYSTEM Jolicoeur 492-4155 (ERDS) IMPLEMENTATION GL NRR/ DEST NRR RECOMMENDATION ON ISI OF' Chen P.
Tan (301) 12/31/89 ESGB.
MARK I & II STEEL 492-0829 CONTAINMENTS, REFUELING CAVITIES & ASSOC DRAINAGE SYS GL NRR/ DEST RESOLUTION OF GENERIC ISSUE Om P.
(301) 02/28/90 SELB B-56, DIESEL RELIABILITY Chopra 492-0835 GL'NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 10/01/89 OTSB SPECIFICATION IMPROVEMENT -
492-1189 REMOVAL OF COMPONENT LISTS GL NRR/ DEST MINIMUM EDGE DISTANCE FOR John Ma (301) 10/31/89 ESGB INSTALLATION OF ANCHORS IN 492-1376 CONCRETE IN AEOD THE REPORTING OF SAFETY VALVE Mary S.
(301) 09/01/89 AND SAFETY-RELIEF VALVE EVENTS Wegner 492-7818 PURSUANT TO 10 CFR 50.73 GL RES/IEB RESOLUTION OF: GI/70, PORV AND N Kirkwood 492-3928 09/01/89
& RPSIB BLOCK VALVE RELIABILITY, AND E Throm
-3911 GI/94,' ADDITIONAL LOW TEMP
'OVERPRESS PROTECTION FOR LWRS TI NRR/ DEST INSPECTION OF IMPLEMENTATION Tom (301) 11/01/89 EMEB OF GENERIC LETTER 89-10:
Scarbrough 492-0916
" SAFETY RELATED MOTOR. OPERATED VALVE TESTING AND SURVEILLANCE" i
_________________J
j..
L Pags No.
2 08/15/89
- f.,,
PROPOSED' GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE
. OFFICE DATE ll L
TI'NRR/ DEST INSPECTION OF COMPLIANCE WITH Mike McCoy (301) 11/30/89 l
SRXB BULLETIN 88-04:
492-0880
" SAFETY-RELATED PUMP LOSS" GL NRR/DDEA REMOVAL OF 3.25 LIMITATION OF Tom Dunning (3013 09/01/89
-0 STB SPEC 4.0.2'FOR REFUELING 492-1189 SURVEILLANCE IN './ JION FAILURE OF LIMITORQUE VALVE John (312) 09/05/89
- 1. I OPERATOR HOUSINGS Harrison 790-5635.
IN NRR/DOEA' OPERATING EXPERIENCE FEEDBACK Vernon (301) 09/05/89 OGCB Hodge 492-1169 IN NRR/DRIS EVALUATION OF INSTRUMENT SET S. V.
(301) 08/31/89' RSIB POINTS DURING MODIFICATIONS Athavale 492-0974 GL NRR/ DEST CONTROL ROOM HABITABILITY Charles (301) 12/31/89 SPLB SYSTEMS Nichols 492-0854 IN NRR/DOEA. DIESEL GENERATOR FUEL DIL Vernon (301) 11/28/89 OGCB'
'uXIDATION Hodge 492-1169 GL NRR/DOEA LINE-ITEM TECH SPEC Tom Dunning (301) 09/15/89-OTSB IMPROVEMENT - ALT REQUIREMENTS 492-1189 FOR FUEL ASSEMBLIES IN DESIGN FEATURE SECTION OF TECH SPECS GL NRR/DREP ACCIDENT MANAGEMCNT STRATEGIES R.
Palla (301) 10/15/89 PRAB FOR CONSIDERATION IN IPE 492-1076 PROCESS - 10 CFR 50.54 BL NRR/ DEST EVALUATION OF HAZARDS
. Frank J.
(301) 21/01/89 ECEB ASSOCIATED WITH Witt 492-0823 HYDROGEN, NITROGEN AND PROPANE
.USED IN NUCLEAR POWER PLANTS IN REG V INGERSOLL-RAND AIR START Don (301) 08/17/89 MOTORS USED ON DIESEL Kirkpatrick 492-1152 GERERATORS GL NRR/ DEST GUIDANCE ON TEMPORARY REPAIR Frank J.
(301) 12/31/89 ECEB OF SERVICE WATER SYSTEM Witt 492-0823 COMPONENTS IN NRR/DRIS INADEQUATE POST MODIFICATION S. V.
(301) 08/31/89 RSIB TESTING ~
Athavale 492-0974 IN NRR/DRIS INADEQUATE CONTROL OF S.
V.
(301) 09/09/89 RSIB-TEMPORARY MODIFICATIONS ON Athaval e 492-0974 SAFETY RELATED SYSTEMS
d Pcga-No.
3
,g,', 03/15/89-.
n-PROPOSED GENERIC COMMUNICATIONS
- i b
IN PREPARATION WITHIN THE NRC
-TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE OFFICE DATE BL NRR/ DEST GROUNDS IN DIRECT CURRENT F.
Burrows (301) 10/01/89 SELB DISTRIBUTION SYSTEMS 492-0833 IN REGION REPOSITIONING OF~ INTERMEDIATE-B.
B.
Desai (404) 08/31/89 II RANGE NEUTRON DETECTORS CAUSED-331-5554 IMPROPER HIGH-FLUX TRIP SETPOINTS IN NRR/CP POTENTIAL INOPERABILITY OF H.
H.
(817) 08/25/89 BORG-WARNER PRESSURE SEAL Livermore 897-1500 BONNET CHECK VALVES IN NRR/ DEST FIRE INDUCED SPURIOUS William (301) 08/17/89 SPLB ISOLATION SIGNALS LeFave 492-0862 IN REGION I LOSS OF RESIDUAL HEAT REMOVAL Dan (301) 09/05/89 AT SALEM UNIT 1 DUE TO Prochnow 492-1166 ACCUMULATOR NITROGEN INJECTION
'IN NRR/DREP UNEXPECTED HIGH RADIATION John (301) 10/31/89 PRPB AREAS RESULTING FROM SPENT Buchanan 492-1097 FUEL POOL ACTIVITIES IN NRR/ DEST POTENTIAL CONTRIBUTES TO Dennis (301) 08/25/89 ECEB INCREASED FIRE RISK Kubicki 492-0825 IN NRR/DOEA DEGRADED GRID VOLTAGE J.
Carter (301) 09/05/89 492-1194 DEAB IN NRR/DREP [NEW3 RUPTURE OF DECAYED FUEL R.
Meck (301) 09/15/89 PRPB ASSEMBLY COULD GIVE EXCESSIVE 492-3149 OCCUPATIONAL SKIN EXPOSURES TI NRR/ DEST ENEW3 INSPECTION OF Ted (301) 11/01/89 EMEB IMPLEMENTATION OF GL 89-04:
Sullivan 492-0901
" GUIDANCE ON DEVELOPING ACCEPTABLE INSERVICE TESTING PROGRAMS" IN REGION ENEW3 FAILURE OF BORG-WARNER S.
G.
(404) 08/25/89 II GATE VALVES TO CLOSE AGAINSED Tingen 331-2603 DIFFERENTIAL PRESSURE