ML20245K830
| ML20245K830 | |
| Person / Time | |
|---|---|
| Issue date: | 06/15/1989 |
| From: | Hawkins E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Matthews M ENERGY, DEPT. OF |
| References | |
| REF-WM-73 NUDOCS 8907050276 | |
| Download: ML20245K830 (2) | |
Text
1 Pse
.. f UNITED STATES
- pA Caro,"fo$
g NUCLEAR REGULATORY COMMISSION g
a REGION IV
\\
[
URANIUM RECOVERY FIELD OFFICE
- DENVER, L
0 0 00225 JUN f 51989 URF0:0LJ Docket No. WM-73 Mark Matthews, Acting Project Manager Uranium Mill Tailings Project Office U.S. Department of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115
Dear Mr. Matthews:
It has been brought to our attention that to facilitate construction at the Tuba City site, DOE would appreciate our comments on the final design of the cover system prior to issuance of a final Technical Evaluation Report (fTER).
Based on a review of the final cover system, we have concluded that the design is acceptable.
Formal NRC conditional concurrence in the RAP will be given in the fTER which is currently being prepared.
l Sincerely,
]
A+
+
[(
Edward F. Hawkins, ranch Chief Uranium Recovery Field Office Region IV cc:
R. Richey, DOE l
M. Abrams, DOE hDj O Q 890615 WM-73 PNV ap
- !a
. 4 7.,
.4,
,-4.
JUN 15.:1989.
WM-73/DLJ/89/06/15/L DISTRIBUTION Docket Fil'e WM-73 ABBeach, RIV
])
PDR/DCS J
DJacoby
.]
RGonzales LLO Branch, LLWM l l URF0 r/f
- l l
1 i
l 3
l i
q
.{
CONCURRENCE:
DATE:
)
DJacoby/URF0 6//f[//
RGonzales/URF0
//J89 EHawkins/URF 5/X) [f 1mv i
i o
i
_:--______-___=____
--u