ML20245K257

From kanterella
Jump to navigation Jump to search
Amend 38 to License NPF-49,changing Tables 3.3-6,3.3-11, 3.7.12.2 & 3.7-4 to Allow Inoperability of Containment Purge & Exhaust Isolation Area Monitors During Performance of Integrated Leak Rate Test
ML20245K257
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/28/1989
From: Butler W
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20245K260 List:
References
NUDOCS 8907050074
Download: ML20245K257 (11)


Text

_ _ - - - _

7

^^

UNITED STATES

[

\\

NUCLEAR REGULATORY COMMISSION y

E WASHINGTON, D. C. 20555

%, *****,/

j NORTHEAST NUCLEAR ENERGY COMPANY, ET AL.

DOCKET NO. 50-423 MILLSTONE. NUCLEAR. POWER STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 38 License No. NPF-49 1.

The Nuclear Regulatory Commission (the Comission) has found that:

The app (lication for amendment by Northeast Nuclear Energy Company, j

A.

et al.

the licensee) dated May 9, 1989 as supplemented by letter dated June 16, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the, rules and regulations of the Commission; C.

.There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendeant is.in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

j 1

l 1

8907050074 89062a PDR ADCCK 05000423 P

FDC

!j

-2 2.

Accordingly, the license is amended by changes to the Technical Specifications at indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-49 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 38

, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR R ULATORY COMMISSION L

<((_

Iter R. Butler, tip(Assistant Director for Reg on I Reactors ivision of. Reactor Projects I/II Office ~of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: June 28, 1989 O

i l

f

ATTACHMENT TO LICENSE AMENDMENT NO. 38 1

FACILTIY OPERATING LICENSE NO. NPF-49 DOCKET NO. 50-423 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and 3

.contain vertical lines indicating the areas of change. The corresponding overleaf pages are provided to maintain document completeness.

Remove

- Insert j

3/4 3-44 3/4 3-44 3/4 3-65 3/4 3-65 3/4 7-33.

3/4 7-33 3/4.7-39

- 3/4 7-39 e

i

NO I

T C

6 99 8

A 2

22 2

P I

h RF

/

TN h

R

/I

/

m MO R

RP 5

AT 1

A. A.

1 S.

LE N

AS 1

NN O

I TA E

44 R

L E

B P

A 33 O

CIS T

LE 22 N

PD l

A PO

.l

.f, L

AM A

11 P

R O

- SE F

MLL UEB N

MNA O

I NR I

NAE 6

T I HP A

MCO 2

1I 2

3 T

N s

EM M

E U

R L

R A

B T

L A

S A

T N

S_ /

I iP EI G

NR e

NT l

I A

A. A.

R HO O

CT 1

NN 1

T I

NON y

N t

O i

l I

v e

T iy v

A tt e

I ci L

D e

av A

gn n

oi n

R ro o

it s

o

.ui i

dc a

i Pt t

aa e

t a

c R o r

a al e

i A

i eo t

ed d

rs e

t a l

a AI D

aR o

R l

o tt e

us P

y ns g

cu t

eu a

io e

i t

ma k

t e g

l T

n nh a

rs a

a I

e ix e

aa r

c N

m aE L

PG o

i U

n t

t t

nd S

S i

i L

a on C

))

r A

t Ca R

12 l

C N

n e

O o

u I

C a

b F

a T

CNU F

1 2

3 & a,e O.

Y x#g8#e g wA i i

i 1

i TABLE 3.3-6 (Continued)

TABLE NOTATIONS i

i With fuel in the fuel storage pool areas.

j ACTION STATEMENTS ACTION 26 -

With less than the Minimum Channels OPERABLE requirement, operation may continue provided the containment purge and exhaust valves are maintained closed.

The containment radia-tion monitoring channels required for containment area purge and exhaust isolation are not required to be OPERABLE during the performance of Type A containment leakage rate tests.

i ACTION 27 -

Not used.

ACTION 28 -

With less than the Minimum Channels OPERABLE requirement, opera-t tion may continue for up to 30 days provided an appropriate portable continuous monitor with the same Alarm Setpoint is provided in the fuel storage pool area. Restore the inoperable monitors to OPERABLE status within 30 days or suspend all operations involving fuel movement in the fuel storage pool areas.

ACTION 29 -

With the number of OPERABLE Channels less than the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.4.6.1.

l l

l MILLSTONE - UNIT 3 3/4 3 44 Amendment No. 9. 38 i

' l TABLE 3.3-11 FIRE DETECTION INSTRUMENTS TOTAL NUMBER INSTRUMENT LOCATION OF INSTRUMENTS

  • 3 liEaI f_L8ME SM0KE i

(x/y)

(x/y)

(x/y) l 1.

Containment **

a.

Elevation 24'6" 8/0

(

b.

RCP Cubicle D 4/0

. c.

RCP Cubicle A 4/0

~

)

l

' d.

RCP Cubicle C 4/0 i

e.'

RCP Cubicle B 4/0 f.

Electrical Penetration 16/0 Area, E1. 24'6" g.

Outer Annulus, El. 3'8" and 24'6" 16/0 2.

Auxiliary Buildina a.

East MCC Rod Area 0/16 b.

West MCC Rod Area 0/16 c.

North Floor Area, E1. 4'6" 14/0 d.

RPCCW Pump Area, El. 24'6" 9/0 e.

Charging Pump Area 3/0 f.

General Area, E1. 43'6" 13/0 4

g.

General Area, El. 66'6" 17/0 h.

East MCC Rod Area - CO 0/12~

i.

West MCC Rod Area - CO22 0/12-3.

ESF Buildina a.

RSS Pump Area 4/0 b.

RSS Pump Area

'4/0 c.

RHR HX Area (North) 8/0 d.

RHR HX Area (South) 4/0 e.

General Area, E1. 4'6" 2/0 f.

FWA Pump Area 2/0 g.

QSS Pump Area 4/0 h.

FWA Pump Area 4/0 1.

FWA' Pump Area S/0 j.

North HVAC Area 2/0 k.

South HVAC Area 2/0 1.

H Recombiner Bldg.

5/0 2

  • (x/y):

x is number of Function A (early warning fire detection and notification only) instruments.

y is number of Function B (actuation of Fire Suppression Systems and early warning and notification) instruments.

    • The fire detection instruments located within the containment Electrical Penetration Area, El. 24' 6",

are required to be OPERABLE during the performance of Type A containment leakage rate tests.

All other fire detection instruments located within the containment are not required to be OPERABLE during the performance of Type A containment leakage rate tests.

MILLSTONE - UNIT 3 3/4 3-65 Amendment No. 38 9

s l

1 TABLE 3.3-11 (Continued)

~

FIRE DETECTION INSTRUMENTS TOTAL NUMBER INSTRUMENT LOCATION ~

OF INSTRUMENTS

  • HEAT FLAME SMOKE (x/y)

(x/y)

(x/y) 4.

Control Building a.

Switchgear Room A 0/19 b.

Cable Tray A, E1. 4'6" 0/19 c.

Battery Room A 8/0 d.

Switchgear Room B 0/20 e.

Cable Tray B, E1. 4'6" 0/17 f.

Battery Room B 6/0 g.

NE Cable Spreading Room 0/8 h.

SE Cable Spreading Room 0/11 1.

NW Cable Spreading Room 0/8 j.

SW Cable Spreading Room 0/11 k.

Computer Room Floor 2/0 1.

East Instrument Rack Room 3/0 Floor m.

West Instrument Rack Room J/0 Floor n.

Computer Room 0/4 4/0 o.

East Instrument Rack Room 7/0 p.

West Instrument Rack Room 0/17 12/0 q.

Control Room 1/0 27/0 r.

HVAC Room 9/0 s.

Chiller Room 3/0 t.

Switchgear Room A - CO2 0/16 u.

~Switchgear Room B - CO2 0/15 0/15 v.

Cable Spreading Room - CO2 w.

Cable Spreading Room - CO2 0/19 5.

Emergency Diesel Building a.

Diesel Generator A Area 14/0 4/0 1/0 i

b.

Diesel Generator B Area 14/0 4/0 1/0 c.

Fuel Oil Tank Vault A 0/3 -

2/0 d.

Fuel Oil Tank Vault B 0/3 2/0 6.

Intake Structure a.

Cire. Water Pump Area 6/0 b.

Service Water Pump Area A 4/0 j

c.

Service Water Pump Area B 4/0 J

l 7.

Service Building 1

i a.

North Cable Tunnel

.0/6 b.

South Cable Tunnel 0/7 c.

North Cable Tunnel - CO 0/5 2

d.

South Cable Tunnel - CO 0/6 2

MILLSTONE - UNIT 3 3/4 3-66 l

v 4

PLANT SYSTEMS -

-SPRAY AND/0R SPRINKLER SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.12.2 The following Deluge Spray and/or Sprinkler Systems. shall be OPERABLE:

a.

A Emergency Generator Enclosure Sprinkler, b.

B Emergency Generator Enclosure Sprinkler,-

c.

A RSST Deluge, d.

B RSST Deluge, e.

A. Fuel Building Filter Bank Deluge, f.

B Fuel Building Filter Bank Deluge, g.

A Auxiliary Building Filter Bank Deluge, h.

B Auxiliary Building Filter Bank Deluge,

'i.

A Supplements'ry Leak; Collection Filter Bank Deluge, J.-

B Supplementary Leak Collection Filter Bank Deluge, k.

. Containment Cable Penetration Area Sprinkler,*

~1.

Charging Pump Water Curtain Sprinkler System, and m.

ESF Building Water Curtain Sprinkler System.

APPLICABILITY:

Whenever equipment protected by the Deluge Spray / Sprinkler System.is required to be OPERABLE.

ACTION:

With one or more of the above required Deluge Spray and/or Sprinkler a.

Systems inoperable, within I hour establish a continuous fire watch with backup fire suppression equipment for those areas in which redundant systems or components could be damaged; for other areas, establish an hourly fire watch patrol.

b.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

  • The Containment Cable Penetration Area Sprinkler is not required to be OPERABLE during the performance of Type A containment leakage rate tests.

MILLSTONE - UNIT 3 3/4 7-33 Amendment No. 38

_ L _

d L

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS 4.7.12.2 Each of the above required Deluge Spray and/or Sprinkler Systems shall be demonstrated OPERABLE:

E a.

At least once per 31 days by verifying that each valve (manual, power-operated, or automatic)-outside containment in the flow path is in its correct position, b.

At least once per 12_ months by cycling each testable 511ve in the flow path through at least one complete cycle of full travel, c.

At least once per 18 months by verifying that each valve (manual, power-operated, or automatic) inside containment in the flow path is in its correct position, d.

At least once per 18 months:

1)

By performing a system functional test which includes simulated automatic actuation of the system, and:

a)

Verifying that the deluge valves in the flow path actuate to their correct positions on a simulated test signal, and b)

Cycling each valve in the flow path that is not testable during plant ~ operation through at least one complete cycle of full travel.

2)

By a visual _ inspection of the dry pipe deluge and sprinkler headers to verify their integrity; and-3)

By a visual inspection of each nozzle's spray area to verify the spray pattern is not obstructed.*

~

e.

At least once por 3 years by performing an air flow or water test through each open head deluge header and verifying each open head deluge nozzle is unobstructed.*

  • Not applicable to the Fuel Building, Auxiliary Building, or Supplementary Leak Collection Filter Banks.

MILLSTONE - UNIT 3 3/4 7-34 I

o er TABLE 3.7-4 FIRE HOSE STATIONS LOCATION

  • ELEVATION HOSE RACK NUMBER Containment **

-24'6" 86, 90 Containment **

3'8" 85, 89 Coritainment**

24'6" 84, 88, 105 Containment **

51'4" 83, 87 Auxiliary Building 4'6" 45 49 Auxiliary Building 24'6" 50 53 Auxiliary Building 43'6" 54 57 Auxiliary Uuilding 66'6" 58 62 A Diesel Generator Enclosure 24'6"'

78 B Diesel Generator Enclosure 24'6" 79 Fuel Building 11'0" 65 Fuel Building 24'6" 66 68 Fuel Building 52'4" 94 i

i 1

    • The fire hose stations located within the containment are not required to be OPERABLE during the performance of Type A containment leakage rate tests.,

l hendment No. 38 MILLSTONE - UNIT 3 3/4 7 39 l

L

s PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES s

LIMITING CONDITION FOR OPERATION 3.7.12.6 The yard fire hydrants and associated hydrant hose houses given in Table 3.7-5 shall be OPERABLE.

APPLICABILITY: Whenever equipment in the areas protected by the yard fire hydrants.is required to be OPERABLE.

ACTION:

a.

With one or more of the yard fire hydrants or associated hyorant hose houses given in Table 3.7-5 inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> have sufficient additional lengths of 2 1/2 inch diameter hose located in an adjacent OPERABLE hydrant hose house to provide service to the unprotected area (s) if the inoperable fire hydrant or associated hydrant hose house is the primary means of fire suppression; otherwise, provide the additional hose within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.12.6 Each of the yard fire hydrants and associated hydrant hose houses given in Table 3.7-5 shall be demonstrated OPERABLE:

a.

At least once per 31 days, by visual inspection of the hydrant hose house to assure all required equipment is at the hose house, b.

At least once per 6 months (once during March, April, or May and once during September, October, or November), by visually inspecting each yard fire hydrant and verifying that the hydrant barrel is dry and that the hydrant is not damage.d and c.

At least once per 12 months by:

1)

Conducting a hose hydrostatic test at a pressure of 150 psig or at least 50 psig above maximum fire main operating pressure, whichever is greater, 2)

Inspecting all the gaskets and replacing any degraded gaskets in the couplings, and 3)

Performing a flow check of each hydrant to verify its OPERABILITY.

MILLSTONE - UNIT 3 3/4 7-40

- - - - - _ - _ _ _ - _ _ _ _ _ _