/ s... :
3 8-NORTHEAST UTHJTIES cener : Omces. semen street. sernn. Connecticut v ca.uc.conon ewecom,
I wom mswwmacea,c co.""'
P.O. BOX 270 oC.'[nY,*.
c'<b.,
HARTFORD. CONNECTICUT 06141-0270 g
J (203) 665-5000 w.n.a w wr_u,we c-August 10, 1989 MP-13382 Re:
10CFR50. 71 (a)
. U.S. Nuclear Regulatory Co::nission Document Control Desk Washington, D.C.
20555
Reference:
Facility Operating License DPR-21 Docket No. 50-245
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.
One additional copy of the report is enclosed.
Very truly yours,-
NORTHEAST NUCLEAR ENERGY COMPANY 2/fh&1 co W ephen. Scace Station Superintendent Millstone Nuclear Power Station SES/GSN:dlr Enclosu:es:
(4) cc:
W. T. Russell, Regional A&tinistrator Region I M. Boyle, NRC Project Manager, Millstone Unit No. 1 W. J. Raymond, Senior Resident Inspector, Millstene Unit Nos.1, 2, & 3 8908180142 890731 h
PDR ADOCK 05000245 g
PDC i
g
G'.
.o "
AVERAGE DAILY UNIT POWER LEVEL DOCKET ND.
50-245 UNIT Millstone 1 DATE 890805 COMPLETE BY G. Dewburah TELEPHONE (203)' 447-1791-L Extension 4400' MONTH July 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 32 17 656 2
516 18 585 3
653 19' 291 4
655 20 602 5
656 21 654 6
649 22 654 7
655 23 654 8
656 24 653 9
655 25 652 10 654 26 652 11 655 27 628 12 655 28 653 13 655 29 654 14 655 30 654 15 655 31 654 16 655 I
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Computer to the nearest whole megawatt.
i
P 7_
1
's 4 l
u
-4 OPERATING DATA REPORT DOCKET NO.
50-245 DATE 890805 f
COMPLETED BY" G. Newburch
{
TELEPHONE' (203) 447-1891 l
Extension 4400 OPERATING STATUS L
l 1.
Unit Name: Millstone 1 Notes:
2.
Reporting Period: July 1989 3.
Licensed Thermal Power (MWt): 2011 4.
Nameplate Rating (Gross MWe):
662 5.
Design Electrical Rating (Net MWe): 660 6.
Maximum Dependable Capacity (Gross MWe): 684 7'
Maximmm Dependable Capacity (Net NMe): 654 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level to Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A 11.
Hours In Reporting Period 744 5087 163,679
- 12. Number Of Hours Reactor Was Critical 735.7 3,785.8 128,773.4
- 13. Reactor Reserve Shutdown Hours 0
0 3,283.3
- 14. Hours General On-Line 723 3,722.5 125,519.6
- 15. Unit Reserve Shutdown Hours 0
0 93.7
- 16. Gross Thermal Energy Generated (MWH) 1,405,841 7,225,645 234,410,306 17.
Gross Elec. Energy Generated (MWH) 477,000 2,473,900 79,037,496
- 18. Net Electrical Energy Generated (MWH) 455,904 2,360,751 75,411,191
- 19. Unit Service Factor 97.2 73.2 76.7
- 20. Unit Availability Factor 97.2 73.2 76.7
- 21. Unit Capacity Factor (Using MDC Net) 93.7 71.0 70.4
- 22. Unit Capacity Factor (Using DER Net) 92.8 70.3 69.8
- 23. Unit Forced Outage Rate 0
2.7 10.4 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NONE 25.
If Shutdown at End of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION
one ane
)
CoR vat d aa t o R
e i
a eMr s
rE m
&tt ers r
D nnoL a
10 cn cen r
I of(
S 90 eAe ake ris i
74 s
v l ad ead
- t st) 1 h1 4 u
e pen wpa at r1 g-a r
ero oee Greo6 1
e r7 n C
P Rbc P rL a e p1 n
u4 o t ph e0 t
o5b4i i eSR -
i 5t 0w s
br G
b 4 s8e) n i P ytE i
2l 0N3 e h
rnR h
- l 9 0t t
xrt eU x
0i 8 2 x n
E onvN E
5M G( E es 4 FEE (
5 na
.EEYE od OMTBN po A
A NAA O
mC
/
/
NDDH o
N N
T EP C
n
)
CN LE amh o) n OU PT md roti0i D
M ee mcrnt a
O td aSf oc=l C
so A
A r
mu p
yC
/
/
ccd dnx S
N N
SieseoE t uuRi(
- ll ano t
d a a m ii r a 'r ouuot vere hnnt newuh e
i t aauoroDt e
e M M A C pP (O stt M-S nnr A
3 1234 5
6 N
eeo
/
A O
cvp N
N I
i E e T
L R
C n
U o
D i
E 9
3 t
R 8
r a
9 f
o n
R 1
o gt i
E nc m
W y
dia a
O l
ot e x
P u
htR E
J t u 4
5 e
D eh n
)
)
N MS w n
s n
o i
n i
A H
D a
e a
T S
N l
c l
N O
p ni p
W M
2 x
oL x
O n
E i
E D
T o
( t t&
(
T R
s s
c U
O a
ee i g r
H P
e B
5 rT rn o
S E
R u
ti r)
R l r snern T
i o eivEi I
a Rai a
N Fe rtll U
n c
yT a a p o) t ngr rnx i s nanort oE t r enit osi(
mel atit au ro n pt el anar uH 1
oi n u u ri r e D(
2 0
suif gemeh a q a e e pd pt eEMRROAOO R - - - - - - - -
l 2 ABCDEFGH e
ry T
S 3
8 8
d 2
1 e
e 6
7 l
t 0
0 du a
9 9
ed D
8 8
ce rh oc A
FS 4
5 0
9 0
o 9
9 FS N
8 8
I
am..
.a REFUELING INFORMATION REQUEST 1.
Name of facility: Millstone 1 2.
Scheduled date for.next refueling shutdown: March 1991 3.
Schedule date for restart following refueling: April'1991 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes, Technicia1' Specification Chances Recardina:
(1) Maximum Average Planar Linear Heat Generatino Rate (2) Maximum Critical Power Ratio 5.
Scheduled date(s) for submitting licensing action and supporting information:
Winter 1990-91 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
196 GE8B Fuel Assemblies 7.
The nur6er of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
In Core:
(a) 580 (b) 1928 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present capacity, 3229 assemblies 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1997, Spent Fuel Pool, Full Core Off Lead Capability is Reached
_ - _ _ _ _ _ - -