ML20245J344
| ML20245J344 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/09/1989 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20245J347 | List: |
| References | |
| NUDOCS 8908180007 | |
| Download: ML20245J344 (3) | |
Text
,. - _. - - _ - _ _ - - _. - _ - _.
ll l
Ak.tcm3 Power Company 40 inverness Center Parkway l ?'
Post Office Box 1295
~
l
- Birmingham Alabama 35201
. Telephone 205 868-5581 i
W. G. Hairston,111 Senior Vice President M3b3m3 DWCf Nuclear Operations the southem electnc system 10CFR50.55a(g) 10CFR50.36 August 9, 1989 Docket No. 50-364
'U. S. Nuclear Regulatory Commission Attention: Document Control Desk Vashington, D. C.
20555 Gentlemen:
Joseph M. Farley Nuclear Plant - Unit 2 l
Interval 1/ Period 3/ Outage 1 l-Inservice Inspection Report Pursuant to the requirements of 10CFR50.55a(g) Alabama Power Conq,any herewith submits the Joseph M. Farley Nuclear Plant Unit 2 Interval 1/
Period 3/ Outage 1 Inservice Inspection Report. This report describes and summarizes the inservice inspection activities performed during the th:it 2 sixth refueling outage. These activities were completed May 17, 1989.
Included in this report are the results of the steam generator eddy currect testing conducted during this outage as required by 10CFR50.55a(g) and Section 4.4.6.5.b of the Farley Nuclear Plant Unit 2 Technical Specifications.
Specifically, the results and a summary may be found in Tab B.
Other pertinent report information is available at Farley Nuclear Plant for your review. This information includes as applicable, examination plans and schedules, examination results and reports, examination methods and procedures, evaluation of results, and corrective actions and repairs.
Mt1 8908180007 890e09 l
PDR ADOCK 05000364 O
PDC kI i
s 2____.
_.-__L_.__-.
i-
-),
~ U. S. Nuclear Regulatory Commission Page 2
)
If there are any questions, please advise.
Respectfully submitted, i
ALABAMA POWER COMPANY j
/AM6 4.
}% airston, III
)
VGH/ CDP:cht-8.50
,i Enclosure cc:
Mr. S. D. Ebneter v/1 enclosure 4
Hr. E. A. Reeves l
Mr. G. F. Maxwell l
l l
I
be:
Mr. R. F. Mcdonald Mr. Bill M. Guthrie Mr. J. D. Voodard Mr. J. V. McGowan Mr. D. N.'Morey Mr. R. D. Hill Mr. C. D. Nesbitt Mr. R. G. Berryhill Mr. Scott Fulmer Mr. J. E. Garlington Mr. D. E. Mansfield v/1 encl.
Mr. D. B. Hartline Mr. T. N. Epps v/1 encl.
Mr. F. D. Kuester Mr. K. C. Gandhi FNP Document Control v/2 encl.
Commitment Tracking System (2)
File:
K-23.2.6 K-24.2.6 l
. _ _ _