ML20245H797
| ML20245H797 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 06/23/1989 |
| From: | Lieberman J, Luehman J NRC OFFICE OF ENFORCEMENT (OE), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| References | |
| EA-89-069, EA-89-69, EN-89-065, EN-89-65, NUDOCS 8906300098 | |
| Download: ML20245H797 (1) | |
Text
- __ - - __ _
Dc5
)
~
June 23, 1989 j
EN 89 q j
OFFICE OF ENFORCEMENT j
NOTIFICATION OF SIGNIFICAl4T ENFORCEMENT ACTION Licensee: Louisiana Power & Light Company (EA89-69)
(Waterford 3)
Docket No.
50-382
Subject:
PROPOSED IMPOSITION OF CIVIL PENALTY - $50,000 This is to inform the Commission that a Notice of Violation and Proposed i
Imposition of Civil Penalty in the amount of Fifty Thousand Dollars ($50,000) will be issued on or about June 28, 1989 to Louisiana Power & Light Company.
This action is based on a failure to properly evaluate ASME Section XI test results for the B High Pressure Safety Injection (HPSI) pump. This failure resulted in the plant being in violation of the minimum ECCS requirements of T.S. 3.5.2 for over two nonths.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Mailing of Notice June ?8 1989 3
Telephone Notification of Licensee June 28, 1989 The State of Louisiana will be notified.
The licensee has thirty days from the date of the Notice in which to respcnd.
Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.
Contact:
J. Luehman, OE, 23280 J. Lieberman, OE, 20741 Distribution OMFN 0;W OkFN D ; W HNBB D : D Chairman Zech E00 RM Comm. Roberts DEDR AE00 Comm. Carr DEDS Comm. Rogers OE Comm. Curtiss NMSS j
SECY NRR l
ACRS 01 CA SP GPA OGC Regional Offices MAIL RI a M RIV 4t # ADM: Doc. Mgt. Br.
RII; g RV,2, W PDR RIII; gt RES OIG PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL PUBLICLY ANN 0UNCED i
8906300098 890623 89 iG PDC 0(
/E.33 1