Revises License Expiration Date Specified in 890427 Proposed License Amend from 130228 to 120321.Revised Page 7a of License Reflecting New Expiration Date Encl
ML20245H547
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/23/1989
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-89-55, NUDOCS 8906290519
Download: ML20245H547 (3)


Text

- --

. '. g, g LVERMbNTYANKEE

^

L Nuc. LEAR -POWER' CORPORATION Ferry Road, Brattleboro, VT 05301-7002 gY,89-55 f

ENGINEERING OFFICE 500 MAIN STREET BOLToN. MA 01740 (508;779 6711 June 23, 1989 4

U.S. Nuclear Regulatory Comm'ssion Washington, D.C.

20555 Attention:

Document Contr(1 Desk

References:

a)

Construction Permit 7,o. CPPR-36 (Docket No. 50-271) b)

License No. DPK-28 ', Docket No. 50-271) c)

U.S. Atomic Energy Commission, " Final Environmental Statement Related to Operation of Vermont Yankee Nuclear Power Station," Do::ket No. 50-271, dated July 1972 d)

Letter, VYNPC to UONRC, BVY 89-41, " Proposed Amendment to Vermont Yankee OperaMng License to Extend the License Expiration to 40 Years in : Date of Issuance," dated 4/27/89

Dear Sir:

Subject:

Revision to Proposed Change No. 141:

Proposed Amendment to Vermont Yankee Operating License to Extend the License Expiration to 40 Years from Date of Issuance By [[letter::05000271/LER-1989-017, :on 890330,svc Water Check Valves Inoperable Due to Corrosion of Internal Parts.Check Valve Cleaned & Returned to Svc.Review of All Svc Water Sys Check Valve Performance Conducted|letter dated April 27, 1989]] [ Reference d)], Vermont Yankee submitted a proposed amendment request for Operating License DPR-28 to extend the date of license expiration to 40 years from the issuance date of the full-term operating license. The purpose of this letter is to revise the license expiration date specified in the subject proposed license amendment change submittal.

The current expiration date for the Vermont Yankee operating license is December 11, 2007, reflecting a period of 40 years from the date of issuance of the construction permit (December 11, 1967) [ Reference a)]. Vermont Yankee's requested change [ Reference d)] extended the expiration date of the operating license to February 28, 2013, to reflect a 40-year p9riod of operation from the date of issuance of the full-term operating license (February 28, 1973)

[ Reference b)].

During a recent discussion with NRC staff, Vermont Yankee was informed that the current NRC policy is to consider the 40-year period of operation to begin at the issuance of the first operating license following construction permit approval.

In the case of Vermont Yankee, this date would be the date of Vermont Yankee's low power license, issued on March 21, 1972.

Therefore, in accordance l

with the NRC's curretit policy, Vermont Yankee herewith revises the subject pro-posed license amendment change submittal [ Reference d)] to amend the requested e

8906290519 890623 T'

.C PDR ADOCK 05000271 i

k\\

P-PNV

e' VERMONT YANKEE NUCLEAR POWER CORPORATION I

U.S. Nuciear Regulatory Commission June 23,1989 Page 2 operating license expiration date from February 28, 2013, to March 21, 2012.

This revision reflects a 40-year operating license period starting from the date of issuance of Vermont Yankee's low power operating license.

This revision is without prejedice to a further revision to this application, should the Commission revise its above-described policy prior to the allowance of this amendment request, or to a further amendment request should such a revision occur after that event.

The enclosure to this letter provides a revised page 7a of the facility's operating license reflecting an expiration date of March 21, 2012. We trust that this submittal is satisfactory; however, should you have any questions or-require further information concerning this submittal, please contact us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION fx Warren P. Murphy Vice President an Manager of Operations

/dm cc: USNRC Regional Administrator, Region I USNRC Resident Inspector, VYNPS Vermont Department of Public Service

F-

-7a-

~

geservice Inspection In accordance with the provisions of 10 CTR 50.12 (a) an exasption gr,s the provisions of 10 CFR 50.55a (a) is granted, and the A-53 eff*Crive date for the start of the next 40-month period as it 7.9.79 reistes to inservice inspection is eatended from July 30. 1979 to January 30. 1980.

gg e license te effective se of the date of issuance and shall arpire at midnight on March 21, 2012.

W TMF. ATtrl!C EVERr:Y ctPf!!$$104 L.

. -/.

A. CiamTue,so. Desuty*vareews 3

I j,).,g for Reactor Freiects Directorate of Licensing Enclosurest Appendices A & 8 - Technical Specifications Date of fesuance:

FD) 2.t*I3 I

l l-l 1L-____

__ _--