p ver Vapey Power Station SNppingport. PA 150774104 -
t i
Vee Pr s Nuclear Group 4412) f434206 June 22, 1989 U.
S.' Nuclear Regulatory Commission Attn:
Document Control Desk-Washington, DC 20555
Reference:
' Beaver. Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 157 Gentlemen:
Enclosed.are:
1.
An application for Amendment to the above Operating License to increase the maximum river water temperature limit and revise 2everal other Technical Specifications based upon revised containment pressure analyses performed to support increasing
.this limit.
2.
Documents designated Attachments A,B,C and D which set forth the change
-in the Technical Specifications, the safety.
- analysis, the no significant hazards evaluation and applicable UFSAR changes, respectively.
This change was reviewed by the OSC and ORC and determined to be safe and does not involve an unreviewed safety question.
Please note that in addition to the Technical Specification changes.provided within this change request, one additional change is required to support the revised containment pressure analyses.
As part of Technical Specification Change Request No. 156, a change to the Refueling Water Storage Tank (RWST) level setpoint for transfer to recirculation was proposed and is currently under your review.
If the enclosed change request should be found acceptable prior to completing your review of Change Request No.
- 156, the proposed RWST level setpoint change for transfer to 00 8906290468 890622 I \\
-P ADOCK 05000334 PDC t
Beaver Valley Power Station, Unit 1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 157 Page 2 recirculation should be included in this amendment.
Also note that the RWST level-auto QS flow reduction setpoint proposed in this change request supersedes the level setpoint provided in Change Request No. 156 as explained in Attachment B.
Very truly yours, v_ L d (~-----.
D. Sieber l
{ Vice President i;Uclear Group i
cc:
Mr. J.
Beall, Sr. Resident Inspector (w/o Attachment D)
Mr. W. T. Russell, NRC Region I Administrator (w/o Attachment D)
Mr.
P. Tam, Sr. Project Manager Mr. T. M. Gerusky, Director BRP/ DER (w/o Attachment D)
Mr. R. Janati BRP/ DER (w/o Attachment D)
Director, Safety Evaluation & Control (VEPCO) (w/o Attachment D)