Text
'
.T.S.6.9.1.6 R
T:
. PHILADELPHIA ELECTRIC" COMPANY b
38'95243270-t,lMERICK GENER ATING STATION P. O. BOX A SAN ATOGA, PENNSYLV ANI A 19464 p'.
(215) 327-1200, EXT, 3000.
- GM AH AM M. LEITCH
. VIER PRE $fDENT btRRERSCM SEM6h ATING BTATION l
f August 11, 1989'
' Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-84' U.~:S.LNuclear-Regulatory Commission Attn:
Document Control Desk Washington, DC. 20555
Subject:
Limerick Generating Station Monthly Operating Report-
'For Units 1 and 2 Enclosed are the monthly operating' reports for Limerick Unit 1-and Unit 2' for the month of July 1989 forwarded ' pursuant to
- Technical Specification 6.9.1.6.
A Low Power (5%)
Operating License for Unit 2 was received'from the NRC on July 10, 1989.
Very trul.
- ours,
/
' JJM/kk Enclosure cc:
William T.-Russell, Administrator, Region I, USNRC T.-J. Kenny, USNRC Senior Resident Inspector l
)
890816036D 690731 1
PDR ADOCK 05000352
({ \\
R PDC
~
i
_ = ___ - -
3895.243270 l
AVERAGE DAILY UNIT POWER LEVEL i
00CKET NO. 50 - 352 UNIT LIMERICK UNIT 1 DATE AUGUST 11 1989 COMPANY PHILADELPHIA ELECTRIC COMPANY J. J. MURPHY REPORTS SUPERVISOR PROJECTS DIVISION LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3752 MONTH JULY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 921 17 920 2
908 18 921 3
919 19 917 4
920 20 913 5
919 21 873 6
918 22 889 7
943 23 932 8
956 24 963 9
970 25 962 10 971 26 963 11 929 27 969 12 968 28 957 13 930 29 982 14 924 30 988 15 920 31 1022 16 919
e.
3895243270 i
L L-OPERATING DATA REPORT 1
DOCKET NO. 50 - 352 DATE AUGUST 11, 1989 COMPLETED BY PHILADEl.PHIA ELECTRIC COMPANY J.
J. MURPHY REPORTS SUPERVISOR j
PROJECTS DIVISION LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3752 OPERATING STATUS 1,
UNIT NAME: LIMERICK UNIT 1 NOTES: ON 07/22/89. THERE WAS A
- 2. REPORTING PERIOD:
JULY. 1989 30% SPIKE LOAD REDUCTION
- 3. LICENSED THERMAL POWER (MWT):
3293 WHILE CONTROL RODS WERE 4 NAMEPLATE RATING (GROSS MWE):
1138 ADJUSTED PRIOR TO AN E-DESIGN ELECTRICAL RATING (NET MWE):
1055 INCREASE TO 100% POWER.
~
'G.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1055 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE 11, HOURS IN REPORTING PERIOD 744 5.087 30.647
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2.111.5 23.455.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 1.965.9 22.998.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.256.382 5.099.172 65.896.929
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 732.560 1.622.500 21.304.170
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 698.559 1.492.283 20.334.771 PAGE 1 0F 2
3895243270-OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 352 DATE AUGUST 11 1989
(
THIS MONTH VR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 38.6 75.0
- 20. UNIT AVAILABILITY FACTOR 100.0 38.6 75.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 89.0 27,8 62.9
- 22. UNIT CAPACITY FACTOR (US;NG DER NET) 89.0 27.8 62.9
- 33. UNIT FCRCED OUTAGE RATE 0.0 0.0 3.4 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST OTR 86 2/01/86 PAGE 2 0F 2
N7
- P -
O3- -
_ M -
I
- O-TN - -
E 0
- C-AO- -
S E
TI - -
NAS E
7
- C-SS - -
OTN C
- I -
N - -
2 I AE R - R -
GE - -
TDC U
3
- T -
R NT - -
C I
)
O
- T -
- C-ONIX- -
UFL)1 S
4
- I -
- E -
SOTE- -
RO R6
- N L -
II A T
RE1 E
2
- U8 - E -
VSR0- -
SNOL0 M
RIE0 - -
NOF( -
A 5
- 1
_ A - YEVN2 - -
I I G
S
_ I - HPI E1 - -
TSTE 9
-. - H PUDG- - - E
- ATRR
_ 1 - P - RS 7 - - V
)
REOU
)
8 2 - K -
1
- L - U SK2 - - I E
4 GAEPN 5
I 5 - C -
- E - M5TC3 - - T C
3
(
PHE(
(
3 - I - T - D-TCI
- - C N
TESR T
- R - S - A -
.RCR) - - E E
I R E
I
- - E - U - L - JOJE5 - - R R
BPYTL B
- M - G - I -
POM1 - - R R
I RNI I
0 - I - U - H -
.ERI 2 - - OOU HRTEF H
5-L-A - P - JRPL( - - CTC XONV X
E EFEE E
E E
Y E
- DNR O
M T
B N
- NO N
A A
O
- AIT N
D D
H TN T
E P
- ECE E
T T
E
- SAV K
I E
L
~ U E
M)
C N
L E
~ A R
AN O
U P
T
- C P
.RI D
M MCA O
lil AS L
C
- T R
P
- N CC X
- EE)
)
SI E
- ND5 3
T
(
- OO(
LLA
(
- PC AAM R
- M UUO E
- O NNT H
- C DAAU T
I OMMAO
- M H
- EE)
T - - - -
- TD4 E
S
- SO(
M1 234 M
- YC O
- 5 I
9 -
lll I
T 8 -
N C
9 -
O U
1
. E I
D
. E T
E
- STT A
R V -
- NNR N
L -
- EEO I
R U-
- CVP M
E J -
- I EE A
W
- L R
X O
E P
~
~
)
E
)
D N
N S
N N
W)
I N
I O
H
- FO3 A
E A
T
- OD(
L C
L S
N P
NI P
W O
- DGR X
OL X
C M
- ONO E
I E
O
- HIT (T
T +
(
D T
- TTC S
C T
R
~ ETA EE I G R
U O
~ MUE RT RN O
H P
HR U
TI R
S E
S LR SNER)
R lIl T
N iI I O EI VEN A
RAI I
I O)
FE RTLA N
S2 C
YTAAL U
A(
)
TNGR RNP E
2 NA NORTOX R
(
ENI TOSI E ll!
ii1 MELATI T(
N)
PTELANAR OS I NUURI RE IR UI FGEMEH TU NQAEEPDPT AO OEMRROAOO RH S
U(
A - - - - - - - -
D E
RABCDEFGH E)
P1 Y(
T lIl IIIIl1I D
E L
E DU T
ED A
)
CE D
1 RH
(
OC FS
-l1!
i i O
N
- 5
~
3895243270 Docket No. 50-352 Attachment to Monthly Operating Report for July 1989 Limerick Generating Station Unit 1 July 1 through July 31, 1989 I.
Narrative Summary of Operatina Experiences Limerick Unit 1 began the month of July in operational condition 1 at a nominal 90.0% of rated thermal power.
Following a modification to the Process Computer, which more accurately calculated Thermal Limits for the new core load, reactor power was increased to 95% on July 7.
Power was reduced on July 12 due to a decrease in condenser vacuum when a blocking error occurred.
Due to elevated feedwater copper concentrations and the need for control rod pattern adjustments, power was not returned to 95% until July 23.
Although feedwater copper levels remain slightly elevated, Limerick Unit 1 power was increased to a nominal 100% of rated to allow Chemistry stabilization and continue monitoring of copper levels.
There were no operational items of significance during the month of July.
II.
Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Relief Valves during the month of July.
)
)
m r-e;.
3895243270-4 1
1 AVERAGE OAILY UNIT' POWER LEVEL-00CKET NO. 50 - 353 UNIT LIMERICK'____ UNIT 2 DATE AUGUST 11. 1989.
COMPANY PHILADELPHIA' ELECTRIC COMPANY J.
J. MURPHY REPORTS SUPERVISOR ~
PROJECTS DIVISION LIMERICK GENERATING STATION 32711200 EXTENSION TELEPHONE (215)
________________...._____3752' MONTH JULY 1989 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE OAILY POWER LEVEL (MWE-NET)-
(MWE-NET)'
-1'
'O 17 0
2-0 18 0
'3 0
19 0
4-0 20 0
5 0
21 0
.6 O
22 0
7 0
23 0
8 0
24
-0 9-~~
0 25 0
10 0
'26 0
I 11 0
27 0
12 0
28' O
13 0
29 0
g 14 0
30 0
15 0
31 0
1 16 0
l l
1
' I,. k
- +
a..
3895243270L c '
OPERATING DATA REPORT u
DOCKET NO. 50 - 353 L.
DATE AUGUST ~11, 1989 -
t COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M
J.: J. MURPHY REPORTS SUPERVISOR PROJECTS DIVISION-LIMERICK GENERATING ETATION TELEPHONE (215) 327-1200 EXTENSION 3752 OPERATING'. STATUS
- 1. UNIT NAMES LIMERICK.
UNIT 2 NOTES: INITIAL FUEL LOAD WAS
' ;2.. REPORTING PERIOD:
JULY.'1989 COMPLETED ON 7/04/89.
- 3.' LICENSED THERMAL POWER (MWT):
0
.A LOW POWER (5%) LICENSE 4 NAMEPLATE RATING (GROSS MWE):
1138 WAS RECEIVED ON 7/10/89
- 5. DESIGN ELECTRICAL RATING (NET'MWE):
1055 INITIAL CRITICALITY'IS
- 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)
- -
FORECASTED FOR 8/11/89.
.7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) ST,NCE LAST. REPORT. GIVE REASONS:-
90 DOWER-LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
.10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE' CUMULATIVE 1 1..
HOURS IN REPORTING PERIOD 744 5.087 30.647
'12. NUMBER OF HOURS REACTOR WAS CRITICAL 0
0 0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
'14, HOURS' GENERATOR ON-LINE 0.0 0.0 0.0
'.15. UNIT RESERVE SHUTDOWN HOURS hh hh hh
- 16. GROS $' THERMAL ENERGY GENERATED (MWH)
D 0
0 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0
0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0
0 PAGE 1 OF 2 1
~
3895243270 OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 353 DATE AUGUST 11 1989 THIS MONTH VR-TO.DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 0.0 0.0 0.0
- 20. UNIT AVAILABILITY FACTOR 0.0 0.0 0.0 21 UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 0.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 0.0
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 0.0 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
LIMERICK UNIT #2 IS ENTERING TEST STATUS
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26, UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY g r11j 89 r
j INITIAL ELECTRICITY J..A.N..19 9 0 COMMERCIAL OPERATION
.F.E.B.19 9.0
- NOT APPLICABLE PRIOR TO COMMERCIAL OPERATION PAGE 2 OF 2
4
. ~-
_ Y _
2 _ -
2
_ N _
5_
_ A _
N7 5
_ P _
O3_
9
_ M_
I
_ O_
TN _ _
E 8
_ C_
AO__ _
S E
TI NAS E
3
_ C'_ _
SS _ _
OTN C
_ I _
N_
IAE R
c
_ 2 _
_ R_
GE_
TDC U
_ T R
NT_
C I
)
O
_ T __
ONIX_ _
UFL)
_ C __
S 1
SOTE- _
RO R6 9_E I
_ N _
L_
IIA T
RE1 E
_ 8 _
E VSR0 SNOL0 M
_ U_9_
RI E0 NOF( -
A
_ 1 _ A _ YEVN2 - _
II G
S
_. _ I _ HPIE1 - _
TSTE H_RSPUDG-
_ _ E
- ATRR P
L_MSTC3=_ _ V
)
REOU
)
7 -
1 3 _ K _ 1 _
_ U: SK2 = _ I E _
4 GAEPN 5
I 5 _ C _
_ E
_ T C _
(
PHE(
(
3 _ I _ T _ D _
TCI
_ _ C N _
TESR T
_ R _ S _ A _
RER) _ _ E E __
IR E
I
- _ E _ U _ L _ JOJE5_ _ R R
BPYTL B
_ M
_ G __ I
.POM1 _ _ R R _
I RNI I
0 _ I
_U_PH_JRP1E R I.(2
_ _ O O U __
HRTEF H
5_L-A
_ _ CTC XONV X
E _
EFEE' E
E E. Y E
_ DN R _
~O M
T B
N
_ NO N
A A
O
_ AI T _
~ _
N D
D H
TN _
T E
P
_ ECE _
E T
T E
_ SAV_
K I
E L
_ U E_
M)
C N
L E
_A R
AN O
U P
T
_ C P _
.RI D
M MCA O
ASL C
_ T R
P
_ N CCX
_ EE)._
)
SIE
_ ND5_
3 T(
_ OO(
(
LLA
_ PC AAMR
_ M UUOE
_ O NNTH
_ C DAAUT OMMAO
_ M -
H
= EE) _
T - - - -
s
- TD4 _
E S
- SO( _
M1 234 N
- YC c
O
= S 9 __
I lI T
8 N
C 9 __
O U
1
_ E D
_ E.
- _
I T
E
_ STT _
A R
Y _
- NNR _
N L _
EEO _
I R
U_
CVP _
M E
_ IEE _
A C
J_
_ L R _
X O
E P
_ It
)
E
)
D N
N N
S N
W) _
I N
I A
H
_ FO3 _
A E
A T
_ OD( _
L C
L S
N P
NI P
R O
_ DGR _
X OL X
M
_ ONO _
E I
E tO
_ HIT _
(T T +
(
D T
_ TTC _
S C
T R
_ ETA _
EE IG R
U O
_ MUE _
RT RN O
H P
HR _
U TI R
S E
S - _
LR SNER)
R
!I IO EI VEN T
N A
RAI I
I O) _
FE RTLA N
S2 _
C YTAAL U
A( _
)
TNGR RNP i
E 2
NANORTOX R
(
ENI TOSI E t 1 MELATI T(
N) _
PTELANAR OS _
I NUURI RE IR _ _
UIFGEMEH TU__ _
NQAEEPDPT AO_
OEMRROAOO RH.
S U(. _
A - - - - - - - -
D E
l1 E) _ -
RABCDEFGH P1 _
Y( _
T D
E L
DU E_
T ED A _
)
CE RH D __
1
(
OC FS
_il ill.
O __
N F5 c
l l
4 3895243270 Docket No. 50-353 Attachment to Monthly.
Operating Report for July 1989 Limerick Generating Station Unit 2 July 1 through July 31, 1989 I..
Narrative Summary of Operatina Experiences Limerick Unit 2 began the month of July in OPCON 5 * (Refuel under which irradiated-fuel may be handled) with the initial fuel load in progress.
The core was fully loaded as of July 4, 1989. Following the core verification, the fuel pool gates were installed on July 7.
OPCON 4 (Cold shutdown) was entered on July 11 following reactor vessel assembly.
The Unit 2 reactor vessel was hydrostatically tested between July 13 and 21 to-support leakage verifications, scram time testing and various start-up tests.
Unit 2. ended this period-in OPCON 4 with preparations for initial criticality being made.
There were no operational items of significance during the month of July.
II.
Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Relief Valves during the month of July.