ML20245F992
| ML20245F992 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/31/1989 |
| From: | Hairston W, Dennis Morey ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8908150158 | |
| Download: ML20245F992 (5) | |
Text
_..-
e Alabama Power Company
- 800 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1837 W. G. Hairston, ill Senior Vice President b
Nuclear Operations ;
tho Southern electrc system August 11, 1989 Docket No. 50-364 I
t U. S. Nuclear Regulatory Commission j
ATTN: Document Control Desk Washington, D. C.
20555 Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report l
Attached is the July 1989 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted,
/b. -
.'. fairston, III 4
JGS:scj/1.6 Attachment cc:
Mr. S. D. Ebneter Mr. E. A. Reeves Mr. G. F. Maxwell l
I l
l
.191 I
fL
[<D159 999,3, l
I' HDOCK 05000364 g
l' JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVd GUMMARY OF OPERATIONS July, 1989 l
t There was one significant power reduction during the month of July. On July 24, power was reduced to repair the inboard bearing on the 2A steam generator feed l
pump to eliminate high vibration. A rigid support was installed to prevent recurrence. The unit returned to full power operation on July 28.
The following major safety-related maintenance was perforced in the month of July:
1.
A leaking snubber (2RHR8A) was replaced.
2.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
i 1
l
.__.___-______---_-__-i
OPERATING m'IA REPORT DOCKET NO.
50-364 DATE 7 /2/89 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 i
OPERATING STA'IUS L
Joseph M. Farley - Unit 2
" Notes L
1.' Unit Name:
- 2. Reporting Period:
July, 1989
- 1) Cumulative data since
- 3. Licensed Thermal Power ( N t):
2,652 7-30-81, date of
- 4. Nameplate Rating (Gross MWe):
860 commercial operation
- 5. Design Electrical Rating (Net me): 829
- 6. Maximum Dependable Capacity (Gross MWe):
870.3
- 7. Maximum Dependable Capacity (Net MWe):
829.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level.To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A l
'1his Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744 5,087 70.176
- 12. Number Of Hours Reactor Was Critical 744.0 3,698.3 60J1752-
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 iITE
- 14. Hours Generator On-Line 744.0 3,588.4 59',621.0
- 15. Unit Reserve Shutdown Hours
- 0. 0-0.0 0.0
- 16. Gross Thermal Energy Generated (MNH) 1,864,633 8,994,957 151,192,593
- 17. Gross Electrical Energy Generated (WH) 606,536 T )47,188 49,682,674
- 18. Net Electrical Energy Generated (MWH) 576,288 2,781,874 47,107,160
- 19. Unit Service Factor 100.0
- 70. f 85.0
- 20. Unit Availability Factor 100.0 70.5 85.0
- 21. Unit Capacity Factor (Using MDC Net) 93.4 65.9 12~1-
- 22. Unit Capacity Factor (Using DER Net) 93.4 66.0 81.0
- 23. Unit Forced Outage Rate 0.0 3.4 4.5
. 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of EachT:
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achitered INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30
DOCKET No.
50-364 d.
-l UNIT 2
DATE AUGUST 2, 1989-COMPLETED BY D. N. Morey TELEPHONE (205)899-5156-MONTH JULY
' DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(MWe-Net)
. (M4e-Net) l' 822
-17 824
~2 826 18.
826 3'
826 19 823 4
~827 20 822 5
825 21 818 6
824 22 803 7
823 23 827 8-823 24 522 i
i 9
822 25 503 10 823 26 502 11-
=820 27 508 12 820 28 589
-13 822 29 824 14 824 30 824 15 821-31 824 16.
823 1
INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Form 13/21 l
= = ____ _-_
E 1 Y 1 d
t L
E 5 a e n
, R -
o e. e R
A 2 O 9 b f n v F
M 9 n
o e S
i r i r 6
'.T 4
S
)
o t p 3 M U N 5 e t a G
0 h a r o 0 J U. 2 t r b t f[A D
(
e i E
E r n vd G
V C
i e e
E l
R I
N a
g.h T
E p
g l U
O $E N 2 C - R e mi a e N E O R r a h t e
(
N T 7 MA W
R T 3
e s
a s R
C ot e n s t n e T
N_ D D R O N E t s t i n a e l c
E E
K T T F C O R a
o D ci C I E L I
d A n s i
i F O N L E E T T e2 i a t f L
)
S c
m w c o D U P T
- C N M
E A E u 'e i u
r R O
S V
d h l t r n o E C
U E
e t e r t o f L m
A R
r o.
s i
(
C P
n o p e nt s t S
s o t p c I a t r a
u n
- r e o w g e s e G a e p n n r
p h e r i i d r t e S R t
w a r g c b P yt
)
i e r b i u i r b
o e ui e i
r n1 i
~
h r t e 6 h
P b t r r x o n v 1 lll IllllIIIlIIIIIiiIIIIIIi E f E E 0 E
T S
N O
E O
N I
O T
F E A
C M D V
U O O D
C C ER lll IllllIIIlI11IIIi IIIIlII R
T M
~
E L
E W
U T E O
J S D K
m)
P Y O S
a n S C
. r i D
H
~
m c a A
N lll IllllIIIlIllIIIiIIIliII a S l N
T r
p 0
c c x 1
E 9
S i E S
2 N
E t
(
W T
S T
l l a O
R N T R
- a a m r D
O E N O A
d u u o e T
P C E P
/
o n n t h U
E I V E N
h a a ut H
A L E R t M M A O S
e - - - -
T lll IllllIIII IIIIIIIIIIlIII M 1 2 3 4 I
NU R
OT F
C O G A n
N E A
o D I R
/
i O T N
t H T N a
T U W n
E E O i
M S D m
a lll IllllI IIIiIIIIIIIII1III x
E N
)
e O
n s
S i
n A
B a
e E
l c
R p
ni x
o L lll ill ll1IIIiIIIIIIIIIiIII E
i
(
t t &
s c
N e e i g O
)
r T r n I S u
t i T R A
l r
s n e A U
/
i o e i v E R O N
a R a i H
F e r t U
(
t n g r D
c yT a a lll ilIll1III IIIIIIIIII iIII n a n o r t o e n i t o s i m e l a t i t
- p t e l a n a r E
ni n u u r i r e P
o uif g e m e h Y
S s q a e e p d p t T
a E M R R O A e - - - - - -
lll ilIlllIIIIIIIIIIII II III R A B C D E F G 4
2 E
7 T
0 d
A 9
e D
8 l
lll IlIll lII IIIII IIIIIIII I I d u e d c e r h 7
o c 0
F S lll 1lIlllIIIII1IIIl1IiI III F 5 O
0 N
?
l