.4 OPERATING DATA REPORT DOCKET NO.:
50-412-REPORT DATE: 07/10/89 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393-7621 OPERATING STATUS i
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: JUNE 1989
- 3. LICENSED THERMAL POWER (MWt):
2660 4.,NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
636
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
385
- 7. MAX DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANGES OCCUR IN CAPACITY RATITOS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWo):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 4343.0 14198.0
- 12. NO. OF HLS. REACTOR WAS CRI'lICAL:
456.2 2196.7 11446.0 i
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
450.4 2144.7 11324.C
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1009593.0 4518330.0 2920 d70.4
- 17. GROSS ELECT. ENERGY GEN. (MWH):
319500.0 1430200.0 90buJ00.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
296410.0 1316615.0 8531780.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 62.6 49.4 79.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 62.6 49.4 79.8
- 22. UNIT CAPACITY FACTOR (DER): PCT 49.2 36.3 71.9
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 37.4 17.8 6.5
- 24. SHUTDOWN 3 SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 8908150124 890808 PDR ADOCK 05000334 R
_ _