ML20245F756
| ML20245F756 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 07/31/1989 |
| From: | Feigenbaum T, Nardone P PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-89102, NUDOCS 8908150059 | |
| Download: ML20245F756 (6) | |
Text
._
2j New Hampshire Yankee l
NYN-89102 August 9, 1989 United States Nuclear Regulatory Commis91on Washington, DC 20555 Attention: Document Control Desk
References:
Facility Operating License NPF-67, Docket No. 50-443
Subject:
. Monthly Operating Report Gentlemen:
In accordance with Technical Specification Section 6.8.1.5, enclosed please find Mont".tly Operating Report 89-07 covering the operation and shutdown experience relating to Seabrook Station Unit 1.
Very tru
- yours, ft;V Asf/u f
\\
Ted C. Feigenba -
Senior Vice Preside and Chief Operating Officer Enclosure cci Mr. William T. Russell Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road King r.,f Prussia, PA 19406 NRC Senior Resident Inspector P.O. Box 1149 Seabrook Station, NH 03874 8908150059 090731 PDR ADOCK 05000443 R
'NT New Hampshire Yankee Division of Public Service Company of New Hampshire l
P.O. Box 300
- Seabrook, NH 03874
- Telephone (603) 474-9521
'1
OPERATIIG DATA REPORT j
DOCKLT IG.
50-443 l
UNIT Seabrook 1 DATE 08/02/89 OCEPIETED LY P. Nardone l
TELEPHONE (603) 474-9521 (Ext. 4074)
OPERATIIG STA'IUS 1.
Unit Name:
Seabrook Station Unit 1 2.
Reporting Period:
JULY 1989 f
3.
Licensed mennal Power (MNt):
3411 4.
Nameplate Rating (Gross MWe):
1197 5.
Design Electrical Reting (Net MNe):
1148 6.
Prima Dependable Capacity (Gross MWe):
1197 (Initial design value) 7.
Wvimn Dependable Capacity (Net MWe):
1148 (Initial design value) 8.
If Changes Occur in Capacity Ratings (Itans Number 3 Wrough 7)
Since last Report, Give Reasons:
Not Applicable 9.
Power Level 'Ib Nhich Restricted, If Any 170 MWt
- 10. Reasons For Restrictions, If Any License issued on 05/2_6/J) itr a low power license authorizing operation at reactor oore power levelc not in excess of 170 mecawatts thermal.
This Nonth Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.0 5087.0 24456.0,_,
- 12. Number Of Hours Reactor h s Critical 0.0 194.4 194.4
- 13. Raactor Reserve Glutdown Hours 0.0
- 0. 0 _ _.
0.0
- 14. Hours Generator On-Line 0.0 0.0 ~
0.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Wermal Er.ergy Generated (MWH) 0 1090 1090
- 17. Gross Elec. Energy Generated (MWH) 0 0
0
- 18. Net Eluctrical Energy Generated (MWH) 0 0
0
- 19. Unit Service Factor 0.0 0.0 0.0
- 20. Unit Availability Factor 0.0 0.0 0.0
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0
- 22. Unit Capacity Factor (Using DER Ibt) 0.0 0.0 0.0
- 23. Unit Forced Outoge Rate 0.0 0.0 0.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Reactor shutdown as of 06/22/89 for indefinite duration.
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
Indefinite
- 26. Units In Test Status (Prior to Ctsmarcial Operation): Forecast Achieved INITIAL CRITICALITY 1989 06/13/89 INITIAL ELECTRICITY 1989 Fot prolicable COMERCIAL OPERATION 1989 Not Applicable I
1 of 5 I
i
)
--_________________J
E AVER 7GE DAILY UNIT PCS IH!EL DOCKET NO.
50-443 UNIT Seabrook I g.
DATE 08/02/89 CCNPLTfED BY P. Nardone,_
TELEPIONE (603) 474-9521 (Ext. 4074)
K NIH JULY, 1989 DAY AVERAGE DAILY PONER LEVEL DAY AVERIEE DAILY PONER LEVEL (MNe-Net)
(NWe-Net) i-1 0
16 0
2-0 17 0
3 0
18 0
4 0
19 0
5 0
20 0
6
-0 21 0
7 0
22 0
8 0'
23 0
9 0
24 0
10 0
25 0
11 0
26.
0 12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
31 0
INSTRUC1' IONS On this format, list the average daily unit power level in NNe-Net for each day in the reporting nonth. Ccxnpute to the nearest whole megawatt.
2 of 5
3k8 o44 4 o/d7 4o2 r4
- r0a t
0b/N) x 5a9 3E e
e e0 0(
v.
c S
m
(
- 4. t u r
.TEYE or mNA ITBN O
u c
m n
)
DDH une amhc) n I
T EP CoR r o t i. 0 i E
TE i
mcrnt a
L
&tt aSfoc=l K
EE cn r
mu p
CO PT eAe ccd dnx D
M s
v SieseoE C
u e
tuuRi(
O a
r l1 ano t -
C P
niirar amutvere du c
onmt newul uoroDt h a m A O pP (O t M-e M1234 5
9 3
e estt S
nnr E
eeo C
cvp I
iEe H
T L
R n
I X
N o
9 8
i I
K t
D 9
E 1
a R
S n
I i
R Y
H m
E L
3 S
a W
U r
x O
J f
o R
E P
o gtnc K
e
)
)
D dia n
s n
N ote S
i n
i A
htR E
a e
a I
t u I
l c
l S
D ehn R
p ni p
t N
MSw i
I x
oL x
o N
E i
E O
K D
E (t
t&
i
(
D s
c I
T O
ee ig r
U N
rT rr o
H 2
u ti r)
S P
n lr snern E
o i o e i v Ei T
R s
a Rai a
I a
Fe rtll N
e c
yP aap I
R tngr' rnx nanortoE e ni t o s i(
melati n i n u u m n_ t n
pt el ar o) e a E M R R 5i r is ouifg n eh sqaee t pt tr r
au AOO ro e
D (H RABCDEFGH u
2 l
e p
y T
d e
l du ed e
ce t
rh a
bc D
ES o
N FS 1
l
'1 2
te 5
)
9 4
e s
1 e
7 v
e.
9' n
4 0
l re
.3 k
8 o
7 4
a c
4 u
/
d 4
vy on 4
v.
2 r
e t a t
yk n
a 0
a
)
0
/
H 3
x l
de l
5 e
8 0
E fe et rv ln e
0 6
(
S P
ei ii f
tr aa f
E Y
N W
td fm E
u
.0 W
T B
0 I
br yd A
f o
aey 2
R f
I D
D P
C nt ll a T
E E
J ea eul E.
T L
pu rde K
A E
E ot er C
I T
C c
th O
P N
oa nce D
M A
t esv N
d r
i EO de r gt E
er unc la cie D
ie rrf A
ah eue M
fs vdd o
ri yd ow A l. ce t r T
aa ema N
u1 s yl E
t n a v. ep M
co h yR P
AR P
IUQB D
ETA IE I'
r T
o e
n I
9 trv o
E 8
ael i
F 9
rga t
5 A
1 enV a
S na B
t f
r 8
ehn 5
s o
R Y
N 1
Gco b
xi XAu 4
C L
VB lEt w
S H
F UJ O
ne a
F n Y
Wistl Dit H
R 1
Saeao E ai2 A
ries rnS M
Q 1TDHI 1TUE M
US H
I E
N
'L N
M AN TR n
MO o
P li II E
at A
R M
cu M
E e
ib r
c ri E
s i r t r V
y ve ct I
S rt es 1'
ea li C
9 8
8 E
/
/
T 7
8 n
0 1
n
/
/
7 7
0 0
D0Lur10.
50-443 INIT Seahook 1 DATE 08/02/89 CCMPIRI'ED BY P. Nardone TELEPIONE (603) 474-9521 (Ext. 4074)
REFUELIIG INKR% TION REQUEST
- 1. Name of facility: Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown: Not Scheduled
- 3. Scheduled date N r restart following refueling: Not Scheduled
- 4. Will refueling or re,sumption of operation thereafter require a technical specification change or other license cuuurent?
Unknown at this time.
- 5. Scheduled date(s) for subnitting licensing action and supporting information:
Not Applicable
- 6. Important licensing considerations associated with refueling, e.g.,
new or di:fferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None
- 7. W e number of fuel assemblies (a) in the core ard (b) in the spent fuel storage pool:
y (a) In Core:
193 (b) 0
- 8. We present licalsed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
l Present licensed capacity: 1236 No increase in storage capacity requested or planned.
- 9. W e projected da+e of the last rerueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability.
We current licensed capacity is adequate until at least the year 2007.
5 of 5
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _