MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20203D6311997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Seabrook Station, Unit 1 ML20198Q2591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Seabrook Station ML20217H6101997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Seabrook Station, Unit 1 ML20216H6141997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Seabrook Station ML20210K6011997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Seabrook Nuclear Station,Unit 1 ML20141H1031997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Seabrook Station ML20148K6791997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Seabrook Station ML20141F3331997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Seabrook Station Unit 1 ML20137V9651997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Seabrook Station Unit 1 ML20147E5891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Seabrook Station Unit 1 ML20134M2261997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Sns ML20133M6221996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Seabrook Station Unit 1 ML20132D6251996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Seabrook Station Unit 1 ML20134H3721996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Seabrook Station Unit 1 ML20128N5241996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Seabrook Station Unit 1 ML20117N1551996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Seabrook Station ML20116J0761996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Seabrook Station, Unit 1 ML20115B1061996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Seabrook Station Unit 1 ML20117K4941996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Seabrook Station, Unit 1 ML20111B0361996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Seabrook Station.W/ ML20101R2261996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Seabrook Station Unit 1 ML20106G8461996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Seabrook Station, Unit 1 ML20100G8611996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Seabrook Station Unit 1 ML20096B9021995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Seabrook Station Unit 1 ML20095C1071995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Seabrook Station Unit 1 ML20094L1381995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Seabrook Station Unit 1 ML20093F5431995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Seabrook Station Unit 1 ML20092G2781995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Seabrook Station Unit 1 ML20087F1521995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Seabrook Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20247H3171998-04-27027 April 1998 Rev 1 to Seabrook Station SGs B & C Isi,May/June 1997 ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station 05000443/LER-1998-002, Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted1998-03-20020 March 1998 Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted ML20216H9211998-03-13013 March 1998 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198G0271997-12-31031 December 1997 Commonwealth Energy Sys 1997 Annual Rept ML20248L7711997-12-31031 December 1997 Western Massachusetts Electric 1997 Annual Rept. Supporting Info,Encl ML20198G1021997-12-31031 December 1997 Baycorp Holdings 1997 Annual Rept ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20198G0351997-12-31031 December 1997 Eastern Edison Co 1997 Annual Rept ML20198G0681997-12-31031 December 1997 Taunton Municipal Lighting Plant 1997 Annual Rept ML20248L7671997-12-31031 December 1997 North Atlantic 1997 Annual Rept ML20198F9511997-12-31031 December 1997 United Illuminating Co 1997 Annual Rept ML20236M9561997-12-31031 December 1997 Amended Public Service of New Hampshire 1997 Annual Rept 1999-09-30
[Table view] |
Text
._
2j %.
New Hampshire <
Yankee ,
l NYN-89102 August 9, 1989 United States Nuclear Regulatory Commis91on Washington, DC 20555 Attention: Document Control Desk
References:
Facility Operating License NPF-67, Docket No. 50-443
Subject:
. Monthly Operating Report Gentlemen:
In accordance with Technical Specification Section 6.8.1.5, enclosed please find Mont".tly Operating Report 89-07 covering the operation and shutdown experience relating to Seabrook Station Unit 1.
Very tru yours, ft;V Asf/u Ted C. Feigenba -
f \
Senior Vice Preside and Chief Operating Officer Enclosure cci Mr. William T. Russell Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road King r.,f Prussia, PA 19406 NRC Senior Resident Inspector P.O. Box 1149 Seabrook Station, NH 03874 8908150059 090731 PDR ADOCK 05000443 R PDC New Hampshire Yankee Division of Public Service Company of New Hampshire
'NT l P.O. Box 300
- Telephone (603) 474-9521 '1
OPERATIIG DATA REPORT j DOCKLT IG. 50-443 ,
l UNIT Seabrook 1 DATE 08/02/89 -
OCEPIETED LY P. Nardone l TELEPHONE (603) 474-9521 (Ext. 4074)
OPERATIIG STA'IUS
- 1. Unit Name: Seabrook Station Unit 1
- 2. Reporting Period: JULY 1989
- 3. Licensed mennal Power (MNt): 3411
- 4. Nameplate Rating (Gross MWe): 1197 f
- 5. Design Electrical Reting (Net MNe): 1148
- 6. Prima Dependable Capacity (Gross MWe): 1197 (Initial design value)
- 7. Wvimn Dependable Capacity (Net MWe): 1148 (Initial design value)
- 8. If Changes Occur in Capacity Ratings (Itans Number 3 Wrough 7)
Since last Report, Give Reasons: Not Applicable
- 9. Power Level 'Ib Nhich Restricted, If Any 170 MWt , _
- 10. Reasons For Restrictions, If Any License issued on 05/2_6/J) itr a low power license authorizing operation at reactor oore power levelc not in excess of 170 mecawatts thermal.
This Nonth Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.0 5087.0 24456.0 ,_,
- 12. Number Of Hours Reactor h s Critical 0.0 194.4 194.4
- 13. Raactor Reserve Glutdown Hours 0.0 0. 0 _ _ . 0.0
- 14. Hours Generator On-Line 0.0 0.0 ~ 0.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Wermal Er.ergy Generated (MWH) 0 1090 1090
- 17. Gross Elec. Energy Generated (MWH) 0 0 0
- 18. Net Eluctrical Energy Generated (MWH) 0 0 ,
0
- 19. Unit Service Factor 0.0 0.0 0.0
- 20. Unit Availability Factor 0.0 0.0 0.0
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 __
0.0
- 22. Unit Capacity Factor (Using DER Ibt) 0.0 0.0 0.0
- 23. Unit Forced Outoge Rate 0.0 0.0 0.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Reactor shutdown as of 06/22/89 for indefinite duration.
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup: Indefinite
- 26. Units In Test Status (Prior to Ctsmarcial Operation): Forecast Achieved INITIAL CRITICALITY 1989 06/13/89 INITIAL ELECTRICITY 1989 Fot prolicable COMERCIAL OPERATION 1989 Not Applicable I
1 of 5 I i
)
--_________________J
E
. . AVER 7GE DAILY UNIT PCS IH!EL
, DOCKET NO. 50-443 UNIT Seabrook I
- g. DATE 08/02/89 __
CCNPLTfED BY P. Nardone,_
TELEPIONE (603) 474-9521 (Ext. 4074)
K NIH JULY, 1989 DAY AVERAGE DAILY PONER LEVEL DAY AVERIEE DAILY PONER LEVEL (MNe-Net) (NWe-Net) i-1 0 16 _
0 2- 0 17 0 3 0 18 0 4 0 19 0 5 0 20 0 6 -0 21 0 7 0 22 0 8 0' 23 0 9 0 24 0 10 0 25 0 11 0 26. 0 12 0 27 0 13 0 28 0 .
14 0 29 0 15 0 30 0 31 0 INSTRUC1' IONS On this format, list the average daily unit power level in NNe-Net for each day in the reporting nonth. Ccxnpute to the nearest whole megawatt.
2 of 5
3k8 o44 4 o/d7 4o2 r4 .
- r0a t 0b/N) x 5a9 3E e e e0 0( v. c S P6 (
d m r
.TEYE ITBN or
- 4. t u mNADDH unec O u m n )
T I
EP CoR amhc) n E TE r o t i. 0 i K L &tt i mcrnt a C
O EE PT eAe cn aSfoc=l r mu p D s v ccd dnx M u e SieseoE C
O a r tuuRi( t -
C P l1 ano du amutvere niirar c
onmt uoroDt newul he a m A O pP (O t M- - - -
3 M1234 5 9 e #
e stt S nnr eeo E
C cvp I iEe H T L R I n X 9 8
N o I i D 9 K t E
R 1 a S
I i n
R Y H m E L 3 S a W U r x O J f o R E P o gt nc K ) e )
D N
dia n s n ote S i n i A htR E a e a S
I D t u ehn I l p c l p
R ni i
t N MSw o I x oL x i
N E i E O K D E (t t& (
D s c I
U T O N
ee rT ig rr r
o H
S P
2 n u lr ti snern r)
E o i o e i v Ei T R s a Rai a I a Fe rtll N e c yP aap I R tngr' rnx nanortoE e ni t o s i(
n melati o) n pt el i n u u m n_ arte is ouifg n eh tr sqaee tr pt au ro u
a E M RAOOR 5i r e
RABCDEFGH D (H 2
_ l e
p
_ y T
d
_ e l
_ du ed e ce t rh
_ a bc D ES
_ o : :
N FS 1
l
'1 - t 2 .
5 ) . e 9 4 e s 1 -
9' e - 7 v e.
.3 k 8
n o
4 7
0 4
l a .
rec 4
4 u /
2 d
r 4
vy e
on t a
.- v. 0 a ) t yk n 0 l a / H 3 x l de 5 e 8 0 E fe et S
e 0 P
. 6 f
( rv ei ln ii E
tr aa
. f E Y N W td u fm 0 W T B 0 I br yd aey 2 R A f f o I D D P C nt ll a T . E E J ea pu eul E. T L E E rde er K
C A I T C ot c th O
D P N A
oa nce esv M
E N t
d r i O de r gt E er la unc cie D ie rrf A
M ah fs eue vdd ri o yd ow t r A l. ce T
N aa u1 ema s yl E t n M co ha v. ep P
I AR P yR U
Q B
D E
T A
I E
I -
r T o e n I 9 trv o E 8 ael rga i
F 9 t 5 A 1 enV a S
r na B t f 8 ehn 5 s o R Y N 1 Gcoxi b XAu S C
F L
U J
H O
VB-ne lEta Fw n 4
Y H Wistl Dit R 1 Saeao E ai2 A ries rnS M
M Q 1TDHI -
1TUE U
S H I
E N
'L N
A M
N T n
MORE I
I P li at o
A R M e
cu M E ib r c ri E s y
i r ve t r V ct I
1' S rt ea es li C
B SW FD R
R C
C 9 9 8 8 E / /
T n
7 8 1
0 n /
7
/
7 0 0
D0Lur10. 50-443
, INIT Seahook 1
. ,, DATE 08/02/89 CCMPIRI'ED BY P. Nardone TELEPIONE (603) 474-9521 (Ext. 4074)
REFUELIIG INKR% TION REQUEST
- 1. Name of facility: Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown: Not Scheduled
- 3. Scheduled date N r restart following refueling: Not Scheduled
- 4. Will refueling or re,sumption of operation thereafter require a technical specification change or other license cuuurent?
Unknown at this time.
- 5. Scheduled date(s) for subnitting licensing action and supporting information:
Not Applicable
- 6. Important licensing considerations associated with refueling, e.g., ,
new or di:fferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None
- 7. W e number of fuel assemblies (a) in the core ard (b) in the spent fuel storage pool: y (a) In Core: 193 (b) 0
- 8. We present licalsed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: .
l Present licensed capacity: 1236 No increase in storage capacity requested or planned.
- 9. W e projected da+e of the last rerueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability.
We current licensed capacity is adequate until at least the year 2007.
5 of 5