4 April 21, 1989 e
CD @
MEd0RANDi1MFOR:Charles L. Miller, Director Standardization and Non-Power 3
Reactor Project Directorate 1
l Division of Reactor Projects-- III, IV, f
V and Special Projects FROM:
Dino C. Scaletti, Project Manager Standardization and Non-Power Reactor Project Directorate i
Division of Reactor Projects - III, IV, 1
V and Special Projects
SUBJECT:
SUMMARY
OF' STAFF'S DESIGN QA AUDIT OF GE'S ABWR j
l I
Enclosed are the QA staff's findings rel ted to their audit of the General t
Electric (GE) Company Advanced Boiling Water Reactor (ABWR) design quality
)
assurance.
The enclosure has had two small portions removed at the request of I
l GE to protect company proprietary information. An interim suninary related to this review was issued by memorandum from Dino Scaletti to Lester Rubenstein on June 14, 1988.
]
/s/
]
Dino C. Scaletti, Project Manager i
Standardization and Non-Pover Reactor Project Directorate Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
1 As stated DISTRIBUTION:
J. Sniezek J. Richardson l,CentralfFile,f 4
J. Partlow P. Hooks
'PDSNP R/F'~
OFo3 F. Miraglia J. Spraul NRC PDR G. Holahan J. Stewart J. Joyce J. Roe C. Tan C. McCracken I/l J. Zwolinski G. Bacchi L. Marsh I
L. Rubenstein C. Cheng F. Rosa C. Miller J. Craig M. Hodges A. Gody S. Newberry l
(DESIGNQA
SUMMARY
)
hP 1
P M Scaletti:cw vMiller O
4/K/89 fp-4/4/89 8905020371 890421
{DR TOPRP ENV Q
L 4
1
'o UNITED STATES
[8
~g NUCLEAR REGULATORY COMMISSION C
3 g
(j WASHINGTON, D. C. 20555. -
j t
g April 21,.1989.
,1 I
MEMORANDUM FOR: Charles L. Miller, Director 1
Standardization and Non-Power i
Reactor Project Directorate l
Division of Reactor Projects - III, IV, Y and Special Projects FROM:-
Dino C. Scaletti, Project Manager l
Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, V and Special Projects
SUBJECT:
SUMMARY
OF STAFF'S DESIGN QA AUDIT OF GE'S ABWR a
l Enclosed are the QA staff's' findings related to their audit of the General l
Electric (GE) Company Advanced Boiling Water Reactor (ABWR) design quality assurance. The enclosure has had two small portions removed at the request-of GE to protect company proprietary information. An interim summary related to this review was issued by memorandum from Dino Scaletti to Lester Rubenstein on June 14, 1988.
i i
ino C. Scaletti, Project Manager Standardization and Non-Power l
Reactor Project Directorate Division of Reactor Projects - III, IV, j
'y and Special Projects l
l
Enclosure:
l As stated l
l l
l l
-