4 April 21, 1989 e

CD @

MEd0RANDi1MFOR:Charles L. Miller, Director Standardization and Non-Power 3

Reactor Project Directorate 1

l Division of Reactor Projects-- III, IV, f

V and Special Projects FROM:

Dino C. Scaletti, Project Manager Standardization and Non-Power Reactor Project Directorate i

Division of Reactor Projects - III, IV, 1

V and Special Projects

SUBJECT:

SUMMARY

OF' STAFF'S DESIGN QA AUDIT OF GE'S ABWR j

l I

Enclosed are the QA staff's findings rel ted to their audit of the General t

Electric (GE) Company Advanced Boiling Water Reactor (ABWR) design quality

)

assurance.

The enclosure has had two small portions removed at the request of I

l GE to protect company proprietary information. An interim suninary related to this review was issued by memorandum from Dino Scaletti to Lester Rubenstein on June 14, 1988.

]

/s/

]

Dino C. Scaletti, Project Manager i

Standardization and Non-Pover Reactor Project Directorate Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

1 As stated DISTRIBUTION:

J. Sniezek J. Richardson l,CentralfFile,f 4

J. Partlow P. Hooks

'PDSNP R/F'~

OFo3 F. Miraglia J. Spraul NRC PDR G. Holahan J. Stewart J. Joyce J. Roe C. Tan C. McCracken I/l J. Zwolinski G. Bacchi L. Marsh I

L. Rubenstein C. Cheng F. Rosa C. Miller J. Craig M. Hodges A. Gody S. Newberry l

(DESIGNQA

SUMMARY

)

hP 1

P M Scaletti:cw vMiller O

4/K/89 fp-4/4/89 8905020371 890421

{DR TOPRP ENV Q

L 4

1

'o UNITED STATES

[8

~g NUCLEAR REGULATORY COMMISSION C

3 g

(j WASHINGTON, D. C. 20555. -

j t

g April 21,.1989.

,1 I

MEMORANDUM FOR: Charles L. Miller, Director 1

Standardization and Non-Power i

Reactor Project Directorate l

Division of Reactor Projects - III, IV, Y and Special Projects FROM:-

Dino C. Scaletti, Project Manager l

Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, V and Special Projects

SUBJECT:

SUMMARY

OF STAFF'S DESIGN QA AUDIT OF GE'S ABWR a

l Enclosed are the QA staff's' findings related to their audit of the General l

Electric (GE) Company Advanced Boiling Water Reactor (ABWR) design quality assurance. The enclosure has had two small portions removed at the request-of GE to protect company proprietary information. An interim summary related to this review was issued by memorandum from Dino Scaletti to Lester Rubenstein on June 14, 1988.

i i

ino C. Scaletti, Project Manager Standardization and Non-Power l

Reactor Project Directorate Division of Reactor Projects - III, IV, j

'y and Special Projects l

l

Enclosure:

l As stated l

l l

l l

-