Amend 24 to License NPR-62,revised Tech Spec to Change Setpoint Requirement for Control Rod Scram Accumulator Low Pressure Alarm
ML20245F093
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/04/1989
From: Shemanski P
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20245F097 List:
References
NUDOCS 8908140147
Download: ML20245F093 (4)


Text

_

st' %q 4,_

jg UNITED STATES y

3s.

p, NUCLEAR REGULATORY COMMISSION r; '

.x l WASHING TON, D. C. 20555 f"

e,,,e ILLIN0IS POWER COMPANY, ET AL._

DOCKET NO. 50-461 CLINTON POWER STATION, UNIT N0. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 24 License No. NPF-62 1.

The Nuclear Regulatory Commission (the Comission) has found that:

Illinois Power Company * (IP), and Theapplicationforamendmentby(thelicensees)datedMay A.

Soyland Power Cooperative, Inc.

18, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance r!ith the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the pblic; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:

  • Illinois Power Company is authorized to act as agent for Soyland Power Cooperative, Inc. and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.

8908140147 e90004 PDR ADOCK 05000461:

P PNU

+-

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 24, are hereby incorporated into this license.

Illinois Power Company shall operate the facility in accordance with the Technical S r cifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Tor Paul C. Shemanski, Acting Director Project Directorate III-2 Division of Reactor Projects - III, TV, V and Special Projects

Attachment:

Changes to the Technical

' Specifications Date of Issuance:

August 4, 1989 l

l l

ATTACHMENT TO LICENSE AMENDMENT NO. 24 FACILITY OPERATING LICENSE NO. NPF-62 DOCKET NO. 50-461 Replace the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by amenoment number and contains vertical lines indicating the area of change.

Remove I_nsert 3/4 1-10 3/4 1-10

p.

l :^ =

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS 1

LIMITING CONDITION FOR OPERATION (Continued) 3.1.3.3 ACTION (Continuedj:

2.

With more than one withdrawn control rod with the associated scram accumlator inoperable or with no control rod drive pump operating, immediately place the reactor mode switch in the Shutdown position.

c.

The provisions of Specification 3.0.4 are not applicable.

1 I

SURVEILLANCE REQUIREMENTS 4.1.3.3 Each control rod scram accumulator shall be determined OPERABLE:

At least once per 7 days by verifying that the indicated pressure is a.

greater.than or equal to 1520 psig, unless the control rod is inserted and disarmed or scrammed.

b.

At least once per 18 months by:

1.

Performance of a:

a)

CHANNEL FUNCTIONAL TEST of the leak detectors and b)

CHANNEL CALIBRATION of the pressure detectors and verification of an alarm setpoint of greater than or equal to 1520 psig on l

decreasing pressure.

4 CLINTON - UNIT 1 3/4 1-10 AMENDMENT N0. 24