ML20245D473
| ML20245D473 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/09/1989 |
| From: | Quay T Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20245D475 | List: |
| References | |
| NUDOCS 8906270124 | |
| Download: ML20245D473 (5) | |
Text
-_______- - - -
f ** %,
'.T UNITED STATES iE' NUCLE 4.R REGULATORY COMMISSION
+"
- t. '-WV, elr
- i. AsmcTou. o. c. 2csss DETROIT EDISON COMPANY WOLVERINE POWER SUPPLY COOPERATIVE, INCORPORATED DOCKET NO. 50-341 FERMI-2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.31 License No. NPF-43 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Detroit Edison Company (the licensee) dated May 24, 1988 (NRC-88-0062), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission, C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment vill not be inimica' to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-43 is hereby amended to read as follows:
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through
'1 Amendment No. 31, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license; DECO shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
890627p2k$
c PDR P
o
. 4 3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 1
1
' i s A'W
,s 4Lc Theodore R. Quay, Acting Director I
Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Tecnnical Specifications Date of Issuance:
Marcr. 9, 1989 I
l i
l i
o
e ATTACHPENT TO LICENSE AMENDMEtiT NO. 31 FACILITY OPEEATING LICENSE NO. NPF-43 DOCKET NO. 50-341 Replace the following pages of the Appendix "A" 'iechnical Specifications with the attached pages.
The revised pages are identified by Amendment nunter and contain a vertical line indicating the area of change. The corresponding overleaf pages are also provided to caintain document completeness.
REMOVE INSERT 3/4 0-2 3/4 0-2 3/4 0-3 3/4 0-3 j
1 l
/
APPLICAEILITT 5 SURVEILLANCE REQUIREMENTS
- 4. 0.1 Surveillance Requirements shall be met during the OPERATIONAL CONDITIONS or otner concitions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.
4.0.2 Each Surveillance Requirement shall be performed within the specified.
time interval with:
a.
A maximum allowable extension not to exceed 25% of the sur.'eillance interval, but b.
The combined time interval for any 3 consecutive surveillance inter-vals shall not exceed 3.25 times the specified surveillance interval.
4.0.3 Failure to perform a Surveillance Requirement within the allowed surveil-lance interval, defined by Specification 4.0.2, shall constitute noncompliance with the OPERABILITY requirements for a Limiting Condition for Operation.
The time limits of the ACTION requirements are applicable at the time it is -identi-fied that a Surveillance Requirement has not been performed.
The ACTION require-ments may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of the surveil-lance when the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Surveillance Requirements do not have to be performed on inoperable equipment.
4.0.4 Entry into an OPEF ATIONAL CONDITION or other specified applicable condi-tion shall not be made un.ess the Surveillance Requirement (s) associated with the Limiting Condition for Oparation have been performed within the applicable surveillance interval or as othe nise specified.
This provision shall not prevent passage through or to OPER,\\TIONAL CONDITIONS as required to comply with ACTION requirements.
4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2, & 3 components shall be applicable as follows:
Inservice inspection of ASME Code Class 1, 2, and 3 components and a.
inservice testing of ASME Code Class 1, 2, and 3 pumps and valves l
shall be performed in accordance with Section XI of the'ASME Boiler
{
and Pressure Vessel Code and applicable Addenda as required by l
10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50, Sec-l tion 50.55a(g)(6)(i).
b.
Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspec-tion and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as follows in these Technical Specifications:
FERMI - UNIT 2 3/4 0-2 Amendment No. 31
1
'APPLICAEILIT<'
i SURVEILLANCE REQUIREMENTS (Continued)
ASME Boiler and Pressure Vessel Required frequencies Code anc applicable Acdenda for performing inservice terminology for inservice inspection and testing inspection and testino activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days c.
The provisions of Specification 4.0.2 are applicable to the above required frequencies for performing inservice inspection and testing activities.
d.
Performance of the above inservice insDection and testing activities snall be in addition to other specified Surveillance Requirements.
e.
Nothing in the ASME Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any Technical Speci fi ca~ti on.
i "1
1 l
l
- i l
FERMI - UNIT 2 3/4 0-3 Amendment No. 31 L
- _ _ _ _