Notifies That Plant Inservice Insp Program Will Be Revised by Start of Unit 1 Refueling Outage,Scheduled for Sept 1988, to Reflect Use of 1983 Edition of ASME Code W/Addenda Through Summer 1983 Addenda
ML20245D402
Person / Time
Site: Byron  
Issue date: 05/16/1988
From: Ainger K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
4648K, NUDOCS 8805230164
Download: ML20245D402 (1)


Text

-.

CoNWhenwealth Edloon i

One Fest Nabonal Plaza Checa0o, inros Address Reply to: Poet Offce Box 767 Ch<ago, innois 60690 0767 May 16, 1988 U.S. Nuclear Regulatory Comission Attn:

Document Control Desk Washington, DC.

20555 Subj ect: Byron Station Units 1 and 2 Inservice Inspection Program NRC Docket Nos. 50-454 and 50-455

Reference:

(a) May 6, 1987 letter from K.A. Ainger to US NRC Centlemoa The Byron Unit 1 Inservice Inspection (ISI) Program has been developed to meet the requirements of the ASME Code Section XI, 1980 Edition with Addenda through Winter 1981 Addenda. The comercial operation date of Byron Unit 2 necessitates the use of the 1983 Edition of the ASME Code for the Unit 2 ISI program.

In order to maintain a consistent inspection program for Units 1 and 2, we proposed to use the 1980 Edition of the ASME Code for both units. This was documented in reference (a).

Upon further review, we have decided to use the 1983 Edition of the ASME Code with Addenda through Summer 1983 Addenda for Byron Units 1 and 2.

The Byron ISI Program Plan will be revised accordingly by the start of the Unit I refueling outage scheduled for September, 1988.

Please direct any questions regarding this matter to this office.

Very truly yours, 1

K. A. Ainger Nuclear Licensing Administrator cc: Byron Resident Inspector NRC Region III Office 4648K 8805230 PDR AC 1

0 0