Application for Amend to License DPR-77,consisting of Tech Spec Change 89-24,providing one-time Extension of 12-month Ice Weighing Interval Through 900401
ML20245D265
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 06/20/1989
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20245D267 List:
References
NUDOCS 8906270038
Download: ML20245D265 (2)


Text

_ _ _ _ _ _ __-

..g f

O TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 SN 157B Lookout place WUN 201989 TVA-SQN-TS-89-24 10 CFR 50.90 U.S. Ituelcar Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 centlemen:

In the Matter of ) Docket No. 50-327 Tennessee Valley Authority SEQUOYAll NUCLEAR PLANT (SQN) UNIT 1 - TECHNICAL SPECIFICATION (TS,1 CHANGE 89-24 In accordance with 10 CFR 50.90, we are enclosing a requested amendment to license DPR-77 to change the TSg of SQN Unit 1. The proposed change requests a one-time extension of the 12-:onth ice-weighing interval as contained in Surveillance Requirement 4.6.5.1.b.2. TVA currently anticipates this one-time extension will be needed through April 1, 1990, Which is the projected schedule for the beginning of the Unit 1 Cycle 4 refueling outage. This ice-weighing surveillance can only be performed during shutdown; therefore, to avoid a prolonged mode 5 shutdown of the plant and to support scheduling of Unit 1 outage work activities, TVA requests that NRC response be provided by August 1, 1989.

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3. A copy of the calculation supporting the technical justification for this extension is provided in Enclosure 4. The methodology  ;

used in the Unit 1 calculat. ions is identical to that used for TVA's previously  !

approved one-time extension for SQN Unit 2 that was submitted to NRC on September 21, 1988 (TS 88-18).

Ob3o 8906270030 PDR 090620ADOCK pgg O5000327 P

1 I

An Equal Opportunity Employer

e

  • i U.S. Nuclear Regulatory Commission '

20 W Please direct questions concerning this issue to D. V. Goodin at (615) 843-7734.

Very truly yours,-

TENNESSEE VALLEY AUTHORITY M. J. R y,. Manager Licensing Project Management sworn id subsc ibed before me this day of - M 1989 danM. 6Mk Notary Public My Commission Expires "h[-

Enclosures cc (Enclosures):

Ms. S. C, Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission ,

One White Flint, North 11555 Pockville Pike ]

Rockvil10 Maryland 20852 j i

Mr. B. A. Wilson, Assistant Director for Inspection Programs I

TVA Projects Division U.S. Nuclear Regulatory Commission Region II I 101 Marietta Street, NW, Suite 2900 )

Atlanta, Georgia 30323 l

Mr. Michael H. Mobley, Director (w/o enclosures) ;i i

Division of. Radiological Health T.E.R.R.A. Building 150 9the Avenue, W Nashville, Tennessee 37203 j NRC Resident Inspector ,

Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy,. Tennessee 37379 American Nuclear Insurers Attention: Librarian The Exchange, Suite 245 270 Farmington Avenue Farmington, Connecticut 06032

__ ____-____-