Advises That Util Completed Installation & Preoperational Testing of Sys Re Compliance W/Atws Rule 10CFR50.62. Understands That Info Will Be Used as Input to NRC Sims
ML20245D187
Person / Time
Site: Limerick Constellation icon.png
Issue date: 04/18/1989
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8904280146
Download: ML20245D187 (1)


Text

,,

?#

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STRE'ET P.O. BOX 8699 PHILADELPHIA A. PA.19101 (215)841 45o0 JOHN S. KEMPER c;wien vics-enssiosur - wucts^"

April 18, 1989 U. S. Nuclear Regulatory Conmission Docket No. 50-353 Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Unit 2 Compilance with ATWS Rule 10 CFR 50.62

REFERENCE:

L: letter to PECo, R. J. Clark to E. G.

'Bauer, Jr., dated 11/3/87, Same Subject.

Gentlemen:

The referenced letter provided a Safety Evaluation Report for Philadelphia Electric Company's (PECo) proposed designs to int)1ement the requirements of 10 CFR 50.62, and requested that the NRC be advised when the systems are installed and checked-out in Limerick Generating Station, Unit 2.

This letter fulfills that request.

PECo has completed Installation and preoperational testing of the systems which provide the functions of alternate rod injection, standby liquid control and the recirculation pump trip for anticipated translents without scram.

I understand this information will be used as input to the Nuclear Regulatory Conmission's Safety Issues Management Systems.

If any addltlonal informatIon is required, please let me know.

Sincerely,

^^

ERG /dk/041288 Copy to:

T.

i. Kenny, LGS, Senior Resident Inspector W.1. Russell, Region I Administrator R. J. Clark, LGS, Project Manager h

gr%%MM9"ag3 O