ML20245C773

From kanterella
Jump to navigation Jump to search
Notification of 871104 Meeting W/Doe in Bethesda,Md to Discuss NRC Comments on DOE Sponsored Power Reactor Inherently Safe Module (Prism) Conceptual Lmr Design Proposed by Ge.Proposed Agenda Encl
ML20245C773
Person / Time
Issue date: 10/29/1987
From: King T
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Beckjord E, Morris B, Speis T
NRC
References
PROJECT-673A, PROJECT-674A NUDOCS 8711030532
Download: ML20245C773 (3)


Text

- _ _ - - - _ _ _ _ _ _ _ -

ma nouq'o.,

UNITED STATES

^ ',

NUCLEAR REGULATORY COMMISSION

+

n E

WASHINGTGN, D. C. 20555 g

y*****j 007 29 1987 MEf10RANDUM FOR:

Distribution FR0ti:

Thomas L. King, Acting Chief Advanced Reactor and Generic Issues Branch i

Division of Regulatory Applications Office of Nuclear Regulatory Research

SUBJECT:

MEETING WITH DOE TO REVIEW THE PRA PRESENTED IN THE PRISM PRELIMINARY SAFETY INFORMATION DOCUMENT (PSID) 4 The subject meeting represents the eighth in a series of meetings with DOE and its contractors to discuss NRC comments on the DOE sponsored Power Reactor Inherently Safe Module (PRISM) conce>tual LMR design proposed by General Electric (GE). The meeting will be 1 eld November 4, 1987 in Room P-118 of the Phillips Building in Bethesda, Maryland.

The meeting will begin at 8:30 a.m.

An agenda is enclosed. The meeting will cover Appendix A of the PRISM PSID (Probabilistic Risk Assessment).

Thomas L. King, Acting Chief Advanced Reactor and Generic Issues Division of Regulatory Applications Office of Nuclear Regulatory Research

Enclosure:

As stated

,;jI / g iog y 871029 673 ppg

[ 6 PP0h0SEDAGENDAs ) NPC REVIEW - PRISM PSID, App. A, PRA November 4, 1987 8:30. Status of Conrnission Papers Tom King, NRC l 8:45 Introduction Geza Gyorey, GE - Conceptual Design PRA 9:00 Core Response (Generic) Chuck Mueller,.ANL - Energetics - Coolability '7 - TOP Experience l 10:00 Break 10:15 PRISM Event Tree Models Kamal El Sheikh, GE 10:45 Consequence Analysis Dennis Damon, GE - Containment Res'ponse 'i - Consequence Evaluation i - RISKP Modeling 11:45 Risk Results and Evaluation Kamal El Sheikh, GE 12:15 Lunch 1:00 Discussion of Comments 4:00 Adjourn l i 4 _ _ _ = _ _ _ - _ - -_ -__ - -__ a

1 l [- DISTRIBUTION RES. Circ 4 Chron ARGIB R/F E.: Beckjord - T. Speis-B.. Morris-

2. Rosztoczy T. King i

J. N. Wilson - C. Allen R. Landry M. Dey P. Williams J. Flack B. Hardin

0. Gormley R. Baer N. Anderson i

F. Cherny i S. Shaukat i R. Johnson D. Thatcher J. Hulman L. Soffer J. Read-l D. Cleary R. Kirkwood R. Erickson B. Mendlesohn E. Chelliah L. Beltracchi-J. Cunningham J. Minns M. Spangler M. El-Zeftawy, ACRS/H-1026 PDR - Project 672 Central'Eile.-: Project"6733 i J}}