| Site: | Surry, 07200002 |
| Issue date: | 10/29/1987 |
| From: | Cunningham R NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Barnhart V GENERAL NUCLEAR SYSTEMS, INC. |
| References | |
| REF-PROJ-M-37 NUDOCS 8711030499 | |
| Download: ML20245C748 (2) | |
Text
__ _
p _.... _ _. _.
' cie I.lahrial. '...
l" OCT 2 9 387
!(* -
-NM.
Project M-37 Q. R _.
c.
General Nuclear Systems, Inc.
ATTN: Mr. Victor J. Barnhart President u
'9 1qg 220 Stoneridge Drive Columbia, SC 29210 Gentlemen:
Subject:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By your submittals and affidavits dated June 16, 1987, and June 26, 1987, you submitted the documents listed below and requested that they be withheld from public disclosure pursuant to 10 CFR 2.790.
The documents you requested to be withheld include:
1.
By letter, cask basket design infor: cation: Material properties and test results for Radionox A-18 (x2 Cr Ni L 1911) Used for Dry Spent Fuel Storage Cask CASTOR V/21 Fuel Basket.
2.
Pages 3.2-16 and 3.2-17 and Appendices 1, 3, and 6 of Revision 2A of Topical Safety Analysis Report for the CASTOR V/21 Cask Independent Spent Fuel Storage Installation (Dry Storage) Pages 3.2-16 and 3.2-17, Table 3.2-3,
" Material Properties of the Basket (Radionox A 18)"; Appendix 1, " Parts List and Compilation of Drawings for the CASTOR V/21 Shipping and Storage Cask;" Appendix 3 " Material Specifications for Cask Body (BS 04) - Fuel, Basket (BS 05) - Trunnions, Lids and Bolts for Lids (BS 06) - Bolts (BS-07); and Appendix 6 " Calculation of Fuel - Rod Temperatures in the CASTOR V/21 Cask."
Your reasons for requesting our witholding of this information were set forth in the affidavits citing 10 CFR 2.790(b)(4) regarding the confidentiality in which this information was held and the competitive position and economic damage that could result from its release.
8711030499 873029 DR ADOCK 05000290 p
PDR l-
a y
General Nuclear Systems, Inc.
2 OCT 2 91967 Therefore, the documents listed above, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available
' for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, such as, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Dristnut n m M 7 Leland C. Howo RicfIardE.Cunningham, Director Division of Industrial and Medical Nuclear Safety DISTRIBUTION Please return original concurrence copy to FBrown SS396 Project M-37 NMSS R/F IMIF R/F LCRouse JRoberts FSturz EShomaker, 0GC JSchneider EWBrach OSmith JGray CPatel FBrown GJackson PDR & LPDR Docket 72-2 WHolland,RlII(50-2$0/21)
MYoung, 0GC bec: MSchwartz 8
g MSmith, VEPC0 g
Vgbh ht 9 UFC: IM
- 0GC
- IMS
- IMNS
- IMNS
- b. _____
_$ b. $_.. __.$$_b'.__
______.[._________
DATE:10/$4 87
- 10/fl/87
- 10/M'(/87 :10/,1f/87
- 10/,7//87
/
OFFICIAL RECORD COPY
_ - - _ _ _ _