Summary of 871008 Onsite Const Review W/Doe,State of Co,Task Force & Radiological Assessment Coordinators in Durango,Co Re Whether QA Program Functioning in Manner That Assures Compliance W/Rap & EPA Stds
ML20245C614
Person / Time
Issue date: 10/16/1987
From: Hawkins E, Jacoby D, Olsen T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-WM-48 NUDOCS 8711030213
Download: ML20245C614 (4)


Text

_ - - __ - -

DISTRIBUTION Do.cket File WM-48

PDR/DCS-DBangart, RIV:

WM-48/TT0/0LJ/87/10/14/0 101sen DJacoby LLW Branch, WMLU URF0 r/f OCT l 6198T URF0:TTO:DLJ Docket No. WM-48 MEMORANDUM FOR:

Docket File No. WM-48 FROM:

Dawn L. Jacoby, Project Manager Licensing Branch 1 Uranium Recovery Field Office, Region IV Thomas T. Olsen, Project Manager Licensing Branch 1 Uranium Recovery Field Office, Region IV

SUBJECT:

DURANGO ON-SITE CONSTRUCTION REVIEW

-Date:

October 8, 1987 Location: Durango, Colorado

Participants:

NRC DOE UT Jacoby (URF0)

M. Scoutaris T. Olsen (URF0)

State of Colorado Task Force W. Wright H. Steinhoff RAC J. Powers R. Steele R. Fencil C. Weston S. Martz T. Manschesky M. Doyon l

8711030213 871016 PDR WASTE

"'#8 OFC. :

P0ft NAME :

' DATE :87/10/16 l

e WM-48/TT0/DLJ/87/10/14/0-OCT l 61987

> -)

Purpose:

To conduct'a review of construction activities at the Durango UMTRA Project for assessment of whether the quality control program'is functioning in a manner that assures compliance with the RAP and EPA i

standards.

Entrance Interview Following an introduction of all participants, the NRC staff indicated that the review would consist of a. tour of the site, observation of testing, review of records, and an exit interview.

Jim Powers, the RAC site manager, described the status of remedial action construction and the activities presently in progress, and indicated that he and his QC supervisor (Robert Steele) would not be available to accompany the NRC staff on the site tour due to scheduling problems.

Site Tour The RAC personnel conducted the NRC representatives and the other participants on a tour of the site whenever possible.

Activities observed include the following major work areas:

Placement and compaction of tailings (approximately 300-500 cubic yards).

Excavation and moving of tailings from processing site to disposal site.

Other aspects of the project that were observed include the following:

1.

Observed waste retention ponds, liners, sediment filters, spillways and fencing.

2.

Observed truck spraying and decontamination system.

3.

Observed transport of tailings from processing site to disposal site.

4.

Observed radiological survey stations.

5.

Observed location of monitoring wells at processing site and disposal site.

~0FC :

]

NAME :

DATE :87/10/16 1

a

j i

WM-48/TT0/DLJ/87/10/14/0 OCT 161987 I

Testing Observations-j During the site review,.the staff observed quality control personnel during their performance of field sand cone' testing of placed tailings at the disposal site.

The quality control personnel appear knowledgeable in all aspects of their testing and inspection duties and followed appropriate procedures in performing the tests observed.

l Records Review The staff selectively reviewed testing and daily inspection records and found them to be complete and verified performance _ of construction in accordance with applicable specifications.

Reviews were conducted on the following records:

1.

Gradation tests.

2.

Sand cone tests (147 tests recorded).

3.

Compaction tests (14 compaction tests and 37 1 point tests recorded).

4.

Tailings volume placed (140,000 cubic yards recorded, approximately 5,000 cubic yards per day).

5.

. Survey equipment calibration / frequency (counters, meters and radiological survey instruments).

6.

Staff qualifications.

7.

Soils laboratory apparatus calibration records.

8.

Sand calibration (twice daily).

Resolution of Issues from Previous Site Review There were no previous issues to be resolved.

Exit Interview i

Prior to leaving the site, the NRC staff met with Task Force, State, DOE and RAC personnel to discuss activities observed and findings during the site review.

OFC :

NAME :

DATE :87/10/16

I WM-48/TT0/0LJ/87/10/14/0 00I l 6 l987 Issues There were no issues noted during the review.

/5/

Thomas T. Olsen, Project Manager Licensing Branch 1 Uranium Recovery Field Office Region IV ls)

Dawn L. Jacoby, Project Manager Licensing Branch 1 Uranium Recovery Field Office t

Region IV

}Sl Approved by:

Edward F. Hawkins, Chief Licensing Branch 1 Uranium Recovery Field Office, Region IV l