ML20245C515
| ML20245C515 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 03/17/1989 |
| From: | Swetland P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8904270186 | |
| Download: ML20245C515 (3) | |
Text
.
o a
'j 1
17 MAR 1988 l
No.89-045 i
U.S.' NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
Public Service Electric and Gas Compey 1
Facility:
Hope Creek Generating Station Docket'No:
50-354 Time and Date:
1:00 p.m.,-Wednesday, March 31, 1989 Location:
Region I Office, DRS Conference Room 4
King of Prussia, PA
Purpose:
Requalification Examinations NRC Attendees:
R. Gallo,-Chief, Operations Branch, Division of Reactor Safety (DRS)
E. Wenzinger, Chief, Projects Branch No. 2, Division of Reactor Projects (DRP)
P. Swetland, Chief, Reactor Projects' Section 2B, DRP R. Conte, Chief, BWR Section, DRS T. Walker, Senior Operations Engineer, DRS C. Cisco, Operations Engineer, DRS Licensee Attendees: C. Vondra, Manager of Operations D. Hanson, Manager of Training L. Catalfomo, Assistant Manager of Operations Training W. Gott, Principal Training Supervisor
=
Note:
Attendance by NRC personnel at this meeting should be made known by 1:00 p.m. on March 30, 1989 via a telephone call to T. Walker, Region I, at FTS 8-346-5381 or Commercial 215-337-5381. This is an open meeting.
ORIGINAL SIGMED EY Prepared by:
Paul D. Swetland, Chief, RPS 2B 4
l OFFICIAL RECORD COPY MEETING NOTICE 89-045 - 0001.0.0
- 8904270186 890317 03/16/89 i
\\\\
Distribution:
V.. Stello, Jr., Executive Director for Operations J. M. Taylor,- Deputy Executive Director for Regional Operations B. K. Grimes, Acting Director, Division of Reactor Inspector and Safeguards, NRR J. Lieberman, Director, Office of Enforcement L. J. Chandler, Assistant General Counsel for Enforcement T. E. Murley, Director, Office of Nuclear Reactor Regulation F J. Miraglia, Associate Director for Inspection and Tec.hnical Assessment, NRR D. Crutchfield, Division of Reactor Projects and Special Projects B. Boger, Assistant Director for Region I Reactors, NRR H. Johnson, Regional Coordinator, EDO W. Butler, Director,: Project Directorate I-2, NRR C. Schiraki, Project Manager, NRR Public Docunant Room (PDR) 1.ocal Public Document Roon: (LPDR)
State of New York bec:
Regional Administrator Deputy Regional Administrator Division Directors l
Branch Chiefs Section Chiefs Public Affairs Officer M. Miller Region I Receptionist DRMA Files-DRP Files I.
Bulletin Board M. J. DiDonato i
l RI R.
R M onte Swetland ger brWalker/rh1 C
3//b/89 3/lc/89 3/S/89 3/fg89 0FFICIAL RECORD COPY MEETING NOTICE 89-045 - 0002.0.0 G3/16/89
F AGENDA HOPE CREEK REQUALIFICATION MEETING MARCH 31, 1989 Introduction Opening Remarks Robert M. Gallo, Chief Operations Branch Division of Reactor Safety Richard J. Conte Boiling Water Reactor Section Operations Branch, DRS General Discussion - ES-601 Richard J. Conte Tracy E. Walker Presentation (Optional)
Facility Questions and Answers All Conclusion Robert M. Gallo Richard J. Conte 1
0FFICIAL RECORD COPY MEETING NOTICE 89-045 - 0003.0.0 03/16/89
_ _ -