ML20245C290
From kanterella
Jump to navigation
Jump to search
ML20245C290 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 06/08/1989 |
From: | TENNESSEE VALLEY AUTHORITY |
To: | |
Shared Package | |
ML18033A796 | List: |
References | |
NUDOCS 8906260122 | |
Download: ML20245C290 (401) | |
Similar Documents at Browns Ferry | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML18039A8821999-08-31031 August 1999
[Table view]Increased MSIV Leakage Tech Spec Change Submittal - Seismic Evaluation Rept. ML18039A7761999-04-30030 April 1999 Revised Surveillance Specimen Program Evaluation for TVA Browns Ferry Unit 3. ML18038B9901997-10-31031 October 1997 Bfnp Unit 2 Completion Rept for USI A-46, for Oct 1997 ML18038B8591997-03-31031 March 1997 Completion Rept for USI A-46, for Mar 1997 ML18038B8271997-03-0707 March 1997 Rev 1 to GE-NE-523-B13-01869-032, Evaluation of Indications on Browns Ferry 3 Annulus Core Spray Piping. ML20138P8611997-02-12012 February 1997 Response to Request for Info Re Adequacy & Availability of Design Bases Info ML20138P8571997-02-12012 February 1997 Response to Request for Info Re Adequacy & Availability of Design Bases Info ML20132B7801996-11-12012 November 1996 Engineering Rept for Safety/ Relief Valves Safety Function Lift Setpoint Tolerence Relaxation Summary Rept ML18038B9291996-06-30030 June 1996 Rev 0 of Plant,Unit 3:Probabilistic Safety Assessment W/ Unit 2 Operating. ML20115A8011996-06-25025 June 1996 Rev 0 to Relay Evaluation Rept for USI A-46 & Ipeee ML18038B9281996-05-31031 May 1996 Rev 1 of Plant,Unit 2:Probabilistic Safety Assessment W/ Unit 3 Operating. ML20094G9781995-11-30030 November 1995 Evaluation to Determine Limiting Operating Condition in BFN III RPV Flaw Handbook ML18038B4811995-06-30030 June 1995 Brown Ferry Steam Electric Station Unit 2 Vessel Surveillance Matls Testing & Fracture Toughness Analysis. ML18038B3371995-06-23023 June 1995 SWS Operational Performance Insp (Swsopi) Browns Ferry Nuclear Plant. ML18038B2431995-04-0808 April 1995 Multi-Unit Pra. W/6 Oversize Encl ML18037A4461993-03-12012 March 1993 Proposed Tech Spec Amend Diesel Generator Maint Insp Frequency Change Engineering Evaluation Rept. ML20086N8271991-12-13013 December 1991 Training Dept Initial Simulator Certification ML20072R2401991-01-16016 January 1991 Operational Readiness Review Rept,Final Phase ML20059L5771990-09-30030 September 1990 Rev 2 to Browns Ferry Nuclear Plant Cable Issues Supplemental Rept Corrective Actions ML20064B4191990-09-30030 September 1990 Rev 3 to Cable Issues Supplemental Rept Corrective Actions ML20058C7101990-09-10010 September 1990 Response to Operational Readiness Review Phase Two Rept ML18033B0851989-11-30030 November 1989 Rev 3 to Electrical Cable Separations Rept, Clarifying Pages 4 & 35a of Rept ML19327B4581989-10-0606 October 1989 Rev 2 to Electrical Cable Separations Rept. ML19325C4121989-09-15015 September 1989 Seismic Assessment of Browns Ferry 2 Reactor Vessel & Internals. ML20245H3481989-08-31031 August 1989 Evaluation of Browns Ferry Nuclear Unit 2 Instrument Sense Line Issues ML20245G0651989-06-0909 June 1989 Operational Readiness Review Interim Rept,Browns Ferry Unit 2 ML20245C2901989-06-0808 June 1989 Rev 3 to Cable Issues Walkdown Rept ML20244B9211989-05-26026 May 1989 Rev 1 to Electrical Cable Separations Rept ML20245A9131989-04-13013 April 1989 Rev 2 to Test to Determine Ampacity De-Rating Effects of Cable Coatings & to Confirm Principle of Load Diversity ML20245C2751989-03-22022 March 1989 Rev 1 to Mar 1989 Evaluation of Browns Ferry Nuclear Plant Cable Installation Concerns, Summary Rept ML20247A5581989-03-0101 March 1989 Rev 1,Vol V to TVA Welding Project Browns Ferry Phase II Review ML20248H2351989-02-14014 February 1989 Vol 1,to Engineering Evaluations in Support of 10CFR50 App R Submittal for Browns Ferry Nuclear Power Plant ML20153G8081988-08-31031 August 1988 Mgt Self-Assessment (MSA) of Readiness for Restart ML20245B4181988-08-17017 August 1988 Investigation Rept,Design & Operation of Sampling Sys for Analysis of High Purity Water ML20151E7231988-06-30030 June 1988 Evaluation of Browns Ferry Nuclear Plant Cable Installation Concerns ML20235E3471988-03-26026 March 1988 Rev 7 to TVA Employee Concerns Special Program Subcategory Rept 80300, QA Personnel, Consisting of Vol 8, QA Category ML20235E3141988-03-18018 March 1988 Rev 6 to TVA Employee Concerns Special Program Subcategory Rept 80200, Insp, Consisting of Vol 8, QA Category ML20235E3591988-03-11011 March 1988 Rev 6 to TVA Employee Concerns Special Program Subcategory Rept 80400, Nonconformance Control & Corrective Action, Consisting of Vol 8, QA Category ML20235E3771988-03-10010 March 1988 Rev 4 to TVA Employee Concerns Special Program Subcategory Rept 80500, Document Control & Records, Consisting of Vol 8, QA Category ML20235E3031988-03-0909 March 1988 Rev 6 to TVA Employee Concerns Special Program Subcategory Rept 80600, General Mgt & Policy, Consisting of Vol 8, QA Category ML20235E1911988-02-18018 February 1988 Rev 6 to TVA Employee Concerns Special Program Subcategory Rept 71500, Employee Programs, Consisting of Vol 7, Mgt & Personnel Category ML20235E2501988-02-18018 February 1988 Rev 5 to TVA Employee Concerns Special Program Subcategory Rept 71600, Labor Relations, Consisting of Vol 7, Mgt & Personnel Category ML20235D7991988-02-18018 February 1988 Rev 5 to TVA Employee Concerns Special Program Subcategory Rept 71000, Productivity, Consisting of Vol 7, Mgt & Personnel Category ML20235D7551988-02-17017 February 1988 Rev 4 to TVA Employee Concerns Special Program Subcategory Rept 71800, Employment, Consisting of Vol 7, Mgt & Personnel Category ML20238E5081987-12-31031 December 1987 Rept of Pipe Insps,Corrective Actions & Analyses,Browns Ferry Nuclear Plant,Unit 2,Cycle 5 Outage ML20238E5481987-12-31031 December 1987 Safe End Replacement:Util Perspective ML20235B8171987-12-22022 December 1987 Rev 3 to TVA Employee Concerns Special Program Subcategory Rept 20400, Engineering Organization & Operating Procedures, Consisting of Vol 2, Engineering Category ML20215H2871987-12-0707 December 1987 Investigation of Problems Concerning Category I Supports at Browns Ferry Nuclear Plant. Updated Data Sheets Reflecting Any Rept Recommendations Encl ML20235D8481987-12-0303 December 1987 Rev 4 to TVA Employee Concerns Special Program Subcategory Rept 71100, Matls, Consisting of Vol 7, Mgt & Personnel Category ML20147J3141987-11-21021 November 1987 Vol V to, Welding Project Browns Ferry Nuclear Plant Phase II Review 1999-08-31 Category:TEXT-SAFETY REPORT MONTHYEARML18039A9041999-10-15015 October 1999
[Table view]LER 99-010-00:on 990917,automatic Reactor Scram on Turbine Stop Valve Closure Occurred.Caused by High Water Level in Main Steam Moisture Separator 2C2.Unit 2C2 Reservoir Level Transmitter & Relays Were Replaced & Tested Satisfactorily ML18039A8981999-10-14014 October 1999 LER 99-009-00:on 990915,manual Reactor Scram Was Noted Due to EHC Leak.Caused by Failure of Stainles Steel Tubing Connection.Removed Damaged Tubing & Connection Plug ML18039A8951999-10-0808 October 1999 LER 99-008-00:on 990905,HPCI Was Inoperable Due to Failed Flow Controller.Caused by Premature Failure of Capacitor 2C3.Replaced Controller & HPCI Sys Was Run IAW Sys Operating Instructions ML18039A8751999-09-30030 September 1999 LER 99-005-00:on 990901,SR for Standby Liquid Control Sampling Was Not Met.Caused by Deficient Procedure for Chemical Addition to Standby Liquid Control.Revised Procedure.With 990930 Ltr ML20217F9671999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20212G2241999-09-27027 September 1999 Safety Evaluation Supporting Amend 221 to License DPR-68 ML20212E6341999-09-23023 September 1999 Suppl to SE Resolving Error in Original 990802 Se,Clarifying Fact That Licensee Has Not Committed to Retain Those Specific Compensatory Measures That Were Applied to one-time Extension ML20212D3831999-09-20020 September 1999 Safety Evaluation Supporting Proposed Rev to Withdrawal Schedule for First & Third Surveillance Capsules for BFN-3 RPV ML20212B8561999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Browns Ferry Nuclear Plant.With ML18039A8821999-08-31031 August 1999 Increased MSIV Leakage Tech Spec Change Submittal - Seismic Evaluation Rept. ML18039A8391999-08-0606 August 1999 BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts. ML20210N1221999-08-0202 August 1999 Safety Evaluation Accepting Licensee Request for Relief from ASME B&PV Code,Section XI Requirements.Request 3-ISI-7, Pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210R0931999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A8201999-07-26026 July 1999 LER 99-004-00:on 990625,facility Core Spray Divisions I & II Inoperable at Same Time Due to Personnel Error.Electrical Supply Breaker to Core Spray Division II Pump 3B Returned to Normal Racked in Position ML18039A8171999-07-20020 July 1999 LER 99-007-00:on 990623,discovered That SR for Monitoring of Primary Containment Oxygen Concentration Had Not Been Met. Caused by Failure of Operators to Adequately Communicate. Required Surveillances Were Performed.With 990720 Ltr ML18039A8161999-07-19019 July 1999 LER 99-006-00:on 990618,noted That Main Steam SRV Exceeded TS Setpoint Tolerance.Caused by Pilot Vlve disc-seat Bonding.Util Replaced All 13 SRV Pilot Cartridges with Cartridges Certified to Be Witin +/-1%.With 990719 Ltr ML20209J0771999-07-16016 July 1999 Safety Evaluation Concluding That Licensee Provided Adequate Information to Resolve ampacity-related Points of Concern Raised in GL 92-08 for BFN & That No Outstanding Issues Re GL 92-08 Ampacity Issues for Browns Ferry NPP Exist ML18039A8121999-07-12012 July 1999 LER 99-005-00:on 990617,ESF Actuation & HPCI Declared Inoperable.Caused by Personnel Error.Reset HPCI & Returned Sys to Operable Status with 25 Minutes.With 990712 Ltr ML20209H4381999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A8101999-06-28028 June 1999 LER 99-004-00:on 990530,safety Features Sys Actuations Occurred Due to RPS Trip.Caused by Failure of MG Set AC Drive Motor Starter Contractor Coil.Licensee Placed 2B RPS Bus on Alternate Feed & Half Scram Was Reset ML20196F8811999-06-23023 June 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves ML18039A8071999-06-14014 June 1999 LER 99-003-00:on 990515,automatic Reactor Scram Due to Turbine Trip Was Noted.Caused by Failure of Mechanical Trip Cylinder to Latch When Hydraulically Reset.Operations Crew Stabilized Reactor Following Scram ML18039A8021999-06-14014 June 1999 LER 99-002-00:on 990501,SRs for Single CR Withdrawal During Cold SD Were Not Adequately Implemented.Caused by Procedural Inadequacy.Revised Applicable Plant Surveillances.With 990614 Ltr ML18039A8011999-06-14014 June 1999 LER 99-001-00:on 990515,automatic Reactor Scram Occurred Due to Tt.Caused by Failure of Mechanical Trip Cylinder to Latch When Hydraulically Reset.Operations Crew Stabilized Reactor Following Scram.With 990614 Ltr ML20196B8051999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A7791999-05-0606 May 1999 LER 99-003-00:on 990408,declared Plant HPCI Sys Inoperable Due to Loose Wire.Caused by Failure to Properly Tighten Screw at Some Time in Past.Loose Wire Was Tightened ML18039A7761999-04-30030 April 1999 Revised Surveillance Specimen Program Evaluation for TVA Browns Ferry Unit 3. ML20206R0731999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Bfnp.With ML18039A7561999-04-23023 April 1999 Bfnp Risk-Informed Inservice Insp (RI-ISI) Program Submittal. ML18039A7671999-04-0808 April 1999 Rev 0 to TVA-COLR-BF2C11, Browns Ferry Nuclear Plant Unit 2 Cycle 11 Colr. ML18039A7461999-04-0707 April 1999 LER 99-001-00:on 990308,determined That Two Trains of Standby Gas Treatment (SGT) Were Inoperable.Caused by Trip C SGT Blower Motor Breaker.Initiated Shutdown of Plant,Reset C SGT Blower Motor Breaker & Declared Train Operable ML20205F9341999-04-0101 April 1999 Safety Evaluation Authorizing Licensee 990108 Relief Request PV-38,from Requirements of ASME BPV Code Section XI IST Testing,Valve Program for Plant,Units 1,2 & 3 ML20205N8341999-04-0101 April 1999 Part 21 Rept Re Automatic Switch Co Nuclear Grade Series X206380 & X206832 Solenoid Valves Ordered Without Lubricants That Were Shipped with Std Lubrication to PECO & Tva.Affected Plants Were Notified ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205T5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bfnp.With ML20205S0661999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with No Status Change from Previous Update,990331, Atlas Corp ML18039A7361999-03-11011 March 1999 Rev 4 to TVA-COLR-BF2C10, Bfnp,Unit 2,Cycle 10 Colr. ML20204C7891999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A6951999-02-19019 February 1999 LER 99-002-00:on 990122,LCO Was Not Entered During Calibration Testing of 3D 480 Volt Rmov Board.Caused by Personnel Error.Tva Has Briefed Operations Personnel to Preclude Recurrence of Event.With 990219 Ltr 05000259/LER-1999-001-01, :on 990115,inoperable CR Emergency Ventilation Sys During Post Maint Testing Was Noted.Caused by Failure of Procedure Writers & Reviewers.Returned a Crev to Operable State & Revised B Crev Train Procedures.With1999-02-12012 February 1999
ML18039A6871999-02-12012 February 1999 LER 99-001-00:on 990114,Unit 3 HPCI Was Noted Inoperable. Caused by Oil Leak on Stop Valve.Corrective Maint Was Performed to Repair Oil Leak.With 990212 Ltr ML18039A6941999-02-0303 February 1999 Rev 1 to TVA-COLR-BF3C9, Bfnp Unit 3 Cycle 9 Colr. ML18039A6931999-02-0303 February 1999 Rev 3 to TVA-COLR-BF2C10, Bfnp Unit 2 Cycle 10 Colr. ML18039A6671998-12-31031 December 1998 LER 98-004-00:on 981202,SR Intent Was Not Adequately Implemented.Caused by Procedural Inadequacy.Revised Procedures to Provide Proper SR Implementation.With 981231 Ltr ML18039A6661998-12-31031 December 1998 Ro:On 981215,HRPCRM 2-RM-90-273C Was Declared Inoperable. Caused by Downscale Indication.Containment RM Will Be Utilized as Planned Alternate Method of Monitoring Until Hrpcrm 2-RM-90-273C Can Be Returned to Operable Status ML20199F2721998-12-31031 December 1998 ISI Summary Rept (NIS-1), for BFN Unit 3,Cycle 8 Operation ML20199K8951998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Browns Ferry Nuclear Plant.With ML18039A6471998-12-15015 December 1998 LER 98-007-00:on 981116,unplanned ESF Following Loss of 4kV Unit Board 3B Occurred.Caused by Temporary Energization of Lockout Relay on 4kV Unit Board 3B When Resistor on Relay Monitoring Lamp Circuit Shorted.Replaced Resistor ML18039A6371998-12-0707 December 1998 LER 98-006-00:on 981116,MSSR Valves Exceeded TS Setpoint Tolerance.Caused by Pilot Valve Disc/Seat Bonding. Installed SRV Pressure Switches During Unit 3,cycle 8 Outage.With 981207 Ltr ML20199F2791998-12-0303 December 1998 Bfnp Unit 3 Cycle 8 ASME Section XI NIS-2 Data Rept 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20245C290&oldid=3912310"