Text
l
,\\,
UNITED STATES
[
(
g NUCLEAR REGULATORY COMMISSION 3
-l WASHINGTON. D. C. 20555
%.'.... f PHILADELPHIA ELECTRIC COMPANY DOCKET NO. 50-352 LIMERICK GENERATING STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 24 License No. NPF-39 1.
The Nuclear Regulatory Commission (the Comission) has found that A.
The application for amendment by Philadelphia Electric Company (the licensee) dated April 10, 1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the
(
Comission; C.
There is reasonable assurance (i) that the' activities authorized by this amer.dment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health end safety of the public; and j
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have i
l been satisfied.
I 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-39 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 24, are hereby incorporated into this license. Philadelphia Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
I i
l l
8906260099 890615 PDR ADOCK 05000352 l
P PDC l
-___.-____.___._.___.._._._,___-____m__2
e 3.
lThis license amendment is effective upon issuance of an operating license to Limerick Generating Statior,. Unit No. 2.
FOR THE NUCLEAR REGULATORY COMMISSION
./s/-
Walter R. Butler, Director-Project Directorate I-2 Division.of Reactor Projects..I/II
Attachment:
Changes to the. Technical Specifications Date of Issuance:
June 15,1989 h
PDI-2/LA k
PDI-2/P OGCha PDI-2/D M0'Brien tier:mr RClar WButler
/ /89 4/O 89 g /gp/89 f/B /89 ( / g/89
'I 3.
This license amendment is effective upon issuance of an opertting license.
.i to Limerick Generating Station, Unit No. 2..
FOR THE NUCLEAR REGULATORY COMMISSION.
k _U D '
$YL.
Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II
Attachment:
Changes to the Technical' Specifications Date of Issuance: June 15,1989 f
ATTACHMENT TO LICENSE AMENDMENT NO.
24 FACILITI OPERATING LICENSE NO. NPF-39 DOCKET NO. 50-352 Replace the follnwing pages of the Appendix A Technical Specifications with.
the' attached'pages. The revised.pages are identified by Amendment number and contain vertical. lines indicating the area of change.
Remove Insert' 3/4 8-15 3/4 8-15 3/4 8-16 3/4 8-16' 3/4 8-16a 3/4 8-17 3/4 8-17 3/4 8-18 3/4 8-18 3/4 8-18a 3/4 8-19 3/4 8-19 3/4 8-20 3/4 8-20 i
1
'I l
L n;
}
1
- ELECTRICAL POWER SYSTEMS 3/4.8.h ONSITE POWER DISTRIBUTION SYSTEMS DISTRIBUTION - OPCRATING LIMITING CONDITION FOR OPERATION 3.8.3.1 The following power distribution system divisions shall be energized:
i a.
A.C. power distribution.
1.
Unit 1 Division 1, Consisting of:
l a) 4160-VAC Bus:
D11 (10A115).
j b) 480 VAC Load Center:
0114 (108201) i c) 480-VAC Motor Control Centers:
0114-R-C1 (108219)
D114-R-C (10B213)
I D114-R-G (108211)
D114-R-G1 (10B215) 0114-D-G (108515) d)
120-VAC Distribution Panels:
10Y101 10Y206 1
2.
Vt 2 Division 2, Consisting of:
l a) 4160-VAC Bus:
012 (10A116) b)
480-VAC Load Center:
0124 (10B202) c)
480-VAC Motor Control Centers:
D124-R-C1 (108220) 0124-R-C (10B214)
D124-R-G (108212) 0124-R-G1 (108216) 0124-D-G (10B516) d)
120-VAC Distribution Panels:
10Y102
)
10Y207 I
i 3.
Unit 1 Division 3, Consisting of:
I a) 4160-VAC Bus:
D13 (10A117) b)
480-VAC Load Center:
D134 (108203) c)
480-VAC Motor Control C iters:
0134-R-H1 (10B221) 0134-R-H (108217) 1 0134-R-E (108223) 0134-C-B (008131)
I D134-D-G (10B517)
Si d) 120-VAC Distribution Panels:
10Y103 l
10Y163 4.
Unit 1 Division 4, Consisting of:
l l
a) 4160-VAC Bus:
D14 (10A118) b)
480-VAC Load Center:
0144 (10B204)
I LIMERICK - UNIT 1 3/4 8-15 Amendment No. 24
-________.__._m_._____._m-_--_..______-_.___.__.m s
5
ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued) c)
480-VAC Motor Control Centers:
0144-R-G (108222)
D144-R-H (108218) 0144-R-E (10B224) 0144-C-B (00B132)
D144-D-G (108518) d)
120-VAC Distribution Panels:
10Y104 10Y164 5.
Unit 2 and Common Division 1, Consisting of:
a) 4160-VAC bus:
021 (20A115) b)
480-VAC load center:
D214 (20B201) c)
480-VAC motor control centers:
D114-S-L (008519)
D214-R-C (20B213)
D214-D-G (2nB515) d)
120-VAC distribution panels:
01Y501 20Y101 20Y206 6.
Unit 2 and Common Division 2, Consisting of:
a) 4160-VAC bus:
022 (20A116),-
b) 480-VAC load center:
D224 (208202) c)
480-VAC motor control centers:
0124-5-L (000520) 0224-D-G (20B516) d)
3?0-VAC distribution panels:
02Y501 l
20Y102 l
20Y207 7.
Unit 2 and Common Division 3, Consisting of:
a) 4160-VAC bus:
023 (20A117) b)
480-VAC load center:
D234 (20B203) c)
480-VAC motor control centers:
D234-5-L (008521)
D234-D-G (20B517) d)
120-VAC distribution panels:
03YS01 20Y103 20Y163 8.'gp2 Unit 2 and Common Division 4, Consisting of:
a) 4160-VAC bus:
024 (20A118) b)
480-VAC load center:
0224 (20B204) c)
480-VAC motc. control centers:
D244-5-L (008522)
D244-D-G (20B518) d)
120-VAC distribution panels:
04Y501 20Y104 20Y164 LIMERICK - UNIT 1 3/4 8-16 Amendment No. 24
_-____-_-____x
i
.ELECTRlCAL POWER SYSTEMS LIMITING CONDITION.FOR OPERATION (Continued) b.
'D.C. Power Distribution Panels 1.
Unit 1 Division 1, Consisting of:
.l a) 250-V DC Fuse Box:
1FA (1AD105) b)
250-V DC Motor Control. Centers:
10A (100201) c)
125-V DC Distribution Panels:
IPPAl-(1AD102)
IPPA2
-(1AD501).
1 PPA 3 (1AD162)-
2.
Unit 1-Division 2, Consisting of:
l a) 250-V DC Fuse Box:
1FB (180105) b)
250-V DC Motor Control Centers:
10B-1 (100202) 10B-2 (100203) c)
125-V DC Distribution Panels:
1 PPB 1 (18D102)
IPPB2 (18D501) 1 PPB 3 (180162) 3.
Unit 1 Division 3, Consisting of:
l a) 125-V DC Fuse Box:
1FC (ICD 105) b)
125-V DC Distribution Panels:
1PPC1 (1C0102) 1PPC2 (ICD 501) -
1PPC3 (ICD 162)'
4.
Unit 1 Division 4, Consisting of:
l a) 125-9 DC Fuse Box:
1FD (100105) b)
125-V DC Distribution Panels:
1 PPD 1 (1D0102) 1 PPD 2 (100501) i 1 PPD 3 (100162) d 5.
Unit 2 and Comon Division 1, Consisting of:
l 1
a) 250-V DC Fuse Box:
2FA (2AD105) i b) 125-V DC Distribution Panels:
2 PPA 1 (2AD102) 2 PPA 2 (2A0501) j 6.
Unit 2 and Comon Division 2, Consisting of:
I a) 250-V DC Fuse Box:
2FB (2BD105) i b) 125-V DC Distribution Panels:
2PPBl.
(280102) 2 PPB 2 (2B0501) 7.
Unit 2 and Comon Division 3, Consisting of:
a) 250-V DC Fuse Box:
2FC (200105) b)
125 V DC Distribution panels; 2PPC1 (200102) 2PPC2.
(200501) 8.
Unit 2 and Comon Division 4. Consisting of:
a) 250-V DC Fuse Box:
2FD (200105) b)
125-V DC Distribution Panels:
2 PPD 1 (2DD102) 2 PPD 2 (200501) l LIMERICK - UNIT 1 3/4 8-16e Amendment No. 24 L
ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)
APPLICABILITY:
OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
With one of the above required Unit 1 A.C. distribution system i
a.
divisions not energized, reenergize the division within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.
With one of the above required Unit 1 D.C. distribution systcm l
divisions not energized, reenergize the division within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
With any of the above required Unit 2 and common AC and/or DC c.
distribution system divisions not energized, declare the associated common equipment inoperable, and take the appropriate ACTION for that system.
SURVEILLANCE REQUIREMENTS 4.8.3.1 Each of the above required power distribution system divisions shall be determined energized at least once per 7 days by verifying correct breaker alignment and '/oltage on the busses /MCCs/ panels.
l l
i l
l LIMERICK - UNIT 1 3/4 8-17 Amendment No. 24 t
ns
ELECTRICAL POWER SYSTEMS 4
DISTRIBUTION - SHUTDOWN y
LIMITING CONDITION FOR OPERATION 3.8.3.2 As a minimum, 2 of the 4 divisions of the power distribution system shall be energized with; a.
A.C. power distribution:
1.
Unit 1 Division 1, Consisting of:
a) 4160-VAC Bus:
D11 (10A115) b)
480-VAC Load Center:
0114 (10B201) c)
480-VAC Motor Control Centers:
0114-R-C1 (108219)
D114-R-C (10B213) 0114-R-G (10B211)
I D114-R-G1 (108215)
D114-D-G (108515) d)
120-VAC Distribution P 'els:
10Y101 10Y206 2.
Unit 1 Division 2, Consisting of:
l a) 4160-VAC Bus:
012 (10A116) b)
480-VAC Load Center:
0124 (10B202) c)
480-VAC Motor Control Centers:
0124-R-C1 (10B220) 0124-R-C (10B214)
D124-R-G (108212) l D124-R-G1 (108216) 0124-D-G (108516) d)
120-VAC Distribution Panels:
10Y102 10Y207 3.
Unit 1 Division 3, Consisting of:
l a) 4160-VAC Bus:
013 (10A117) b)
480-VAC Load Center:
0134 (10B203) c)
4BO-VAC Motor Control Centers:
0134-R-H1 (10B221) 0134-R-H (108217) 0134-R-E (108223) 0134-C-8 (008131) 0134-0-G (10B517) d)
120-VAC Distribution Panels:
10Y103 10Y163 l
4.
Unit 1 Division 4, Consisting of:
I a) 4150-VAC Bus:
014 (10A118) l b) 480-VAC Load Center:
D144 (108204)
LIMERICK - UNIT 1 3/4 8-18 Amendment No. 24
ELECTRXCAL POWER SYSTEMS LIMITING CONDITION _FOR OPERATION (Continued) c)
480-VAC Motor Control Centers:
0144-R-G (108222) 0144-R-H (10B218) 0144-R-E (108224) 0144-C-B (00B132) 0144-0-G (10B518) {
d) 120-VAC Distribution Panels:
10fl04 10Y164 1
5.
Unit 2 and Common Division 1, Consisting of:
a) 4160-VAC Bus:
021 (20A115) b)
480-VAC Load Center:
0214 (208201) c)
480-VAC Motor Control Centers:
0114-S-L (008519) 7 0214-R-C (20B213) 0214-0-G (20B515) d)
120-VAC Distribution Panels:
01Y501 20Y101 20Y206 I
6.
Unit 2 and Common Division 2, Consisting of:
a.
4160-VAC Bus:
022 (20A116),
b.
480-VAC Load Center:
0224 (208202)'
c.
480-VAC Motor Control Centers:
0124-5-L (008520) 0224-0-G (208516) d.
120-VAC Distribution Panels:
02Y501 20Y102 20Y207 7.
Unit 2 and Common Divison 3, Consisting of:
a.
4160-VAC Bus:
023 (20A117) b.
480-VAC Load Center:
0234 (20B203) c.
480-VAC Motor Control Centers:
0234-5-L (008521) 0234-0-G (20B517) d.
120-VAC Distribution Panels:
03Y501 20Y103 l
20Y163 l
8.
Unit 2 and Common Divison 4, Consisting of:
a.
4160-VAC Bus:
024 (20A118) b.
480-VAC Load Center:
0224 (20B204) c.
480-VAC Motor Control Centers:
0244-5-L (00B522) l 0244-0-G (20B518) i i
d.
120-VAC Distribution Panels:
04Y501 l
20Y104
{
20Y164 j
l LIMERICK - UNIT 1 3/4 8-18a Amendment No. 24
~1 3-l 1
ELECTRICAL POWER SYSTEMS-I
)
LIMITING CONDITION FOR OPERATION (Continued) b.
D.C. power distribution:
A i
1.
U. nit 1 Division 1, Consisting of:
l l
a) 250-V DC Fuse Box:
1FA (1AD105) l b) 250-V DC Motor Control Center:
'1DA (100201) c)
125-V DC Distribution Panels:
1 PPA 1 (1AD102).
]
1 PPA 2 (1AD501) i IPPA3 (1AD162)'
2.
Unit 1 Division 2, Consisting of:
l l
a) 250-V DC Fuse Box:
1FB (1BD105) b)
250-V DC Motor Control Centers:
108-1 (10D202) i 108-2 (10D203) c)
125-V DC Distribution Panels:
1 PPB 1 (18D102) j IPPB2
- (180501) 1 PPB 3 (180162) i 3.
Unit 1 Divis on 3, Consisting of:
l I
a) 125-V DC Fuse Box:
1FC (1C0105)'
b) 125-V DC Distribution Panels:
IPPC1 (1CD102)
{
1PPC2 (1C0501) i 1PPC3 (ICD 162) 4.
Unit 1 Division 4, Consisting of:
j a) 125-V DC Fuse Box:
1FD (100105) l b) 125-V DC Distribution Panels:
1 PPD 1 (10D102) i IPPD2 (1DD501) 1 PPD 3 (100162) 5.
Unit 2 and Comon Division 1, Cunsisting of:
a) 250-V DC Fuse Box:
2FA (2AD105) b)
125-V DC Distribution Panels:
2 PPA 1 (2AD102).
2 PPA 2 (2A0501) 6.
l Unit 2 and Comon Division 2, Consisting of:
l a) 250-V DC Fuse Box:
2FB (2B0105) i b) 125-V DC Distribution Panels:
2 PPB 1 (28D102) 2 PPB 2 (2B0501) 7.
Unit 2 and Comon Division 3, Consisting of:
a) 250-V DC Fuse Box:
2FC (200105) b)
125-V DC Distribution Panels:
2PPCI (200102) 2PPC2 (200501) 8.
Unit 2 and Comon Division 4, Consisting of:
a) 250-V DC Fuse Box:
2FD (200105).
b) 125-V DC Distribution Panels:
2 PPD 1 (200102) 2 PPD 2 (200501)
LIMERICK - UNIT 1 3/4 8-19 Amendment No. 24 C-l
l ELECTRICAL POWER SYSTEMS LIMITING CONDITION JOR OPERATION (Continued)
APPLICABILITY:
OPERATIONAL CONDITIONS 4, 5, and *.
ACTION:
With less than two. divisions of the above required Unit 1 A.C. dis-a.
tribution' systems energized, suspend CCRE ALTERATIONS, handling of=
irradiated fuel in the secondary containment and operations with a potential for draining the reactor vessel.
b.
With less than two-divisions of the above required Unit 1 0.C. dis-
.tribution systems energized, suspend CORE ALTERATIONS, handling of-irradiated fuel in the secondary containment and operations with a j
potential for draining the reactor vessel.
l l
With any of the above' required Unit 2 and common AC and/or DC c.
distribution system divisions not energized, declare the associated common equipment inoperable, and take the appropriate ACTION for that system.
d.
The provisions of Specification 3.0.3 are not applicable.
l-SURVEILLANCE REQUIREMENTS 1
4.8.3.2 At least the above required power. distribution system divisions shall be determined energized at least once per 7 days by verifying correct breaker alignment and voltage on the busses /MCCs/ panels.
1 I
- When handling irradiated fuel in the secondary containment.
LIMERICK - UNIT 1 3/4 8-20 Amendment No. 24
(