ML20245B408
ML20245B408 | |
Person / Time | |
---|---|
Site: | Browns Ferry, Sequoyah, 05000000 |
Issue date: | 03/10/1989 |
From: | Buggs E AFFILIATION NOT ASSIGNED |
To: | Partlow J Office of Nuclear Reactor Regulation |
Shared Package | |
ML20245B391 | List: |
References | |
NUDOCS 8906230162 | |
Download: ML20245B408 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M4461999-10-20020 October 1999
[Table view]Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20217J4151999-10-15015 October 1999 Forwards Request for Addl Info Re Util 990624 Application for Amend of TSs That Would Revise TS for Weighing of Ice Condenser Ice Baskets 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML18039A9021999-10-15015 October 1999 Forwards LER 99-010-00 Re Occurrence of Plant Reactor Scram Due to Main Turbine Trip Which Resulted in Main Steam Moisture Separator.All Plant Safety Systems Operated as Designed in Response to Event ML18039A8961999-10-14014 October 1999 Forwards LER 99-009-00,re Manual Reactor Scram on Unit 2 from 54% Power,Iaw 10CFR50.73(a)(2)(iv).All Plant Safety Sys Operated as Designed in Response to Event ML20217E0711999-10-14014 October 1999 Grants Approval for Util to Submit Original,One Signed Paper Copy & Six CD-ROM Copies of Updates to FSAR as Listed,Per 10CFR50.4(c),in Response to ML20217F7751999-10-0808 October 1999 Confirms 991006 Telcon Between T Abney of Licensee Staff & a Belisle of NRC Re Meeting to Be Conducted on 991109 in Atlanta,Ga to Discuss Various Maintenance Issues ML20217D3261999-10-0808 October 1999 Responds to Re Event Concerning Spent Fuel Pool Water Temperature Being Undetected for Approx Two Days at Browns Ferry Unit 3 ML18039A8931999-10-0808 October 1999 Forwards LER 99-008-00,concerning HPCI Sys Being Declared Inoperable,Iaw 10CFR50.73(a)(2)(v).There Are No Commitments Contained in Ltr ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. ML20217G1141999-10-0707 October 1999 Responds to from P Salas,Providing Response to NRC Risk Determination Associated with 990630 Flooding Event at Sequoyah Facility.Meeting to Discuss Risk Determination Issues Scheduled for 991021 in Atlanta,Ga ML20217B2981999-10-0606 October 1999 Discusses Closeout of GL 92-01,rev 1,suppl 1, Reactor Vessel Integrity, for Sequoyah Nuclear Plant,Units 1 & 2. NRC Also Hereby Solicits Any Written Comments That TVA May Have on Current Rvid Data by 991101 ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams ML20212J5981999-10-0101 October 1999 Forwards SE Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plnat,Unit 1 ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR IR 05000327/19990041999-10-0101 October 1999 Ack Receipt of Providing Comments on Insp Repts 50-327/99-04 & 50-328/99-04.NRC Considered Comments for Apparent Violation Involving 10CFR50.59 Issue ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212M1481999-09-28028 September 1999 Refers to Management Meeting Conducted on 990927 at Region II for Presentation of Recent Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20217A9451999-09-27027 September 1999 Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation ML20212F4501999-09-23023 September 1999 Forwards Amends 246 & 237 to Licenses DPR-77 & DPR-79, Respectively & Ser.Amends Approve Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20212F0751999-09-23023 September 1999 Forwards SER Granting Util 981021 Request for Relief from ASME Code,Section XI Requirements from Certain Inservice Insp at Sequoyah Nuclear Power Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML20212M1911999-09-21021 September 1999 Discusses Exercise of Enforcement Discretion Re Apparent Violation Noted in Insp Repts 50-327/99-04 & 50-328/99-04 Associated with Implementation of Procedural Changes Which Resulted in Three Containment Penetrations Being Left Open ML20212D3651999-09-20020 September 1999 Forwards SE Accepting Licensee 990430 Proposed Rev to Plant, Unit 3 Matl Surveillance Program ML20211Q0311999-09-10010 September 1999 Requests Written Documentation from TVA to Provide Technical Assistance to Region II Re TS Compliance & Ice Condenser Maint Practices at Plant ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util 981023 Ltr.Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20216F5441999-09-0707 September 1999 Provides Results of Risk Evaluation of 990630,flooding Event at Sequoyah 1 & 2 Reactor Facilities.Event Was Documented in Insp Rept 50-327/99-04 & 50-328/99-04 & Transmitted in Ltr, ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211G5881999-08-27027 August 1999 Submits Summary of 990820 Management Meeting Re Plant Performance.List of Attendees & Matl Used in Presentation Enclosed ML20211G6491999-08-26026 August 1999 Confirms Telcon with T Abney on 990824 Re Mgt Meeting Which Has Been re-scheduled from 990830-0927.Purpose of Meeting to Discuss BFN Status & Performance ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20210V1471999-08-13013 August 1999 Forwards Insp Repts 50-327/99-04 & 50-328/99-04 on 990601- 0717.One Potentially Safety Significant Issue Identified.On 990630,inadequate Performance of Storm Drain Sys Caused Water from Heavy Rainfall to Backup & Flood Turbine Bldg ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML20210Q4421999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit Ltr with List of Individuals to Take exam,30 Days Before Exam Date ML20210Q5011999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Sequoyah Nuclear Plant. Sample Registration Ltr Encl ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210N1051999-08-0202 August 1999 Forwards SE Accepting Licensee 990326 Request for Relief from ASME B&PV Code,Section XI Requirements.Request for Relief 3-ISI-7,pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20210G8991999-07-28028 July 1999 Discusses 990726 Open Mgt Meeting for Discussion on Plant Engineering Status & Performance.List of Attendees & Presentation Handout Encl ML18039A8181999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20211B9661999-07-26026 July 1999 Informs That Sequoyah Nuclear Plant Sewage Treatment Plant, NPDES 0026450 Outfall 112,is in Standby Status.Flow Has Been Diverted from Sys Since Jan 1998 ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML20210G8051999-07-22022 July 1999 Discusses DOL Case DC Smith Vs TVA Investigation.Oi Concluded That There Was Not Sufficient Evidence Developed During Investigation to Substantiate Discrimination.Nrc Providing Results of OI Investigation to Parties 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20217M4461999-10-20020 October 1999
[Table view]Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML18039A9021999-10-15015 October 1999 Forwards LER 99-010-00 Re Occurrence of Plant Reactor Scram Due to Main Turbine Trip Which Resulted in Main Steam Moisture Separator.All Plant Safety Systems Operated as Designed in Response to Event ML18039A8961999-10-14014 October 1999 Forwards LER 99-009-00,re Manual Reactor Scram on Unit 2 from 54% Power,Iaw 10CFR50.73(a)(2)(iv).All Plant Safety Sys Operated as Designed in Response to Event ML18039A8931999-10-0808 October 1999 Forwards LER 99-008-00,concerning HPCI Sys Being Declared Inoperable,Iaw 10CFR50.73(a)(2)(v).There Are No Commitments Contained in Ltr ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util 981023 Ltr.Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML18039A8181999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 ML18039A8081999-06-28028 June 1999 Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF ML18039A8111999-06-25025 June 1999 Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 ML20196F8131999-06-22022 June 1999 Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld ML18039A8051999-06-22022 June 1999 Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA ML18039A8031999-06-18018 June 1999 Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days ML20195G1821999-06-0808 June 1999 Requests NRC Review & Approval of ASME Code Relief for ISI Program.Encl 1 Provides Relief Request 1-ISI-14 That Includes Two Attachments.Encl 2 Provides Copy of Related ASME Code Page ML20195E9521999-06-0707 June 1999 Requests Relief from Specific Requirements of ASME Section Xi,Subsection IWE of 1992 Edition,1992 Addenda.Util Has Determined That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety ML20195D3321999-06-0101 June 1999 Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 ML18039A7931999-06-0101 June 1999 Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage ML18039A7891999-05-24024 May 1999 Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 ML18039A7911999-05-24024 May 1999 Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training ML20195B9361999-05-24024 May 1999 Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License ML20195B3631999-05-21021 May 1999 Requests Termination of SRO License for Tj Van Huis,Per 10CFR50.74(a).TJ Van Huis Retired from Util,Effective 990514 ML20206U6551999-05-14014 May 1999 Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 ML20206Q8791999-05-13013 May 1999 Forwards L36 9990415 802, COLR for Sequoyah Nuclear Plant Unit 2,Cycle 10, IAW Plant TS 6.9.1.14.c 05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)1999-05-11011 May 1999 Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv) ML20206M9341999-05-10010 May 1999 Forwards Rept of SG Tube Plugging During Unit 2 Cycle 9 Refueling Outage,As Required by TS 4.4.5.5.a.ISI of Unit 2 SG Tubes Was Completed on 990503 ML20206Q8421999-05-10010 May 1999 Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) ML18039A7771999-05-0606 May 1999 Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments ML20206K6271999-05-0606 May 1999 Requests Termination of SRO License for MR Taggart,License SOP-21336 Due to Resignation on 990430 ML20206J2061999-05-0404 May 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME B&PV Code.Tva Requests Approval to Use Wire Type Penetrameters in Lieu of Plaque Type Penetrameters for Performing Radiographic Insps.Specific Relief Request,Encl ML20206H5901999-04-30030 April 1999 Forwards Notification of Revs to BFN Unit 2 Emergency Response Data Sys Data Point Library.Revs Were Implemented on 990413 1999-09-09 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML19325E9801989-11-0101 November 1989
[Table view]Requests That Author Name Be Placed on Distribution List Re Schedule of Hearing in Alchemie Case.W/Certificate of Svc. Served on 891101 ML20247Q4691989-08-0808 August 1989 Expresses Concerns Re Installation of RWCU Sys Sample Panel & Relation of Radioactive Water Flowing Through RWCU Sample Panel to Plant ML20245F4731989-07-0909 July 1989 Requests Assistance in Determining Why Util Mgt Does Not Want Author to See Proposed Corrective Actions for Four Condition Adverse to Quality Repts Issued While Employed at Facility ML20247F8061989-07-0505 July 1989 FOIA Request for Documentation Re Incidents of Drug &/Or Alcohol Abuse During Past Five Yrs Amoung Employees or Contractors ML20247E6951989-06-27027 June 1989 Advises That Newly Formed Environ Conservation Organization Intends to Oppose Any Util Actions That Might Impact Negatively on Future Operability of Facility ML20247H3631989-06-26026 June 1989 Advises of Formation of Resources Conservation Organization. New Group Intends to Oppose Any Util Actions That Might Impact Negatively on Future Facility Operability.Ad Rossin Will Serve as Organization Coordinator ML20246J9851989-06-17017 June 1989 Expresses Concern Re Potential Industrial Safety Hazard Resulting from Inclusion of Glass Rotameter in RWCU Sample Line at Plant ML20245B3981989-05-0808 May 1989 Discusses Technical & Safety Concerns Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels at Plant ML20245B4081989-03-10010 March 1989 Requests Response to 881014 & 890119 & 23 Ltrs Re Technical & Safety Concerns at Plant ML20244B0011989-03-0808 March 1989 Lists Facts to Consider for Action to Fix or Close GE Reactors Once & for All ML20245B4091989-01-23023 January 1989 Refers to Re Corrosion Inhibitors in Closed Water Sys at Plant.Last Sentence on First Page of Ltr Should Be Changed to Read One Example Is Loss of Air Cooling to Shutdown Board Rooms at Sequoyah ML20245B4101989-01-19019 January 1989 Requests That Jg Partlow Pursue Completion of Engineering Assignment of ED Buggs at Plant Concerning Corrosion Inhibitors for Closed Water Sys.Draft Engineering Rept Recommending Corrosion Inhibitors for Closed Water Sys Encl ML20206D8951988-10-15015 October 1988 Expresses Opinion That Plants Should Remain Closed Until Converted to Alternative Fuel Source ML20245B4121988-10-14014 October 1988 Informs of Several Technical Concerns Expressed While at Util & Requests That Jg Partlow Pursue Resolution of Listed Concerns ML20206D9711988-09-0808 September 1988 Forwards Ltrs Exchanged Between NRC & Author in 1984 Re Problems in Commercial Nuclear Power Field & Change in Federal Regulations to Allow Senior Reactor Operator to Deviate from Tech Specs in Emergency ML20206D9451988-08-12012 August 1988 Annotated Ltr Expressing Appreciation for Reply to & Assurance in Response to Concerns Pertaining to Operation of Ref Plants ML20245D6611988-08-0808 August 1988 Submits Listed Comments in Response to Re Safety Practice to Schedule Nuclear Plant Operating & Maint Personnel for 16 H Shifts &/Or Excessive Overtime ML20206E0281988-07-0707 July 1988 Advises That Nuclear Industry Overlooked Most Important Lesson Resulting from TMI Accident,To Wit,That Station Operator/Mgt Official Stationed in Control Room Would Have Prevented Accident ML20150A7961988-06-30030 June 1988 Comments on Util 880616 Request to Suspend Antitrust License Condition.Economic Advantages for Util Owning Nuclear Power Plants Have Failed to Materialize ML20155B6651988-06-16016 June 1988 FOIA Request for plant-specific Documents Re Fire Protection Requirements,Insp repts,hardware-specific Deficiencies & NRC Communications W/Util ML20151P0021988-05-18018 May 1988 Requests Consideration of Listed Points Re Proceeding Under 10CFR2.206 Instituted by NRC Per for Relief in Matter of Facility ML20206E0361988-04-29029 April 1988 Opines That 10CFR50.54(x) & (Y) Superfluous & Dangerous.Nrc Should Instruct Operators Not to Depart from Tech Specs in Emergency.Author Resume Detailing Experience in Commercial Nuclear Power Field Encl ML20155A7431988-02-24024 February 1988 Discusses Safety Problems at Comm Ed Nuclear Power Plants Re Risking Fuel Meltdown by Turning Off Safety Sys as Directed by Util Policy in Emergency If Core Cooling Is Adequate. Vice President Instruction Encl ML20148G9001988-02-0101 February 1988 FOIA Request for Documents Re 10CFR50,App R Insps & Enforcements ML20206E0431988-01-29029 January 1988 Expresses Concern Re Two Hazardous Practices at Ref Plants, Including Risking Meltdown by Authorizing Operators to Turn Off Nuclear Plant Safety Sys During Emergency ML20149G1051987-12-18018 December 1987 Opposes NRC Reduction at TMI-2.Reducing Staff Prior to Completion of Core Removal Inappropriate & Misguided Move. Recent Shutdown of Oyster Creek for Incident Re Destruction of Data Decreases Util Standing W/Local Residents ML17303A6161987-09-30030 September 1987 Forwards Scenario Review for Rancho Seco Emergency Preparedness Exercise,871104. Incomplete Scenario Provided for Review.Plant data,in-plant Chemistry & Radiological Data & Controller Info to Support Fire Drill Missing Elements ML20235T7341987-09-0101 September 1987 Requests That EIS Documents Re Meltdown Prepared by Impartial Sources Be Made Available to Public.Observation of Plant Life Indicates Level of Contamination of General Environ Causing Widespread Severe Damage ML20237L7171987-08-21021 August 1987 Forwards Comments on Plant Revised Cable Test Program. Industry Experience Adequate to Refute TVA Claims.Nrc Agreement W/Test Program Would Establish Lower than Necessary Stds as Precedents for Industry ML20238B2421987-08-13013 August 1987 FOIA Request for Final Summary Rept of Investigation by NRC Ofc of Inspector & Auditor of Allegations Re Facility & Related Witness Statements & Documentation ML20238B7731987-08-0707 August 1987 FOIA Request for Records Explaining Status of Listed LERs Omitted from List,Previously Received from Nrc,Of LERs Filed by Commercial Nuclear Power Plant Licensees for Operating Year 1986 ML20238E0261987-07-15015 July 1987 Responds to Recipient 870528 Response to Bg Strout Re Maine Yankee & Pilgrim.Author Distressed by NRC Answers & Requests Addl Response to Listed Questions ML20235L7061987-07-0808 July 1987 Opposes Util Application for Amends to Licenses,Allowing New Ownership & Financing Arrangement.Nshc Should Not Be Made W/O Public Hearings on Serious Financial Qualifications Questions ML20235K0421987-07-0202 July 1987 FOIA Request for List of All Licensed Reactor Operators & Senior Reactor Operators for Facilities ML20235F7451987-06-30030 June 1987 FOIA Request for Documents Re Safeteam Programs Being Used at Listed Facilities ML20215L5051987-06-23023 June 1987 Provides Brief Updated Rept on Status of Comm Ed Proposal Before State of Il Commerce Commission to Restructure Ownership & Other Financial Arrangements Re Facilities.Urges NRC Not to Make Finding Prior to Hearing ML20215L4871987-06-23023 June 1987 Urges NRC Not to Approve Comm Ed Request for Amend of Any OL Re Braidwood 1 & 2 & Not to Determine No Significant Hazard Exists W/O First Holding Adjudicatory Hearings on Serious Financial Qualifications Issues ML20215D6371987-06-12012 June 1987 Forwards Reply to Responses from NRC & B&W Owners Group. NRC Response Evidences No Independent Review of B&W Claims. Commission Urged to Take Personal Jurisdiction of Petition to Ensure That Latest Commitment Not Frustrated ML20236H1481987-05-30030 May 1987 Discusses Varga Reply to 870428 Mailgram Re Proof That LOCA Could Not Occur in Reactor Core at Plants.Evidence in Files of Repeated AEC & NRC Repression & Ignorance of Legitimate ACRS Concerns Cited.Congressional Hearings Requested ML20215K8391987-04-22022 April 1987 Opposes Licensing of Facilities for All the Same Old Reasons ML20214E2281987-04-16016 April 1987 FOIA Request for PRAs for Listed Plants Be Placed in PDR ML20214L0951987-03-13013 March 1987 Comments on Proposed Rule 10CFR50 Re Mod of Safety Rules to Enable Facilities to Startup Operation.Opposes Rule Due to Result of NRC Abdicating Responsibility as Protector of Safety of Populations Exposed to Radiation During Accidents ML20236D9381987-03-0404 March 1987 Partially Withheld Ltr Discussing Nuclear Power Industry Problems as Encountered During 6 Yrs of Employment at Limerick.Shoreham, & Hope Creek.Demotions & Terminations for Reporting Safety Concerns Described ML20215K8531987-02-24024 February 1987 Advises That Nassau County Board of Cooperative Educational Svcs Has Not Entered Into Any Agreement W/Lilco to Have Salisbury Campus Used for Relocation Facility in Event of Radiological Emergency ML20207T2381987-02-18018 February 1987 FOIA Request for Rept on Odds of Large Radioactive Release at Us Commercial Nuclear Reactors,Including Surry,Peach Bottom,Sequoyah,Grand Gulf & Zion ML20236D1281987-02-15015 February 1987 Forwards Preliminary Investigation of Worker Allegations About Safety of Plant Conducted by Gap in 1986.Investigation Revealed Enough Info to Raise Serious Questions Re Const Quality.Petition Per 2.206 Forthcoming ML20211B6601987-01-0505 January 1987 FOIA Request for Documents Re Allegations,Investigations, Fines,Convictions & Other Dispositions of Cases in Which Operators of Listed Facilities Charged W/Violating Federal whistle-blowing Statutes ML20207Q0971986-12-29029 December 1986 FOIA Request for Documents Re Util Proposed Reduction of EPZ at Seabrook,Changes to Containment at GE Plants, Including Pilgrim & Vermont Yankee & Insp of Pilgrim 1 Since Shutdown in Apr ML20215K9121986-11-26026 November 1986 Requests Opinion of Fairness of Shoreham Proceeding ML20212D7651986-11-12012 November 1986 Expresses Safety Concerns Re Containment Pressure Boundary, Based on 850916 Sser 1989-08-08 |
Text
_ _ _ _ _ _ _ ,
4 !F'
' %' 6. e
]
l "
409 Cameron Circle # 2402 Chattanooga, TN 37402 March 10, 1989 {
l l )
' Mr. James G.-Partlow, Director of Special Projects
. Nuclear Regulatory Commission ] 1 One-White / Flint North 1155 Rockville, Maryland 20852 ;
Dear Mr. Partlow:
1 This letter is in reference to my letters of October 14, 1988, l January'19, 1989, and January 23, 1989, describing technical-and safety _ concerns at Tennessee Valley Authority nuclear plants.
I am writing to confirm that you are receiving my letters.
Your reply.would be appreciated.
Sincerely, O.
Eugene D. Buggs 9906230162B@OO59 ADDCK O PDR PNV m __ P .-
-~
H um____ _ _ _
.]
[L i
a 3.
ENCLOSURES WITH LETTER TO MR. LANDO ZECH MAY 8, 1989
(
l-f.
-- ;