ML20245A528

From kanterella
Jump to navigation Jump to search
Forwards NRC Comments on BNL Draft Rept Beyond DBA in Spent Fuel Pools (Generic Issue 82), Dtd Jan 1987.NRC Intends to Consolidate Matl to Identify Major Areas of Concern & Develop Proposals for Resolving Each Area
ML20245A528
Person / Time
Issue date: 04/01/1987
From: Throm E
Office of Nuclear Reactor Regulation
To: Perkins K
BROOKHAVEN NATIONAL LABORATORY
Shared Package
ML20236K304 List:
References
CON-FIN-A-3786, FOIA-87-380, TASK-082, TASK-82, TASK-OR NUDOCS 8704150073
Download: ML20245A528 (1)


Text

1-8 01 APR 1987 Dr. Kenneth R. Perkins Department of Nuclear Energy Brookhaven National Laboratory Upton, New York 11973

Dear Dr. Perkins:

SUBJECT:

NRC COMMENTS ON BNL DRAFT REPORT "BEYOND DESIGN BASIS ACCIDENTS IN SPENT FUEL POOLS (GENERIC ISSUE 82)," DATED JANUARY, 1987 (FIN NO. A.3786)

Enclosed for your use are coments on the subject draft report concerning the ongoing GI-82 studies being performed by BNL. These cements were prepared by the following NRC organizations:

1.

Reliability and Risk Assessment Branch, DSRO, NRR 2.

Reactor Systems Branch, PWR.A, NRR 3.

Piant Systems Branch, PWR-A, NRR 4.

Engineering Branch, PWR.A, NRR 5.

Division of Engineering Safety, RES 6.

Division of Reactor Systems Safety, RES

8. -

Plant, Electrical, I&C Branch, PWR.B. NRR 7.

Engineering Branch, PWR.B; NRR While you examine these comments, we intend to consolidate the material to identify the major areas of concern and develop proposals for resolving each area of concern..I-plan to forward this compilation as soon as it is available. As discussed briefly on the telephone today, we wish to meet with BNL here in Bethesda around the 21st of April.

Original signed by3 Edward D. Throm, Task Manager Reactor Safety Issues Branch Division of Safety Review and Oversight

Enclosures:

1.

Memorandum from F. J. Congel to W. Minners, dated March 20, 1987.

2.

Memorandum from T. M. Novak to T. P. Speis, dated March 23, 1987.

3.

Memorandum from G. A. Arlotto to T. P. Speis, dated March 24, 1987.

4.

Memorandum from B. Morris to T. P. Speis, dated March 27, 1987.

l S.

Memorandum from F. J. Miraglia to T. P. Speis, dated March 27, 1987.

6.

Memorandum from F. J. Congel to W. Minners, dated March 30, 1987.

cc:

W. Kato, BNL DISTRIBUTION T. Pratt, BNL fentral File R. Bari, BNL DSR0 C/F W. Minners RSIB R/F G. Mazetis j T. Speis E. Throm /

B. Sheron 70 :DSRO:RS 4@ SIB y

TME :EThrom:jf

GMjYeis AT t : h.......... : k........... :............ :............ :............ :..

/ / /87

/\\ /87 OFFICIAL RECORD COPY 4

.~

oQ) 5 g/ gor

^

,