ML20245A394

From kanterella
Jump to navigation Jump to search
Notifies of CRGR Meeting 164 on 890614 & Submits Agenda
ML20245A394
Person / Time
Issue date: 06/06/1989
From: Jordan E
Committee To Review Generic Requirements
To: Bernero R, Goldberg J, Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF THE GENERAL COUNSEL (OGC)
References
NUDOCS 8906210331
Download: ML20245A394 (2)


Text

-__

.m a

3

  • SIGQ 1

f UNITED STATES

!\\

NUCLEAR REGULATORY COMMISSION 3,

p, 7

.E WASWNGTON. D. C. 20555 k..v.../

June 6, 1989 MEMORANDUM FOR:

Robert M. Bernero, NMSS Jack R. Goldberg, 0GC Carl J. Paperiello, RIII Denwood F. Ross, RES James H. Sniezek, NRR FROM:

Edward L. Jordan, Chairman Committee to Review Generic Requirements

SUBJECT:

CRGR MEETING N0. 164 The Committee to Review Generic Requirements (CRGR) will meet in the afternoon on Wednesday, June 14, 1989, in Room OWFN 48-11.

The agenda is as follows:

12:00-1:00 p.m.

The Committee will discuss the origins and proper use by NRC staff of the " compliance" and " adequate protection" exclusions of the Backfit Rule in review packages submitted for CRGR review on current issues.

(A background information package being prepared by the CRGR staff will be provided under separate cover.)

1:00-2:00 p.m.

R. Bosnak (RES) will present for CRGR review a proposed Amendment to the PTS Rule.

(A review package is enclosed.)

2:00-3:30 p.m.

L. Shao (NRR) will present for CRGR review 21 SRP sections revised to reflect new requirements and staff positions being implemented in connection with the Station Blackout Rule.

The staff will also present a briefing on the current status of a related topic, proposed Rev. 3 to Reg.

Guide 1.9, " Diesel Generator Reliability." (A review package is enclosed.)

3: 30-5: 00 p.m.

F. Gillespie (NRR) will present for CRGR review a proposed amendment to the property insurance rule, 10 CFR 50.54 (w).

(The review package is enclosed.)

If a CRGR member cannot attend the meeting, it is his responsibility to assure that an alternate, who is approved by the CRGR Chairman, attends the meeting.

Persons makfng presentations to the CRGR are responsible for (1) assuring that the information required for CRGR review is provided to the Committee (CRGR Charter - IV.B), (2) coordinating and presenting views of other offices, (3) as appropriate, assuring that other offices are represented during the presentation, and (4) assuring that agenda modifications are coordinated with the CRGR contact (J. Conran X29855) and others involved with the presentation.

Division Directors or higher management should attend meetings addressing f

agenda items under their purview.

//aiG EUE T0liR[{TDM QjJpg 3 b

0 G906210331 890606

~%*--

PDR REVGP NRCCRGR il PDC

%v w,3m,

, %m

p

g... : ;

_g-

,4 t.

In accordance with the ED0's March 29, 1984 memorandum to the Commission concerning " Forwarding of CRGR Documents to the Public Document Room (PDR),"

the review packages for items scheduled'at'this meeting, which contain predecisional information, will not be released to the PDR until the NRC has considered (in a public forum) or decided the matter addressed by the-information.

twgwi.l signad en E D Jwdan Edward L. Jordan, Chairman Committee to Review Generic n

l Requirements

Enclosures:

As stated cc w/ enclosures:

SECY V. Stello, Jr.

cc w/o enclosures:

Commission (5)

OIG J. Lieberman J. Partlow Regional Administrators W. Parler R. Bosnak L. Shao C. E. Rossi Distribution:

E! Jordan J. Heltemes J. Conran C. Sakenas P. Gill P. Randall C. Berlinger R. Fraley P. Kadambi (w/o enc.)

CRGR CF (w/o enc.)

CRGR SF S. Treby (w/o enc.)

M. Taylor, OED0-PDR (NRC/CRGR) (w/o enc.)

tentralli]e.(w/ocenc.-)

A OFC

AE00:CRGR :

AE0D:DD

C/

b.-!

bbh'~!.

$ $$$$_f _-_S.--"-- !---_.----___!____..-____!-___------- !------------

6/ /89 6/ [j/89 DATE $

6/ L/89

_ _ _ _ _ -. _ _ _ _ _ _ _ _. _ _ _