ML20245A160
| ML20245A160 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 04/21/1989 |
| From: | Hairston W GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 0051V, 51V, HL-391, NUDOCS 8904250081 | |
| Download: ML20245A160 (2) | |
Text
_
HL-391 0051V X7GJ17-H770 April 21, 1989 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 PHYSICAL SECURITY PLAN REVISION Gentlemen:
In accordance with the requirements of 10 CFR 50.54(p)(2), Georgia Power Company (GPC) hereby submits a report of changes made to the Physical Security Plan (PSP) for Plant Hatch Units 1 and 2.
This revision of the PSP ir.volves changes in the areas of:
- 1) position titles to reflect organizational
- changes, 2) search equipment surveillance requirements and acceptance criteria, 3) description of protected ared extensions, 4) personnel screening requirements,
- 5) provisions for Security personnel during a radiological emergency, 6) corrections to owner controlled area and protected area drawings, and 7) editorial corrections.
GPC has determined that the changes do not decrease the effectiveness of the PSP.
The changes are presented as an enclosure to this letter as is a justification for the determination of no decrease in safeguards effectiveness.
The information contained in the enclosures is SAFEGUARDS information and, in accordance with 10 CFR 73.21 should not be placed in the NRC Public Document Room.
SATEGUARDS INFORMATION EN0t0SURE CONTAINS SATEGUARDS INFORMATION UPON SEPARAil0N THIS PAGE IS DECONTROLLED
/
e9o42 _5cosi 890421e.w, jg 8
g 7
h
m l
U.S. Nuclear Regulatory Commission April 21, 1989 Page Two Should you have questions in this regard, please contact this office at any time.
Sincerely, nl.
- lb "T
W. G. Hairston, III SJB/eb
Enclosures:
1.
Copy of Marked Up Physical Security Plan Pages 2.
Justification for the Determination of No Decrease in Safeguards Effectiveness 3.
Clean Copy of Changed Physical Security Plan Pages c: Georaia Power Company Mr. H. C. Nix, Geaeral Manager - Hatch (w/o)
Mr. L. T. Gucwa, Manager Engineering and Licensing - Hatch (w/o) l Mr. D. Edge, Plant Hatch Security GO-NORMS (w/o)
LS. Nuclear Reaulatorv Commission. Washinaton. D.C.
Mr. L. P. Crocker, Licensing Project Manager - Hatch (w/o)-
Mr. R. B. Manili, Reactor Security Specialist - NRR U.S. Nuclear Reaulatory Commission. Reaion II i
Mr. S. D. Ebneter, Regional Administrator (? copies) l Mr. J. E. Menning, Senior Resident Inspector - Hatch (w/o)
)
I i
I i
SAFEGUARDS Mr0RMAT10N ENOLOSURE CONTAIN5 SAFECUARDS INFORMATION UPON SEPARAil0N THrs PAGE IS DECONTROLLED 4
1
________ - _ _ A