N UTILITIES o.n r.i Orrie... s.io.n str..t. e.riir.. Conn.ctier fest c0*#efCTCP poset ano ponte COMPa'8V l
warum u-mouann ucea.c co**'"
P.O. BOX 270
,,,0,7[2,,7u'uYe~o,,,
HARTFORD. CONNECTICUT 06141-0270 L
L J
,o,,,,,,,,w.,,,.co,,,,,
(203) 665-5005 June 12, 1989 MP-13192 Re:
10CFR50. 71 (a)
U.S. Nuclear Regulatory Commis!. ion Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating lice.nse No. DPR-65 Docket No. 50-336
Dear Sir:
This letter is forwarded to pr vide the report of operating and shutdown experience relating to Millston Unit 2 Monthly Operating Report 89-05 in accordance with Appendi:: A Technical Specifications, Section 6.9.1.6.
One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY AQ 1
GC W Steph E.
cace Station Superintendent Millstone Nuclear Power Station SES/GN:dlr cc:
W. T. Russell, Regien I A r.inistrator G. S. Vising, NRC Project Manager, Millstone Unit No. 2 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2 & 3 l
1 r
8906210066 890531 P
PDR ADOCK 05000336 R
PNU
/
l
I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-336 UNIT Millstone Unit 2 DATE 06/12/89 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Extension 4417 MONTH May 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nat)
(MWe-Net) 1 39 17 860 2
179 18 856 3
419 19 839 4
518 20 862 5
763 21 862 6
788 22 862 7
822 23 859 8
824 24 861 9
825 25 863 l
10 840 26 863 11 854 27 864 12 859 28 864 13 858 29 864 14 859 30 863 15 858 31 864 16 859 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net fcr each day in the reporting month.
Computer to the nearest whole megawatt.
OPERATING DATA REPORT DOCKET NO.
50-336 DATE 06/12/89 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Extension 4417 TING STATUS l
)
- Unit Name
- Millstone Unit 2
' Notes: Items 21 and 22 mumm lReportingPeriod: May 1989 cumulative are weighted ILicensed Thermal Power (MWt): 2700 averages.
Unit operated Nameplate Rating (Gross MWe):
909 at 2560 MW thermal prior pesign Electrical Rating (Net MWe): 870 to its uprating to the paximum Dependable Capacity (Gross MWe):
current 2700 MW thermal iB93.88 power level.
haximum Dependable Capacity (Net NHe):
~-
B62.88
$f Changes Occur in Capacity Ratings (Items Number 3 Through )
ince Last Report, Give Reasons: N/A l
ower Level to Which Restricted, If Any (Net MWe): N/A l
feasons For Restrictions, If Any: N/A l
I
~
This Month Year to Date Cumulative fours In Reporting Period 744 3,623 117,743 lumber Of Hours Reactor Was Critical 744.0 1,666.4 85,999.8
~-
Leactor Reserve Shutdown Hours 0
0 2205.5 tours General On-Line 731.3 1,551.6 81,617.0 init Reserve Shutdown Hours 0
0 468.2 iross Thermal Energy Generated (MWH) 1,833,467.0 4,046,170.0 226,697,450.0 gross Elec. Energy Generated (MWH) 600,649.5 1,321,675.5 68,152,196.0 Jet Electrical Energy Generated (MWH) 577,757.5 1,258,346.5 65,367,493.0
-25 nit Service Factor 98.3 42.8 69.3 nit Availability Factor 98.3 42.8 69.7 nit Cap' city Factor (Using MDC Net) 90.0 40.3 65.4
~~
nit Capacity Factor (Using DER Net) 89.3 39.9 64.4 nit Forced Outage Rate 0.0 0.0 14.5 hutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i f Shutdown at End of Report Period, Estinated Date of Startup:
N/A its in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION
~ N/A N/A t
..i.i i
1 7 v
c gn nas e c
91 i
n ao ot nl r
74 t
e f
t m i aei u
2 1 4 c
r o
u tD cF o
9N-eor dos c
i S
e8O7 n rt u nn u
ufL) n/R 4 o r
c oaeo ro R
e o2E 4i one i
ci t
rE m
6t 1N s
CoR t gnv snoL a
3 s/
n i
anae nof(
S
)
3l 6 3 e
& tt uinr Ii
- l 0G0t cn nl ep t st) 0i 2 x eAe i et
~ at r1 5 M E
s v
t unm reo6 1
(
u e
nfi o G a e p1
.EEYE a
r oear ph e0 t
OMTBN C
P Crmf t eSR -
i NAA O
i r G
b NDDH bP ytE i
T EP i
rnR h
h rt eU x
KI EL n
xonvN E
CN LE es EfEE(
5 OU PT ne A
4 D
M od
/
O po N
C mC o
C m
n
)
amho) n md A
roti0i ee
/
mcrnt a
t d N
aSf oc=l so r
mu p
yC ccd d nx S
Si eseoE t uuRi(
S ll ano t
N aamiirar O
duuot vere I
onnt newuh T
e i
h aauoroDt C
e tMMAC pP( O U
stt e-D nnr A
M1234 5
6 E
eeo
/
3 R
9 cvp N
8 i E e R
9 L
R E
1 n
W o
O y
i P
a 3
t M
r a
D f
o n
N H
o gt i
A T
nc m
N dia a
S O
ot e 1
x N
M htR E
W t u O
T eh n e
)
)
D R
MS w n
s n
T O
o i
n i
U P
D a
e a
H E
l c
l S
R p
ni p
2 x
oL x
T n
E
_i E
I o
( t t&
(
N s
s c
U a
C ee ig r
e rT rn o
R u
ti r) l r sner n io eivEi a
R ai a
F e rtll c
yT a a p n
t ngr rnx o) nanort oE i s enit osiI t r 7
mel atit au pt el anar ro 2
ninuurire uH 1
ouif gemeh D(
s q a e e pd pt aEMRROAOO e-RABCDEFGH 2
lepy S
T de 4
l 0
d u e
2 ed t
0 ce a
9 rh D
8 oc FS o
1 FS N
0 I
l l
REFUELING INFORMATION REQUEST Name of facility: Millstone 2 Scheduled date for next refueling shutdown: Auaust, 1990 Schedule date for restart following refueling:
N/A Will refueling or resumption of operation thereafter require a technical specification change or other license muendment?
Not at this time Scheduled date(s) for submitting licensing acticn and supporting information:
- NONE, Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance
~
analysis methods, significant changes in fuel design, new operating procedures:
Not at this time The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
In Core:
(a) 217 (b) 640 The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
v l
Currently 1277 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capaci.ty:
1994, Spent Fuel Pool Full, cole off load capacity is reached (without cons lidation).
1996 Core Full, Spent Fuel Pool Full 2009, Spent Fuel Pool Full, core off load capacity as reached -
contincent upon full scale storace of consolidated fuel in the Spent Fuel Pool.
i s
,