Special Rept:On 890529,end-of-Cycle 2 ECT Insp of Steam Generator Tubes & Number of Tubes Plugged in Each Steam Generator Completed.Encl Table 1 Summarizes Results.Complete Results Will Be Submitted within 1 Yr
ML20244E515
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/13/1989
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-13197, NUDOCS 8906200377
Download: ML20244E515 (2)


Text

--

s w.

< N UTILiftES o.n.,.i Or,ic... s.io.n sir..t. s.,iin. conn.ciicui v e co weics, us.a ac eoma cw-1 mrs= %. ras ucm.c c""

P.O. BOX 270

,,,,,,[.j'],[l",",' " ",,,,

HARTFORD. CONNECTICUT 06141-0270 k

k J

(203) 665-5000

.,. v,uca

..com June 13, 1989 MP-131H U. S. Nuclear Regulatory Comission Document Control Desk Washington, D.C.

20555 Gentlemen:

Millstone Nuclear Power Station, Unit 3 STEAM GENERATOR TUBE PLUGGING This special report is being submitted within 15 days pursuant to Millstone Unit 3 Technical Specification Section 4.4.5.5.a.

Plant Technical Specification 4.4.5.5.a requires a special report be submitted to the NRC following the completion of each inservice inspection of steam generator tubes and the number of tubes plugged in each steam generator.

The end-of-Cycle 2 ECT inspection was completed on May 29, 1989. Table 1 sumarizes the results. A total of 5033 tubes (22 percent of the total) were inspected in two of the four SGs.

Three tubes were identified as having flaws in excess of the technical specification plugging limit of 40 percent throughwall.

The flaws were located adjacent to antivibration bars. These tubes were plugged (SG A R48/C97, SG a R50/C26, SG A R50/C95).

In addition, another tube (SG A R1/Cl22) was plugged on a discretionary basis due to the presence of a distorted ECT signal.

The complete results of the steam generator tube inservice inspection will be submitted within 12 months in accordance with Plant Technical Specification 4.4.5.5.b.

The licensee contact for this special report is Larry Loomis who may be reached at (203) 444-5468.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 1

axc-Step n E. Scace Station Superintendent Millstone Nuclear Power Station SES/LEL:d1r Attachment ec: D. H. Jaffe, NRC Project Manager, Millstone tinit No. 3 i

W. T. Russell, Region I i

W. J. Raymond, Senior Resident Inspector W. D. Romberg, Berlin E. J. Mroczka, Berlin 8906200377 890613

%EN

{DR ADOCK 05000423

?:,. :.

hh

, : <. lj

,i

.c-L L,

l c

TABLE 1 o

l r,

1 MILLSTONE POINT, UNIT 3-j; 1989 EDDY' CURRENT INSPECTION'

SUMMARY

,.4 TOTAL

~SG A SG B SG C.

' SG D

. TOTAL TUBES 22,504 5,626 5,626

-5,626 5,626

. TUBES INSPECTED' 5,033 2,553

- 0 2,480-0

. TUBES WITH MAXIMUM 3

3 0

0 0-l'

' FLAW 240 PERCENT '

TUBES WITH MAXIMUM 25 22 0-3 0

FLAW <40 BUT 220 PERCENT TUBES PLUGGED AS'A RESULT 4

4 0

0 0-OF THIS INSPECTION' I

'r.'

c

.... --