VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 i
GOVERNOR HUNT ROAD VERNON, VERMONT 05354 June 10, 1989 VYV 89-109 l
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of May, 1989.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.
de:
bse Warren P.
Murp y Vice Pre ident an Manager of Operations cc:
'i l 8906200177 890531 l
PDR ADOCK 05000271 R
puu
1.
i VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 89-05 FOR THE MONTH OF MAY, 1989 i
DP 0411 Rev. 2 Page 1 of 1
OPERATING DATA REPORT L-DOCKET NO.
50-271 DATE 890610 COMPLETED BY G.A.
Wallin-TELEPHONE (802)257-7711 L
OPERATING STATUS 1.
Unit Name:
Vermont Yankee
~ NOTES:
2.
Reporting Period:
May 3.
Licensed Thermal Power (MWt):
1593 L
4.
Nameplate Rating (Gist. MWe):
540
-5.
-Design Electrical Rating (Net MWe): 514(oc) 504(cc) 6.-
Maximum Dependable Capacity (Gross MWe): 535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7)since last report, give reasons:
N/A 9.
Power level to which restricted, if any(Net MWe):
N/A 10.
Reasons for restrictions, if any:
N/A This Month Yr-to-Date Cumulative 11.
Hours In Reporting Period 744.00 3623.00 12.
Number Of Hours Reactor was Critical 744.00 2279.18 115528.86 13.
Reactor Reserve Shutdown Hours 0.00 0.00 0.00 14.
Hours Generator On-Line 744.00 2236.65 112840.07 15.
Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.
Gross Thermal Energy Generated (MWH)1181116.00 3278480.50 165975186.50 17.
Gross Electrical Energy Generated 400602.00 1105665.00 55268036.00 18.
Net Electrical Energy Generated (MWH)383677.03 1057808.00 52466730.00 19.
Unit Service Factor 200.00 61.73 77.11
~
20.
Unit Availability Factor 100.29 61.73 77.11 21.
Unit Capacity Factor (Using MDC Net) 102.32 57.93 71.14 H
22.
Unit Capacity Factor (Using DER Net) 100.33 56.80 69.76 23.
Unit Forced Outage Rate O_. AD 0.00 _ _
5.97 24.
Shutdowns scheduled over next 6 months Type, Date, and Duration of Each): N/A
'2 5.
If shut down at end of report period, estimated date of startup: N/A 26.
Units In Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 DP 0411 Rev. 2 Page 1 of 1 RT No. 13.F01.19F
3 fg W,.
a;
- a...
c.2 w.i W
' '4.j (V y',
t.
i j.]
'.y, q tyn
.. AVERAGE DAILY UNIT. POWER: LEVEL'.
d a:
yp v3- :>'>
DOCKET NO.'50-271 UNIT~ Vermont Yankee-
- DATE.890610
' COMPLETED BY G.A.
Wallin TELEPHONE- (802)257-7711 si:v.
c
' lMONTH ~
May
. DAY iAVERAGE DAILY' POWER LEVEL--
DAY AVERAGE' DAILY POWER LEVEL
. (MWe-Net)
'(MWe-Net) 1.1 521 17.
519-2.-
-521-18.
.517 1
3.
521 19.
517 i
!4..
521 20.
516-5.
521 21.
514
- 6,'
521 22.
514 17.-
515 23.
490 8.
520 24.
515 9.
520 25.
514
_ 10.
519 2 6. -
499 11, 520.
27.
509 12.
519
'28.
512-13.-
517 29.
513 4
' 14.-
514-30.
515-
' 15..
519 31.
516
.16.
518 j
' INSTRUCTIONS:
On-this format, list the average daily unit power level in MWe-Net I
for each day in the' reporting month.
Compute to the nearest whole megawatt.-
VYDPF 0411.02
.DP 0411 Rev. 2
- Page-1 of 1 RT No. 13.rO1.18V J-L'
sa e
sl e
e 1
ep e
k 1
r e sase e
n n7 pR nt nl c
a i 7 e
oaei r
Y l -
v r
iDcF u
l 7 i e i.
t i
o t
a5 t
c ad cfL)
S 1 n0W2 c
n i
uo R
7 o1
)
e e
B o r
rE e
2 m6 2
r r
Tn t noL m
A. 8 0
r r
Ae sof(
a
- r0 o
u l
ni S
0 e9 5v8 G(
c c
0 o It st) e 4 s at r1 oEETE dor
- reo6 NMTBN nt 9 r.
Gaep1 I
AA O
a t
7 od phe0 TNDDH nn ti teSR t
E EP eoe yao i r G
CI EL ut e l ue i
rnR i
ON LE acr u gl h rt eU h
M F rs EfEE(
E O
C 4
5 m) t an n
ri e
K mca n
R aSl o
B r
p pe T
ccx md 5 K
SiE oo C
t(
cC ll a aamr
- uuoe d nnth m
oaaut e
hMMAO t e t
sd B
e-yo4 E
M1 23 4 sC 3
S n
N o
O e
s i
I s
t t
T nt r A
a C
eno
/
n U
cep N
i D
i ve m
E Y
LER a
R A
x M
E R
E n
a W
w s
O o
)
n
)
P H
D3 n
n e
n T
f o
i c i D
N og ri a
i a
N O
nr et l
L l
A M
di o 4 wc p
n p
ott ou x
od x
S T
ht c Pd E
i n E
N R
t ua e
( t t a
(
W O
eh e R
s c
O P
MSR ee i g r
D E
rT rn o
T R
u ti r
U n
l r sner N
o i o eivE S
s a
R ai 2 a A
F e rtl T
e c
yTaa I
R t ngr rn)
N nanort on U
enit osii n
mel atit a o)
- pt el anal is 0
ninuuri rp ouif gemex t r 0
s q a e e pd pE au ro 0
aEMRROAO(
uh e - - - - - - - -
D(
RABCDEFGH 2
e 1 p y
F T
W d
8 6
e 1
e 2
l 2
t 5
d u 3
1 a
0 ed 0.
0 D
9 ce
.v1 F.
8 rh 1 e oc 1 Rf3 FS 4
o1 01 3
1i.
0 FS F4 o
P0 eN o
9 D
g N
8 1
YP aT VDPR
DOCKET NO. 50-271
[.'n**'
UNIT Vermont Yankaa j *'
DATE 890610 COMPLETED BY G.A.
Wallin TELEPHONE (802)257-7711 REPORT MONTH May
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 39.7% of rated thermal power for the month.
Gross electrical generation was 400,602 MWHe or 99.7% design electrical capacity.
Oparating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 99.9%
of rated thermal power.
890523 At 2350 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94175e-4 months <br />, began cooling tower operations and went to a hybrid cycle of operation.
Varying modes of cycle operation from this point on will be based upon river temperature considerations.
890526 At 1725 hours0.02 days <br />0.479 hours <br />0.00285 weeks <br />6.563625e-4 months <br />, power was reduced to 79% in order to open the 79-40 ATB and replace a faulty air pressure regulator solenoid.
(See Unit Shutdowns and Power Reductions) 890526 At 2019 hours0.0234 days <br />0.561 hours <br />0.00334 weeks <br />7.682295e-4 months <br />, the air pressure regulator solenoid was replaced.
The 79-40 ATB was closed and a return to full power was initiated.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.