ML20244D987

From kanterella
Jump to navigation Jump to search
Forwards Proprietary & Public Versions of Revised Epips, Consisting of Rev 9 to EPIP 1.1,Rev 0 to EPIP 1.1.1,EPIP-22, EPIP-23,EPIP-24 & EPIP-25
ML20244D987
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/17/1989
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19297H557 List:
References
CON-NRC-89-046, CON-NRC-89-46 VPNPD-89-222, NUDOCS 8904240239
Download: ML20244D987 (1)


Text

,

0 WISCONSIN Electnc eowca coursur 231 W. MICHIGAN P.O. BOX 2046, MILWAUKEE Wl53c.1 (414)221-2345 VPNPD-89-222 NRC-89-046 April 17, 1989 U.

S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station Pl-137 Washington, D. C.

20555 Gentlemen:

POCKETS 50-266 AND 50-301 ENERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

(

Enclosed is one copy of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual.

These revisions consist of page changes which should be filed in your copy of the subject document in accordance with the attached instructions.

Please note that the procedures and forms containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE".

Copies of the affected procedures and forms, with numbers deleted, are provided and are stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents room.

Very truly yours,

G?

GW y C. W. Fay Vice President Nuclear Power Enclosure Copies to NRC Resident Inspector (without enc.)

NRC Incident Response Center, Region III OYW hlsc h r \\ ersitit

/

J ysu#&

M;y";k ay L