ML20244D581
| ML20244D581 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/14/1989 |
| From: | Hannon J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20244D584 | List: |
| References | |
| NUDOCS 8904240017 | |
| Download: ML20244D581 (6) | |
Text
- - - - - _ - - - _ - _ _., - - _ - - _ _ - _ _ _ - - - - _ - _ _ _ - - _ _ - - _ _ _ - - _ _ _ _
k2 840
. [
o UNITED STATES g
[
g.
NUCLEAR REGULATORY COMMISSION 7,
i E-WASHINGTON, D. C. 20655
'+9 * * * * *,d WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-266 POINT BEACH NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 117' License No. DPR-24 1.
The Nuclear Reg'ulatory Comission (the Comission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company (the licensee) dated March 23, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amenoment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
i i
8904240017 890414 PDR ADOCK 05000266 P
]
i
. 2..
Accordingly, the license is amended by changes to the Technical Specifications as' indicated in the. attachment to this license amendment, and paragraph 3.B of Facility Operating License No.
DPR-24 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.-117, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
Thislicenseamendmentiseffectiveat4:15PM(EDT)onApril 15, 1989.
F0P. THE NUCLEAR REGULATORY COMMISSION b
w ej,S/ ]f W
t John N. Hannon, Director Project Directorate III-3 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
~
Attachment:
Changes to the Technical Specifications Date of Issuance: April 14, 1989
l p rat
[(j
[;g o
UNITED STATES i
g NUCLEAR REGULATORY COMMISSION g
E WASHINGTON, D. C. 20555
\\...../
WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-301 POINT BEACH NUCLEAR PLANT UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.120 License No. DPR-27 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company (thelicensee)datedMarch 23, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the-Act).. and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in ccnformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amenament will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
I l
I l
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendnent, and paragraph 3.B of Facility Operating License No.
DPR-27 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.120, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendinent is effective at 4:15 PM (EDT) on April 15, 1989.
FOR THE NUCLEAR REGULATORY COMMISSION y + gg W Wss 2 v z-
.{ John N. Hannon, Director Project Directorate III-3 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 14, 1989 l
l I
l i
(
I-l
~
' ATTACHMENT TO LICENSE AMENDMENT NOS.117 AND 120 TO FACILITY OPERATING LICENSE NOS. DPR-24 AND DPR-27 DOCKET NOS. 50-266 AND 50-301 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page is identified by amendment number and contains marginal lines indicating the area of change.
l REMOVE INSERT 15.5.4-1 15.5.4-1
i 15.5.4 FUEL STORAGE Applicability Applies to the capacity and storage arrays of new and spent fuel.
Objective To define those aspects of fuel storage relating to prevention of critical-ity in fuel storage areas.
Specification 1.
The new fuel storage and spent fuel pool structures are designed to withstand the anticipated earthquake loadings as Class I structures.
The spent fuel pool has a stainless steel liner to ensure against loss of water.
2.
The new and spent fuel storage racks are designed so that it is impossible to store assemblies in otMr than the prescribed storage locations. The fuel is stored vertically in an array with sufficient center-to-center distance between assemblies to assure Keff < 0.95 with the storage pool filled'with unborated water and with the fuel loading in the assemblies limited to 44.8 grams of U-235 per axial centimeter of standard fuel assembly and 40,0 grams of U-235 per axial centimeter of 0FA fuel assembly. An inspection area shall allow rotation of fuel assemblies for visual inspection, but shall not be used for storage.
3.
The spent fuel storage pool shall be filled with borated water at a concentration of at least 1800 ppm boron whenever there are spent fuel assemblies in the storage pool.
4.
Except for the two storage locations adjacent to the designated s' lot for the spent fuel storage rack neutron absorbing material surveil-lance specimen irradiation, spent fuel assembly storage locations immediately adjacent to the spent fuel pool perimeter or divider walls shall not be occupied by fuel assemblies which have been suberitical for less than one year.
Unit 1 - Amendment No. M,77,26.117 15.5.4-1 Unit 2 - Amendment No. /J,$J.M. 120
- _ _ _ _ _ _