Application for Amend to License DPR-3,consisting of Proposed Change 209,changing Tech Specs Re Control Room Emergency Air Cleaning Sys.Change Proposed to Reflect Compliance W/Tmi Item III-D.3.4
ML20244D380
Person / Time
Site: Yankee Rowe
Issue date: 04/14/1989
From: Drawbridge B
YANKEE ATOMIC ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20244D381 List:
References
TASK-3.D.3.4, TASK-TM BYR-89-71, NUDOCS 8904210315
Download: ML20244D380 (3)


Text

\ ,

s.

YANKEEATOMICELECTRIC COMPANY "'lA)l"%o"g"joWi"g'"

1 -

580 Main Street, Bolton, Massachusetts 01740-1398 y

April 14, 1989 BYR 89-71 PC - 209 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

References:

(a) License No. DPR-3 (Docket No. 50-29)

(b) Letter, FYR 84-18, YAEC to USNRC, " Technical Specification Changes (PC-139, Supplement No. 5)," dated January 23, 1984 (c) Letter, NYR 86-106, USNRC to YAEC, " Modification of Technical Specifications (PC-139)," dated May 14, 1986 (d) Letter, FYR 82-15, YAEC to USNRC, " Revision to the Proposed Control Room Emergency Air Filtration System for the Yankee Nuclear Power Plant," dated February 4, 1982 (e) YAEC to USNRC, Telecopy of February 26, 1982, docketed March 5, 1982, " Yankee Control Room Emergency Filtration System: Provisions for System Design" (f) Letter, NYR 82-118, USNRC to YAEC, "NUREG-0737 Item III.D.3.4, Control Room Habitability," dated May 28, 1982

Subject:

Control Room Emergency Air Cleaning System (CREACS) Technical Specification, Proposed Change No. 209

Dear Sir:

Pursuant to Section 50.90 of the Commission's Rules and Regulations, the Yankee Atomic Electric Company (YAEC) hereby requests the authorization to make the following change.

Proposed Change Reference is made to the Technical Specifications of License No. DPR-3 of the Yankee Nuclear Power Station. We propose to replace the existing Technical Specification 3.7.5, " Control Room Ventilation System Emergency Shutdown," with the attached Technical Specification 3.7.5, " Control Room Emergency Air Cleaning."

Description of Change

1. Page 3/4 7-18. " Control Room Ventilation Emergency Shutdown," would be replaced with Pages 3/4 7-18 and 18a, " Control Room Emergency Air Cleaning."

'l ggg42;gg;ggggggg,,

P PDC

United States Nuclear Regulatory Commission Page 2 Attention: Document Control Desk BYR 89-71

2. Bases 3/4.7.5, " Control Room Ventilation Emergency Shutdown," would be replaced with Bases 3/4.7.5, " Control Room Emergency Air Cleaning."

Reason and Basis for Change This change is proposed to reflect the Control Room Emergency Air Cleaning System installed to satisfy the requirements of NUREG-0737, Item III-D.3.4, " Control Room Habitability." It should be noted that this proposed change is a resubmittal of item numbers 26 and 27 of Reference (b) and is further discussed in Attachment A of this letter.

Safety Consideration 1

l This change is requested in order to ensure, through operability and surveillance requirements, the enhanced protection afforded Control Room personnel by the Control Room Emergency Air Cleaning System. As such, this proposed change would not:

l l

1. Involve a significant increase in the probability or consequences of i an accident previously evaluated. The enhanced protection afforded Control Room personnel would further assure their ability to I mitigate such accidents.
2. Create the possibility of a new or different kind of accident from any previously analyzed. The operational and surveillance requirements of the proposed change will not affect the Control Room environment, thereby assuring the continued operation of both personnel and equipment and thus will not create the possibility of a new or different kind of accident frem any previously analyzed.

1 i 3. Involve a significant reduction in a margin of safety. The proposed change shall assure the margin of safety afforded Control Room personnel is maintcined through its operability and surveillance requirements.

Based on the consideration contained herein, it is concluded that there is reasonable assurance that operation of the Yankee plant, consistent with the proposed Technical Specification, will not endanger the health and safety of the public. This proposed change has been reviewed by the Nuclear Safety Audit and Review Committee.

l l Schedule of Change l

This change to the Yankee Technical Specifications will be implemented upon Commission approval. A timely review and approval of this submittal would be appreciated.

4 United States Nuclear-Regulatory Commission Page 3_.

Attention: Document Control Desk BYR 89-71 We trust that you will find'this submittal satisfactory; however, should ,

you desire additional information, please contact us.

Very truly-yo ,

/EE ATOMIC E CTRIC COMPANY Y

D 84 t'

. L. Draw idge Vice Preside nager of Operations

'LHH/0309v Attachments COMMONWEALTH OF MASSACHUSETTS)

)ss MIDDLESEX COUNTY )

Then personally cppeared before me, B. L. Drawbridge, who .being duly sworn, did state that he is Vice President and Manager of Operations-of Yankee Atomic Electric Company, that he is duly authorized to execute and. file the foregoing document in the name and on the behalf of-Yankee Atomic Electric Company and that the statements therein are true to the best of his knowledge and belief.

d . x t1A v ~

Helen D. Sammarco Notary Public My Commission Expires November 7, 1991 cc: USNRC Region I USNRC Resident Inspector, YNPS

. _ - _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ - - _ - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ - _ - - -