Forwards Spent Limestone Monitoring Program Results, Per License Condition 16
ML20244D321
Person / Time
Site: 07000036
Issue date: 04/07/1989
From: Rode J
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20244D325 List:
References
25412, NUDOCS 8904210287
Download: ML20244D321 (1)


Text

_

70-8[:i o

q>

E@KETID 9

p COIRBUSTION. ENGINEERING D8NM April 7, 1989 t},

APR131sgg)y' NMSS o$cI((c]0N Leland C. Rouse g

,g Fuel Cycle Safety Branch i

'4 4

Division of Industrial and t

~

Medical Nuclear Safety U. S. Nuclear Regulatory Commission fg APRl31989 I.1 Washington, DC 20555

( :// yg& NUCLEAR REGULATRE.}

Docket 70-36 CogSg10N license #SNM-33

SUBJECT:

SPENT LIMESTONE RESULTS q

Hallsection sd

Dear Mr. Rouse:

dg Enclosed is a report on the spent limestone mon oring program required by Condition #16 of SMN-33.

The monitoring was conducted to determine the radioactive content of spend limestone and to assess any possible environ-mental effects of using spent limestone as fill material in the on-site unrestricted area.

Information has previously been submitted on uranium content and isotopic composition, activity in dust from tumbling contaminated limestone, Tc-99 activity levels and solubility test results.

The sampling program results show that survey and release procedures started in 1979 are effective in that all spent limestone currently used as fill material is well below the 30 picocuries per gram limit for unrestricted release specified in Option 1 of the Branch Technical Position Paper on residual radioactivity levels.

Pre-1979 spent limestone is only 50% of the Option 1 limit.

Therefore, we request approval of:

1. Unrestricted release of spent limestone currently in place as fill mater-ial (Pile A and C).
2. Disposition of the pre-1979 spent limestone (Pile B) as on-site unre-stricted area fill material.
3. Establishment of current spent limestone survey methods as an approved procedure for releasing spent limestone as on-site unrestricted area fill material.

We will be glad to discuss the monitoring program results with your or your staff at your convenience.

Respectfully submitted, kf 1

J. A. Rode, n

j Plant Manager

[pj JAR /ead/16039 Power Systems Post Office Box 107 (314) 937-4691 Combustion Engineering, Inc.

Highway P (314) 296-5640 036 25412 C

PDC 1